DEPARTMENT OF INDUSTRIAL ENGINEERING TECHNOLOGY

MANUFACTURING SYSTEMS DESIGN

MFDMIA2

TEST I
TIME - 2hrs 01/04/2022

Answer all questions

QUESTION 1

A CNC lathe machine is programmed to turn a tapered shaft. The cycle time is 22.0 min.
Time to load and unload is 4.5 min.

a) Loading and unloading is done manually on the machine. Determine the Cycle time
and hourly production rate? (4)

b) If the machine tool is fitted with an automatic pallet changer that interfaces with a
parts storage unit whose capacity is 12 parts, and reposition time = 25 sec. Calculate
cycle time and hourly production rate?

(4)

c) How long will it take a worker to perform the loading and unloading of the 12 parts?
How long will the machine operate unattended between parts changes?

(4)
[12]

QUESTION 2
A new forging plant must supply parts to a retail outlet. The plant will operate 24
hour/day, 5 days/week, and 50 weeks/year. The total output from the plant must be 900
000 forgings in batches of 1200 parts per year. Anticipated Scrap rate is 2%. Each
forging cell will consists of a furnace to heat the parts, a forging press and a trim press.
Parts are placed in the furnace an hour prior to forging, they are then removed, forged and
trimmed one at a time. The cycle time is 1.5 mins per part. Each time a new batch is
started, the forging cell must be set up again, which consists of changing the forging and
trimming dies for the next batch. This takes 3.5 hours on average. Each cell is considered
to be 96% reliable during operation and 100% reliable during changeover.

a) Determine the number of forging cells that would be required in the new plant

(10)
b) What is the proportion of time setup for each batch?

(2)

[12]

QUESTION 3

3.1 What is a manual assembly line? (2)

3.2 What is the difference between blocking and starving? (4)

3.3 A new product is to be assembled on a manual assembly line. The line is to be


designed to produce 180 000 units/year. Work content time for the product is 42.5 min.
The assembly line will operate will operate 48 weeks/year, 5 shifts/week, 8 hour/shift.
Proportion Uptime is 97%. There will be one worker per station. Determine:

a) Cycle Time, Tc. (3)

b) Theoretical minimum number of workers on the line. (3)

[12]

QUESTION 4

A machine operator is assigned two machines in a machine cell. The service time per
machine is 0.30 min and the time to walk between machines is 0.15 min. the machine
automatic cycle time is 2.0 min. if the worker’s hourly rate is R50/hr and the hourly rate
for each machine is R20/hr. Calculate:
a) The hourly operating cost for the cell

(2)
b) The unit production cost, assuming two units are produced by each machine
during each machine cycle

(6)
c) What is the percentage idle time of the workers?

(2)
d) Determine the maximum number of machines that should be allocate in each
machine cell, in order to achieve the lowest production cost

(10)

[20]

Total [56]