Sample Gantt Chart

The document presents a Gantt chart showing the timeline and activities for a project called Project Spider 2.0 from September 2023 to June 2024. The project aims to strengthen pupils' intellectual development through enhancing reading competency. Key activities include administering pre-tests, profiling learners, developing learning materials, attending professional development, implementing interventions, and conducting reading activities.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
457 views1 page

Sample Gantt Chart

The document presents a Gantt chart showing the timeline and activities for a project called Project Spider 2.0 from September 2023 to June 2024. The project aims to strengthen pupils' intellectual development through enhancing reading competency. Key activities include administering pre-tests, profiling learners, developing learning materials, attending professional development, implementing interventions, and conducting reading activities.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Republic of the Philippines

Department of Education
REGION II– CAGAYAN VALLEY
SCHOOLS DIVISION OF THE CITY OF ILAGAN
SAN IGNACIO ELEMENTARY SCHOOL

GANTT CHART OF PROJECT SPIDER 2.0

(STRENGTHENING PUPILS’ INTELLECTUAL DEVELOPMENT


THROUGH ENHANCEMENT IN READING COMPETENCY)

February 2024
January 2024
October 2023

March 2024
September

June 2024
April 2024
November

December

May 2024
ACTIVITY

2023

2023

2023

Administer the
Pre-Test of the
PHIL IRI both
in English
Profiling of
learners using
the Pre-test
Result
Development or
crafting
contextualized
learning
materials
Attend SLAC on
ELLN and other
professional
development
activities in
reading.
Implementation
of the
interventions
proposed by the
proponent.
Conduct of
reading
Activities

Prepared by:

MAVIS P. ALLAUIGAN
Teacher III

_____________________________________________________________________________________________
Address: Purok 3, San Ignacio, City of Ilagan, Isabela
Contact No.: 09171401575
Email: [email protected]

You might also like