Maintenance Schedule: C) D2 & D3 Schedule
Maintenance Schedule: C) D2 & D3 Schedule
1. How many Maintenance Schedule are generally done in primary Maintenance Depot.
a) One b) Two c) Three d) None
2. Frequency of D1 Schedule is -
a) On Every Trip b) 7 days c) 15 days d) 30 days
3. Frequency of D2 Schedule is -
a) 7 days± 1 day b) 10 days± 1 day c) 15 days± 1 day d) 30 days± 3 day
4. Frequency of D3 Schedule is -
a) 1 month± 1 day b) 3 month ± 3 day c) 6 month ± 15 day d) 9 month ± 3 day
15. Verifying the clearance between each pad and disc surface in -
a) D1 Schedule b) D2 Schedule c) D3 Schedule d) D2 & D3
16. Inspection of earthing equipment for wear of carbon bars -
a) D1 Schedule b) D2 Schedule c) D3 Schedule d) D2 & D3
19. Checking of bearing for hot and grease leakage is done in-
a) D1 Schedule b) D2 Schedule c) D1, D2 & D3 Schedule d) D3 Schedule
23. Inspection of grease oozing out of anti roll bar bearing is done in -
a) D1 Schedule b) D2 Schedule c) D1, D2 & D3 Schedule d) D3 Schedule
26. Checking of tell tale recess for ensuring proper coupling is done in -
a) D1 Schedule b) D2 Schedule c) D1, D2 & D3 Schedule d) D3 Schedule
27. Checking of corridor connection for external damage and entry of foreign bodies is done in -
a) D1 Schedule b) D2 Schedule c) D1, D2 & D3 Schedule d) D3 Schedule