PT.
UTAMA YOUNGSUN METAL INDONESIA
CERTIFICATION OF LEAK TEST
Order No. UY23-02 Owner PT. Polytama Propindo
PO No. JL- 42828 Client PT. Polytama Propindo
Item. No. E-301A Dwg. No UY23-02DW-01-001
Item Name Propylene Condenser Report No. UY2302-CLT-001
Project Name Retubing Exchanger As per Drawing E-301
n AIR-SOAP BUBBLE TESTING
TEST PRESSURE HOLDING TIME
1.5 bar 5 Miutes
NOZZLE NO. OR NOZZLE NO. OR NOZZLE NO. OR
SIZE SIZE SIZE
PART NAME PART NAME PART NAME
REINF. PAD NOZZLE I1 4"
REINF. PAD NOZZLE I2 4"
REINF. PAD NOZZLE E 2"
REINF. PAD NOZZLE F1 2"
REINF. PAD NOZZLE F2 2"
RESULT ACCEPTED DATE April 16, 2024
o LEAK TESTING
SHELL SIDE TUBE SIDE
TYPE OF TEST oA oB oA oB
DESIGN PRESSURE Kg/cm2.g Kpa(g)
TEST PRESSURE Kg/cm2.g Kpa(g)
if not aplicable please mark slash line
NAME APPRO. VALUME NAME APPRO. VALUME
TRACER GASES o AIR o AIR
o FREON ___________ (%) o FREON ____________ (%)
HOLDING TIME 60 (MIN.) (MIN.)
RESULT ACCEPTED DATE RESULT DATE
NOTE REMARKS
A o HALOGEN DIODE DETECTOR PROBE TEST 1. See attached photograph
B o AIR-SOAP BUBBLE TEST FOR TUBE TO TUBE SHEET JOINT
o WITNESSED BY / o REVIEWED BY
APPROVED BY
REVIEWED BY
PREPARED BY
PT. Polytama Propindo
PHOTOGRAPH OF LEAK TEST FOR REINFORCING PAD
OWNER PT. POLYTAMA PROPINDO DATE 16-Apr-24
CLIENT PT. POLYTAMA PROPINDO JOINT NO. NOZZLE TO SHELL
ITEM NO. E-301
ITEM NAME PROPYLENE SUBCOOLER
NOZZLE E/2" NOZZLE E/2"
for next leak test, please use aplication
time stamp camera or use the
stopwatch. take the photo start holding
and end holding
NOZZLE I1/24" NOZZLE I1/24"
NOZZLE I2/4" NOZZLE I2/4"
NOZZLE F1/2" NOZZLE F1/2"
NOZZLE F2/2" NOZZLE F2/2"