Super DCIM RFP Checklist v2
Super DCIM RFP Checklist v2
Instructions
1
2
3
4
Vendor Instructions
1
2
3
4
This DCIM Sample Question file is to be used by those companies that are seeking vendors to fulfill requirements for a Data C
Management (DCIM) project. Preparing to issue a Data Center Infrastructure Management bid? Do you know what you actua
requirements are? There are many choices of vendors and solutions, each having a slightly different twist. The tab "DCIM Re
an easy to use toold to ensure your most pertinent questions and concerns are answered and the DCIM you choose is the righ
Fill in "Company Information" tab with company specifics as to the purpose of the proposal request, who should receive the pr
Review questions in "DCIM" tab and identify / add any additional questions, or remove non-relevant questions
Use column "C" in "DCIM Requirements" tab to identify whether a feature is "must have", "future requirement", or "optional"
Submit completed workbook to vendors for proposal with associated cover letter
Instructions
Review "Company Information" tab for purpose, due dates, and contact information
Complete "DCIM Requirements" tab, column D and identify compliance response (Comply, Not Available, Roadmap)
Complete "DCIM Requirements" tab, column E and provide description of Vendor functionality in regard to requirement
Complete "Pricing" tab with vendor best pricing offer
Please fill in the following information (shaded in yellow) prior to submitting the RFP to selected vendors
Other Required Documents for Submittal List other required documents for submittal here
Other Proposal Considerations List anything else vendors should consider or adhere to as
Proposal Due Date Date proposal is due
Send all proposals to: Name
Email
Address
Phone Number
Questions Due Date Identify the date by which all questions are to be sent to C
Contact for Questions: Identify who the contact would be for questions relating to
Project Scope Questions for Vendor Understanding. Provide responses in yellow sections or tables below
1. Will a Point of Contact / Project Manager be assigned within your organization to coordinate with internal resource
Manager for start-to-finish implementation and coordination? An offsite Project Manager is built-in by Raritan
2. For each of the data centers to be modeled within DCIM solution, what format does the current asset and infrastru
home-grown database, needs physical survey, etc.? (fill in chart below)
3. For each of the data centers, what level of detail is required for the project? Raritan software allows for space and
cable management. Note: Achieving end-to-end cable management indicates that network and power cables are labe
Cabinet
Site Site Name
Count
5. Data Center Sensors and intelligent rack PDUs – Are intelligent power strips with sensors being installed with this
PDU naming and configuration onto the network, and Sensor naming and configuration
selected vendors
a proposal
and timeline
dditional information about this document must be sent via e-mail to the associated contact.
entify the section, number and question from this document to which they refer.
ns or tables below
rdinate with internal resources, or does the vendor need to provide an onsite Project
r is built-in by Raritan
he current asset and infrastructure inventory records reside in, for example Excel,
oftware allows for space and asset management, power management and end-to-end
ork and power cables are labeled and traceable, or documented in a useable format.
sors being installed with this project? If so, who will handle: physical installation, Rack
Please fill in the following information (shaded in yellow) prior to submitting the RFP to selected vendors
Date of
response:
Project: Enter the date of the response here
Date of
response:
Project: Enter the date of the response here
Date of
response:
Project: Enter the date of the response here
Date of
response:
Project: Enter the date of the response here
Audit Trails / Logging Protection of your data center. Ensure only the right
people have the access they need. Enable logging
to ensure audit trails are available for compliance
and tracking.
AT-01 Log: Event log
AT-02 Log: Log is filterable, sortable, searchable
AT-03
Connectivity Management Map and easily view the power chain all the way
from the server up to the power bank
CM-01 Data connectivity: Ability to visually build data circuits
between any combination of devices, network
equipment, and patch panels including all hops in a
single circuit
CM-02 Data connectivity: Intelligence to allow and disallow
connections based on fixed compatibility requirements
such as connector types, protocols, and speeds.
Date of
response:
Project: Enter the date of the response here
Data Center Visualization Know where your assets are. View your entire floor
map and drill down on individual assets. Easily
search and filter the information you want to view.
Date of
response:
Project: Enter the date of the response here
Date of
response:
Project: Enter the date of the response here
Date of
response:
Project: Enter the date of the response here
Date of
response:
Project: Enter the date of the response here
Date of
response:
Project: Enter the date of the response here
Date of
response:
Project: Enter the date of the response here
Date of
response:
Project: Enter the date of the response here
Date of
response:
Project: Enter the date of the response here
Date of
response:
Project: Enter the date of the response here
Date of
response:
Project: Enter the date of the response here
User Permissions / Tools to ensure only the right people have the
Security access they need
Permissions: Role based permissions- Site
UP-01 Administrator, Gatekeeper, Manager, Viewer
Permissions: Use of LDAP and Active Directory for user
UP-02 authentication
UP-03 Access: Administrative access through web browser
Access: Support for Browsers - Internet, Mozilla and
UP-04 Chrome
Access: Support for Browsers - Internet, Mozilla and
UP-05 Chrome
List, describe, and provide the cost of each piece of hardware that you require. Please include any equipment th
Hardware optimally run the software. If we are to provide certain equipment, you do not have to quote the cost of the equip
specific technical description so that we can make a reasonable estimate. Insert additional lines as necessary to
List, describe, and provide the licensing, with your proposed software. List license model (perpetual, term, etc.)
Software Licensing
Quantity and the cost of each license or component. Insert additional lines as necessary to complete your quote
Category Componet Description Quantity Price
List, describe, and provide the cost of each piece of software or firmware (including operating systems) that is re
Third-Party Software / Hardware / Integration
software. Insert additional lines as necessary to complete your quote.Insert additional lines as necessary to com
Describe any labor, equipment, supplies, or other costs associated with installing your proposed software. Inser
Installation
necessary to complete your quote
Category Componet Description Quantity Price
Describe and itemize any other ongoing costs associated with the operation and maintenance of your proposed s
Maintenance
years 1 - 3. Insert additional lines as necessary to complete your quote
If there are fees associated with your user or technical documentation or training, list them here. Insert additiona
Documentation and Training
complete your quote.
Category Componet Description Quantity Price
Other 1 Description
Category Componet Description Quantity Price
Other 2 Description
Category Componet Description Quantity Price
Summary Pricing
Hardware
Software Licensing
Third-Party Software / Hardware / Integration
Installation
Maintenance - Year 1
Maintenance - Year 2
Additional Comments
Additional Comments
Additional Comments
Additional Comments
Additional Comments
Additional Comments