SBU CSE&CA - Project Report Format
SBU CSE&CA - Project Report Format
Project Report On
Submitted to
Certified that Madhu Shweta Kumari (SBU210501) of B.Tech CSE, Sem-VI & Batch-2021-25,
have carried out the research work presented in this project entitled “Air Quality Prediction
System” for the award of (B.Tech-CSE) from Sarala Birla University, Ranchi under my
supervision during EVEN Sem 2024 session. The project embodies result of original work and studies
carried out by Student himself and the contents of the project do not form the basis for the award of any
other degree to the candidate or to anybody else.
Sign: __________
Date:
(Anand Kumar Vishwakarma)
Designation
Department of CSE & CA
Sarala Birla University, Ranchi
Declaration
I,Madhu Shweta Kumari (SBU210501), student of B.Tech CSE, Sem-VI, Batch(2021-25), hereby declare
that the report titled “Air Quality Prediction System” which is submitted by me to the department of CSE
& CA , Sarala Birla University Jharkhand, in partial fulfillment of the requirement for the award of degree/
diploma in “B.Tech CSE” , has not been previously formed the basis for the award of any degree, diploma
or other similar title or recognition. I further declare that the report is written by me and no part of the report
is copied from any source(s) without being duly acknowledged.
Signature:
Date:
Acknowledgement
I express my sincere gratitude to my project guide Anand Kumar Vishwakarma for his/ her able
guidance, continuous support and cooperation throughout my project, without which the present
work would not have been possible. My endeavor stands incomplete without dedicating my
gratitude to him/ she; he / she has contributed a lot towards successful completion of my project
work.
I would also like to express my sincere thanks towards my teachers at SBU and my family and
friends for their unending support, and tireless effort that kept me motivated throughout the
completion of this project.
( SBU210501)
Program:B.Tech CSE
Semester:VI
Section:B
Batch: 2021-25
Table of Contents
Project Information
1. Course Title:
2. Courses Code:
3. Credit Unit:
4. Project Duration:
a) Date of Project Commencement: 16th August, 2023
a) Date of Project Completion: 21st November, 2023
5. Approved Project Title (to be duly approved by the Project Guide):
6. Project Objective:
7. Methodology to be adopted:
1. Xxxxxxx .................................................................................................................... XX
2. Xxxxxxxx ................................................................................................................... XX
3. Xxxx
List of Tables
1. Xxxxxxx .................................................................................................................... XX
2. Xxxxxxxx ................................................................................................................... XX
3.
1. INTRODUCTION
2. PROBLEM ANALYSIS
3. SYSTEM IMPLIMENTATION DETAILS
4. DESIGN
5. IMPLEMENTATION
6. RESULT
7. CONCLUSION
8. FUTURE SCOPE
9. LIMITATIONS
10. ANNEXURE – I: References
[1] https://www.w3schools.com/
[2] Robson, E., & Freeman, E. (2005). Head first html with css & xhtml. " O'Reilly Media, Inc.".
11. ANNEXURE – II: Weekly Progress Reports
(All original WPRs to be attached here)