OWNER (OW)
Title Deed OW2 One copy of the Title Deed with the original for the match □ OW
Municipal Survey Report OW3 Municipal land survey report for the property □ OW
Land Regulation OW4 After issuing the Municipal Survey report, OW will apply for Land Regulations □ OW
Authorization Letter OW5 Authorization letter from Owner for V3 Middle East’s Public Relations Officer. □ OW
DESIGNER (DE)
Concept Design D1 Concept Report □ DE
Schematic Design Drawings D2 Master Plan □ DE
Schematic Design Drawings D3 Sections - Elevation - Layouts □ DE
Schematic Design Drawings D4 Perspectives □ DE
SEC Application SEC2 SEC Application Form to be filled Online by OW in coordination with AOR □ OW/AOR
Written Pledge SEC3 Written Pledge from owner that he will apply thermal insulation to Building □ OW
NWC Application NWC1 NWC Application Form to be filled Online by OW in coordination with AOR □ OW/AOR
AOR to prepare the Civil Defense package and confirm that the design is
Civil Defence Package AOR2
complying with Civil defence Regulations. □ AOR
Municipality Committee Meeting AOR5 To coordinate and arrange all the meeting with the municipality Engineers □ AOR
Municipality Control AOR6 AOR to coordinate and arrange all the Municipality □ AOR
Certificate of Completion AOR7 AOR will issue the Certificate of Completion □ AOR
Occupancy Permit AOR8 AOR will assist the Client to issue the Occupancy Permit □ OW/AOR
Operation Permit AOR9 AOR will assist the Client to issue the Occupancy Permit □ OW/AOR