The document provides a bill of quantities for fabrication and installation of an MS staircase at different locations on a campus. It includes items for cement concrete, steel work in tubular trusses and built up sections, cement plastering, and pointing on brickwork for the staircase.
The document provides a bill of quantities for fabrication and installation of an MS staircase at different locations on a campus. It includes items for cement concrete, steel work in tubular trusses and built up sections, cement plastering, and pointing on brickwork for the staircase.
The document provides a bill of quantities for fabrication and installation of an MS staircase at different locations on a campus. It includes items for cement concrete, steel work in tubular trusses and built up sections, cement plastering, and pointing on brickwork for the staircase.
The document provides a bill of quantities for fabrication and installation of an MS staircase at different locations on a campus. It includes items for cement concrete, steel work in tubular trusses and built up sections, cement plastering, and pointing on brickwork for the staircase.
BOQ Sub: Fabrication and installation MS staircase at different locations in the campus
Sr. No. DSR 2018 Description of Items Qty Unit Rate Amount
Providing and laying in position cement concrete
1 4.1 of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:3:6 (1 Cement : 3 coarse sand (zone-III): 6
4.1.6 1 cum graded stone aggregate 40 mm nominal size)
Steel work in built up tubular trusses including
cutting, hoisting fixing in position and applying a 2 10.16 priming coat of approved steel primer, welded and bolted including special shaped washers etc. Complete. 10.16.1 Hot finished welded type tubes. 300 kg
Steel work welded in built up sections/ framed
work including cutting, hoisting, fixing in position 3 10.25 and applying a priming coat of approved steel primer using structural steel etc. as required.
In stringers, treads, landings etc. of stair
10.25.1 cases including use of chequered plate 150 Kg wherever required, all complete.
13.1 12 mm cement plaster of mix :
13.1.2 1:6 (1 cement: 6 fine sand) 10 sqm
Pointing on brick work or brick flooring with
13.31 cement mortar 1:3 (1 cement : 3 fine sand):
13.31.1 Flush / Ruled/ Struck or weathered pointing 20 sqm