0% found this document useful (0 votes)
540 views4 pages

Reinforcement Chair Design

The document discusses the design of reinforcement chairs used to support rebar in concrete slabs and rafts. It provides examples of calculating loads on a chair, checking the buckling capacity of rebar, and determining chair dimensions based on raft geometry and rebar spacing. Ignoring chair design can significantly increase construction costs.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
540 views4 pages

Reinforcement Chair Design

The document discusses the design of reinforcement chairs used to support rebar in concrete slabs and rafts. It provides examples of calculating loads on a chair, checking the buckling capacity of rebar, and determining chair dimensions based on raft geometry and rebar spacing. Ignoring chair design can significantly increase construction costs.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

‫‪Reinforcement Chair Design‬‬

‫ا ﻓﻘﻴﺔ ﻣﺜﻞ‬ ‫اﻟﻬﺎﻣﺔ اﻟﺘﻰ ﺗﺴﺎﻋﺪ ﻓﻰ ﺗﻨﻔﻴﺬ أﻋﻤﺎل اﻟﺘﺴﻠﻴﺢ ﻟﻠﻌﻨﺎ‬ ‫ﺗﻌﺘﺒﺮ اﻟﻜﺮا"! ﻣﻦ اﻟﻌﻨﺎ‬
‫اﻟﺒ‪*+‬ﻃﺎت واﻟﻠﺒﺸﺔ اﻟﻤﺴﻠﺤﺔ ﻃﺒﻘﺎ ﻟﻠﻤﻮاﺻﻔﺎت اﻟﻤﻄﻠﻮﺑﻪ ﺣﻴﺚ ﺗﻘﻮم ﺑﺮﻓﻊ رﻗﺔ اﻟﺤﺪﻳﺪ اﻟﻌﻠﻮﻳﺔ‬
‫وﻇﺒﻄﻬﺎ ﻋﻠﻰ اﻟﻤﻨﺴﻮب اﻟﺘﺼﻤﻴﻤﻰ ﻟﻬﺎ واﻟﻤﺤﺎﻓﻈﺔ ﻋﻠﻰ ﺗﻘﺴﻴﻂ أﺳﻴﺎخ رﻗﺔ اﻟﺤﺪﻳﺪ اﻟﻌﻠﻮﻳﺔ‪.‬‬

‫ﻓﻰ اﻟﻤﻨﺸﺄت ذات ا *رﺗﻔﺎع اﻟﻜﺒﻴﺮ ﻳﻤﻜﻦ أن ﻳﺸﻜﻞ ﺑﻨﺪ ﺗﻨﻔﻴﺬ اﻟﻜﺮا"! ﺟﺰء ﻛﺒﻴﺮ ﻣﻦ ﺗﻜﻠﻔﺔ ﺑﻨﺪ اﻟﻠﺒﺸﺔ‬
‫اﻟﻤﺴﻠﺤﺔ وﻟﺬﻟﻚ *ﺑﺪ ﻣﻦ أﺧﺬﻫﺎ ﻓﻰ اﻟﺤﺴﺎب ﻣﻦ ﻧﺎﺣﻴﺔ اﻟﺘﺼﻤﻴﻢ وﻋﻤﻞ اﻟﻠﻮﺣﺎت اﻟﺘﻨﻔﻴﺬﻳﺔ اﻟﻤﻨﺎﺳﺒﺔ‬
‫ﻟﺘﻨﻔﻴﺬ اﻟﻜﺮا"!‪.‬‬

‫ﻟﻠﺒﺸﺔ‪:‬‬ ‫أو'&‪ :‬ﻛﻴﻒ ﻳﻤﻜﻦ ﺗﺼﻤﻴﻢ اﻟﻜﺮا‬

‫ﺗﻌﺘﻤﺪ ﻓﻜﺮة ﺗﺼﻤﻴﻢ اﻟﻜﺮا"! ﻋﻠﻰ ﺣﺴﺎب ﺟﻤﻴﻊ ا وزان ﻋﻠﻰ اﻟﻜﺮ"! ﻓﻰ ﻣﺴﺎﺣﺔ ‪ ١‬ﻣﺘﺮ ﻣﺮﺑﻊ وﺗﺸﻤﻞ‬
‫ﻫﺬه ا ﺣﻤﺎل وزن ﻃﺒﻘﺘﻴﻦ ﻟﺤﺪﻳﺪ اﻟﺮﻗﺔ اﻟﻌﻠﻮﻳﺔ وﻛﺬﻟﻚ ا ﺣﻤﺎل اﻟﺤﻴﺔ واﻟﺘﻰ ﺗﻤﺜﻞ وزن اﻟﻌﻤﺎﻟﺔ‬
‫واﻟﻤﻌﺪات أﺛﻨﺎء أﻋﻤﺎل ﺗﺮﻛﻴﺐ اﻟﺤﺪادة وأﻋﻤﺎل اﻟﺼﺐ‪.‬‬

