Reference Drawings: Key Plan

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

+

+
DRAWING LIMIT

+
+

+
N- 7

+
+
TATIO

LA CY

EX
LIFT S

+
+

RE
10

ND CL

PR
+
1A

+
+
TELECOM 4X110

FIL ING

ES
AR EA
PHALT

+
AS

10

PS
+

SW
LA
+

+
1B

-6
5m

TR TAT

ND

AY
+
+

S
+
10

A N IO
+
(STUB-OUT) FOR

-5
1C

SIT
+ THIS SHEET

+
K
VALVE R

CH RAC
SWCC CORRIDOR
WET BE

+
CHAM
WELL

10

SWIT
LIFT STATION-7

IO
N
OCU
+

+
2

N
+
ATION

+
10

+
+ SW

SS
BST

+
3 T

MAKKAH
THH I 1034

+
P/ I

TR
6P SU
AN

-16

O T YDO
+
+ WT

+
1 SP

LA REA
RA
N 25945.2446 P

GRYAS

C W
P
104
OR

A
+
+ BY TAT

ILW
ID

+
PA ION

+
M

+
SS

+
+ COR

AY
+
+
E 42186.0531 1 RIDO

105 OCH TC)


+
EX

N
R

+
+

T
+ PR

+
+

RA
ES

+
+

PE NE

OR
TC
SW

+
+

CK
+

10
ZO
+

TR (O
A Y

TA

RID
+

R
+
+

OW
+

+
+

OR
A
10
+

AJI O
EM
+
+

MA RAMC
+

ZC
+

7
+

IC
+

+
+

10
+

AL
+
14

+
TC

+
+
T-

A
+

+
+

+
+

10
+
+
+

9
+
+
3

11
+
SS
11

+
+

0
-1

+ +
TC
8R

+
+

11
+
+
3

1
+
11

+
+

11
RE
+
+

2
DS
+ +
+
+

EA
TC

+
+
+
TELECOM 4X110

+
+
+
KEY PLAN

+
TELECOM 12X110 163m

+ +
+
RIPRAP

+
+
27m

+
TELECOM 12X110

+
TC

+
+
NOTE

+
6m

+
TELECOM 4X110

+
+
+
14m TELECOM 4X110

+
+
1. FOR INSTALLATION OF ALL THE UTILITIES AT THE CORRIDOR TRANSITION

+
TC+
(STUB-OUT) FOR 27m

+
CORRIDOR
BETWEEN PIC R -7505 AND PIC I-T-7062 CONTRACTOR SHALL FOLLOW

+
52m

+
FUTURE CONNECTION (STUB-OUT) FOR

+
DETOUR PLAN 7062-CE-A1-074, AND EXECUTE THE WORK BY CUTTING

+
+
FUTURE CONNECTION

+
+
D EXISTING TAMA AND REINSTATE AFTER COMPLETION OF WORK.
N 25980.8518 ROA

+
+
A

TC
+
TAM

+
N 26004.6244 N 25801.8883 N 25796.5082

+
E 41985.1722 G
STIN

3.00M TELECOM

+
+
EXI

+
E 41955.9544 E 42083.0841 E 42110.1936

+
+
TELECOM 8X110

+
+

TC
+
R=7.50m

+
+
249m

+
S=14m R=10m

+
+
R=10m

+
A=90° S=13.2m

+
S=15.7m

+
+
A=105°

+
+
TELECOM 8X110 A=90°
8X110

+
+
COM

+
+
TELE TC TC TC TC TC TC TC TC TC
TC

+
TC
+
TC
TC +
(53m) 184m TC
+

249m
TC TC
TC D TMH II 9007 TELECOM 12X110 TMH II 9009 TC
+

TC
ROA
+

TC
TC TELECOM 8X1
+

TC
(49m) AMA
+

TC 27m TC 10
+

TC T TC
+

NG 13m TC
+

TC I
+

TC T EDGE OF PAVED SHOULD TC


S
+

EXI
TC
+

TC ER 261m TC
+

PAVED
+

TC
EDGE OF
+
+
+

ER
+

SHOULD

66.50
EDGE OF TRAVEL LANE
+
+
+
-103

EDGE OF NE
+
+
+

LA
+

TRAVEL

FOR CONTINUATION SEE DWG. NO. 7062-TC-A1-105


C-A+ 1
+
+
+
+
+
+

062-T
+
+
+
+
+
+
+

NO. 7
+

N 25970.7288 N 25748.2148
REFERENCE DRAWINGS
G.