‫ﻣﺜﺎل‪:‬‬

‫ﺑﻔﺮض أن ﻟﺪﻳﻨﺎ ﻟﺒﺸﺔ ﺑﺮج ﺑﺴﻤﻚ ‪ ٢٫٥٠‬ﻣﺘﺮ وﺗﺴﻠﻴﺢ اﻟﺮﻗﺔ اﻟﻌﻠﻮﻳﺔ ‪ 32@125mm‬وﺗﺴﻠﻴﺢ اﻟﺮﻗﺔ‬
‫اﻟﺴﻔﻠﻴﺔ ‪32@125mm‬‬

‫ﻟﺘﻠﻚ اﻟﻠﺒﺸﺔ؟‬ ‫ﻛﻴﻒ ﻳﻤﻜﻦ ﺗﺼﻤﻴﻢ اﻟﻜﺮا‬

‫‪Raft thickness: 2500 mm‬‬

‫‪Bottom Reinforcement: T32-125 mm both ways‬‬

‫‪Top Reinforcement: T32-125 mm both ways‬‬


Reinforcement Chair Design

1m
1m

Dead loads (DL):

∗ ∗ . . / . /

‫ '&ﺧﺬ وزن‬١٫٢٥ ‫ﺑﻬﺎ ﻓﻰ ﻣﻌﺎﻣﻞ‬FG‫ﺗﻢ ﺣﺴﺎب وزن أﺳﻴﺎخ ﺣﺪﻳﺪ اﻟﺮﻗﻪ اﻟﻌﻠﻮﻳﺔ ﻓﻰ اﻟﻤﺘﺮ اﻟﻤﺴﻄﺢ و‬
. ‫ﺣﻤﺎل ﻛﺤﻤﻞ ﻣﻴﺖ ﻳﺘﺤﻤﻠﻬﺎ اﻟﻜﺮ‬S'‫&ت واﻟﺤﺪﻳﺪ ا'&ﺿﺎﻓﻰ اﻟﻌﻠﻮي ﻓﻰ اﻟﻠﺒﺸﺔ واﻋﺘﺒﺎر ﺗﻠﻚ ا‬Y‫اﻟﻮﺻ‬

Live loads (LL):


. /
Factored loads = 1.4 DL + 1.6 LL=1.4*1.26+1.6*1.5=4.164 KN/m2

Assumed Diameter of Reinforcement Chair to use T25 mm

Check Buckling Capacity of T25 Rebar using the Euler’s Formula:


. ∗

!"#!$$% &'( )'* )& %+ ) * ,'


- %.' ∗ / ∗ - ∗ / ∗
∗ ∗ ∗ . ∗
.
∗ .
. ∗ . . . #& '" &) '(! &*%" + &%
Chair has two legs, so the chair capacity

&%& , . ∗ .
+ &% '( ,% (# .
% %+ ) * #/ . ) * /
&%& , .
The reinforcement chair required is 1T25 per square meter.

: ‫ ﻛﻴﻒ ﻳﻤﻜﻦ ﺣﺴﺎب أﺑﻌﺎد اﻟﻜﺮا‬:‫ﺛﺎﻧﻴﺎ‬

Height of chair = height of raft – (2*clear cover) - (2*diameter of bottom bars)


- (2* diameter of top bars) = 2500 – (2*70) – (2*32) - (2*32) = 2232 mm

Leg of chair = (2 * spacing of bottom bars) + 50 = (2*125) + 50 = 300 mm

Head of chair = (2 * spacing of top bars) + (2*50) = (2*125) + (2*50) = 350 mm


‫‪Cut length of the chair bar (L):‬‬
‫)‪L = Height of chair * 2 + Leg of chair * 2 + Head of chair – (2.5*4*D‬‬