1024
THH I TELECOM 16X110 REALIGNED T

36.95
E DW

E 41852.7418 E 41994.5248 THH I 1023 AMA ROAD


TELECOM 4X110 6m DRAWING NO. DRAWING TITLE
L IG NE D T AMA ROAD 16m 37m
REA TELECOM 12X110 TELECOM 12X110 16m
N SE

R=5m 7062-TC-A1-001 GENERAL NOTES, LEGENDS, SYMBOLS AND ABBREVIATIONS

TC
26m
TC

62m TELECOM 8X110 TELECOM 8X110 S=7.85m TELECOMMUNICATION FEEDER NETWORK CONDUIT
TELECOM 4X110 7062-TC-A1-100
TIO

TC TC TC TC TC TC TC TC TC TC
A=90° ROUTE MAP
TC TC TC
TC 233m 233m TC TC 37m
INUA

TC
TC R=10m TMH III 9010 TC TC 7062-TC-A1-101 TELECOMMUNICATION DUCT BANK LAYOUT KEY PLAN
3.00M TELECOM CORRIDOR
TC TMH II 9008 18m S=15.7m TC
TC TELECOM 8X1
TC
TC
R=10m 20m 13m TC 10 7062-TC-A1-103 TELECOMMUNICATION DUCT BANK LAYOUT (SHEET 5 OF 15)
8X110 A=90° TC
T

TC TC
TELECOM S=15.7m TC
CON

TC TC
TC 166m TC 7062-TC-A1-105 TELECOMMUNICATION DUCT BANK LAYOUT (SHEET 7 OF 15)
A=90°
186m 7062-CE-A1-615 TYPICAL ROAD UTILITIES RIGHT OF WAY (SHEET 1 OF 3)
FOR

EDGE OF NE N 25929.8421
OAD

N 25722.9788 CHANNEL NO.(03)


LA
TRAVEL PAVED

TC-A1-104 CE-A1-615
E 41861.2930 TELECOM 12X110 B=1.00m, H=1.20m
EDGE O F E 41987.0061 SIDE SLOPE = 4:1 / SLOPE = 0.00
LT R

93m 10
ER
SHOULD TELECOM 4X110 EDGE OF TRAVEL LANE
SPHA

TELECOM 4X110
23m

B-1
25m " WE CERTIFY THAT ALL DOCUMENTS CONFORM TO THE
(STUB-OUT) FOR EDGE OF PAVED SHOULD REQUIREMENTS OF THE CONTRACT DOCUMENTS IN ALL RESPECTS
ING A

ER (STUB-OUT) FOR AND WERE PREPARED IN ACCORDANCE WITH SPECIFIED CODES


FUTURE CONNECTION AND STANDARDS AND THAT THE PLANS AND SPECIFICATIONS HAVE
FUTURE CONNECTION BEEN CHECKED AND ARE COMPLETE AND READY FOR
EXIST

C O N S T R U C T I O N . " This Drawing and the design it covers are the property of
the Royal Commission for Jubail and Yanbu / Directorate General for Yanbu
Project. These drawings are loaned on the borrower's express agreement
that they will not be reproduced, copied, loaned, exhibited or used except in
the limited way, if any, permitted by written consent of the Royal Commission.
CONTRACTOR SIGNATURE

0 10 20 30 40 50 60 70 80 90 100M
SCALE 1:1000 METERS
AD T RO

0 FEB.'22 FAEC ISSUED FOR CONSTRUCTION UNDER EWR NO. 2231 DATED 01/FEBRUARY/2022
SPHAL

NO. DATE BY DESCRIPTION APPROVED BY :


ING A

KINGDOM OF SAUDI ARABIA


EXIST

Royal Commission for Jubail and Yanbu

Royal Commission at Yanbu

MADINAT YANBU AL-SINAIYAH

DRAWING TITLE: CONSTRUCTION OF ROAD & UTILITIES FOR


REALIGNED TAMA FROM SWCC CORRIDOR TO MAAJIZ ROAD

TELECOMMUNICATION DUCT BANK LAYOUT


(SHEET 6 OF 15)
DESIGNED BY : AV

DRAWN BY : BG

DRAWING LIMIT CHECKED BY : MK


SAMA CONSTRUCTION
PROJ. ENGR. : FOR TRADING AND po box 565, Yanbu 41921,Saudi Arabia
CONTRACTING LIMITED p +966 14 392 9222 / f +966 14 392 6232
DU SUPV : P.O.BOX 1311, MADINAT YANBU AL-BAHAR www.faalireza-consultants.com
TEL-(04) 3211744 EXT. (107)

TELECOMMUNICATION DUCT BANK LAYOUT (SHEET 6 OF 15) A/E APPROVAL : WBS NO. : DRAWING NO. :

SCALE = 1:1000 R. C. APPROVAL : CONT. NO. : PIC I-T-7062


7062- TC-A1-104
DATE : DECEMBER 2019 SCALE : 1 : 1000 REV. NO. : 0

You might also like