‫‪L = (2232*2) + (2*300) + 350 – (4*2.5*25) = 5164 mm‬‬

‫ﻟﻜﻞ ﻣﺘﺮ ﻣﺴﻄﺢ‬ ‫ﺑﻔﺮض أن ﻣﺴﻄﺢ ﻟﺒﺸﺔ اﻟﻤﺒﻨﻰ ‪ ٢٠٠٠‬ﻣﺘﺮ ﻣﺴﻄﺢ وﻣﻦ اﻟﺘﺼﻤﻴﻢ ﺗﻢ وﺿﻊ ﻛﺮ‬
‫ﺑﻄﻮل ‪ ٥١٦٤‬ﻣﻢ وﺑﺎﻟﺘﺎﻟﻰ ﻳﻤﻜﻦ ﺣﺴﺎب وزن ﺣﺪﻳﺪ‬ ‫وﺑﺎﻟﺘﺎﻟﻰ ﻓﺎن اﻟﻠﺒﺸﺔ ﺗﺤﺘﺎج اﻟﻰ ﻋﺪد ‪ ٢٠٠٠‬ﻛﺮ‬
‫اﻟﻤﺴﺘﺨﺪﻣﺔ ﻛﻤﺎ ﻳﻠﻰ‪:‬‬ ‫اﻟﻜﺮا‬

‫‪0‬‬ ‫‪∗ .‬‬ ‫∗‬ ‫"‪&%‬‬

‫ﺣﻮاﻟﻰ ‪ ٤٠‬ﻃﻦ وﻫﻲ‬ ‫ﻣﻦ اﻟﺤﺴﺎﺑﺎت اﻟﺴﺎﺑﻘﺔ ﻳﺘﻀﺢ أن ﻛﻤﻴﺔ اﻟﺤﺪﻳﺪ اﻟﻤﻄﻠﻮﺑﺔ ﻟﺘﻨﻔﻴﺬ ﺑﻨﺪ اﻟﻜﺮا‬
‫ﻛﻤﻴﺔ ﻛﺒﻴﺮة ﺟﺪا اذا ﻟﻢ ﻳﺘﻢ أﺧﺬﻫﺎ ﻓﻰ ا'&ﻋﺘﺒﺎر ﻋﻨﺪ اﻟﺘﺼﻤﻴﻢ واﻟﺘﻨﻔﻴﺬ ﺳﻮف ﺗﺆدي اﻟﻰ ﺣﺪوث ﺗﻜﻠﻔﺔ‬
‫ﻛﺒﻴﺮة ﻟﻠﻤ”‪F‬وع‪.‬‬

‫ﻋﻠﻰ اﺳﺎس ﺳﻌﺮ اﻟﻄﻦ ب )‪ (55000‬ﺟﻨﻴﻪ‬ ‫وﻳﻤﻜﻦ ﺣﺴﺎب ﺗﻠﻚ اﻟﺘﻜﻠﻔﺔ اﻟﺘﻘﺮﻳﺒﻴﺔ ﻟﺤﺪﻳﺪ اﻟﻜﺮا‬
‫ﺷﺎﻣﻞ اﻟﻨﻘﻞ واﻟﻤﺼﻨﻌﻴﺎت ﻛﻤﺎ ﻳﻠﻰ‪:‬‬

‫‪Cost = 40 * 55000 = 2200000 L.E‬‬


‫وﺑﺎﻟﺘﺎﻟﻰ ﻳﺘﻀﺢ ﻣﺪي أﻫﻤﻴﺔ دراﺳﺔ وﺗﺼﻤﻴﻢ ذﻟﻚ اﻟﺒﻨﺪ واﻋﺘﻤﺎده ﻣﻦ اﺳﺘﺸﺎري اﻟﻤ”‪F‬وع ﻗﺒﻞ اﻟﺒﺪء‬
‫ﻓﻰ اﻟﺘﻨﻔﻴﺬ ﺣﻴﺚ أن ﺗﻜﻠﻔﺔ اﻟﺒﻨﺪ ﻓﻰ اﻟﻤ”‪F‬وﻋﺎت اﻟﻜﺒﻴﺮة وأ'&ﺑﺮاج اﻟﻌﺎﻟﻴﺔ ﺗﻜﻮن ﻣﻜﻠﻔﺔ ﺟﺪا‪.‬‬