METHOD STATEMENT
FOR
PLUMBING WORKS
E
1. OBJECTIVE
4. DEFINITIONS
5. RESPONSIBILITIES
6. PROCEDULE / METHODOLOGY
9. DISTRIBUTION
1 OBJECTIVE
E
4 DEFINITIONS
CL Client
PM Project Manager
CM Construction Manager
CE Construction Engineer
QCI Quality Control Inspector
PQP Project Quality Plan
PPE Personal Protection Equipment
HSE PLAN Health Safety & Environment Plan
5 RESPONSIBILITIES
- CE will ensure that all the works are performed safely as per latest Issued
For Construction (IFC) drawings & specifications.
- The relevant CE and Supervisor will ensure that all the work is conducted in
accordance with this method statement and project specifications
- The QC Inspector will ensure that all work is executed according to PQP and
that requirements of quality dossier are full filled.
6 PROCEDURE / METHODOLOGY
E
- All pipe works shall be fixed in such a manner as to be readily accessible for
tools, welding operations or removable without dismantling adjacent pipe
work.
- The water distribution pipes shall be of good quality and the joints shall be
glued perfectly to prevent any future leak
- All Pipe works shall be run neatly, parallel to walls or grid lines on plan and
shall, where necessary, set around columns and projections. All vertical
pipes shall be plumb.
- The drainage pipes will be separated into two networks, the gray water for
the kitchen and the black water for the toilets
- Ensure good compaction below the drainage pipes to prevent any settlement
- Suitable slope shall be provided to achieve the flow of the sewage and
wastewater.
- Flow testing of the drainage system shall be carried out to ensure that the
system is working properly
- Ensure that defects & deterioration of pipes and fittings doesn’t occur during
the handling, transportation, and storage
- Set out warning signs, plastic cones, flagging and safety barricade as
necessary.
- Use only wood or fiberglass range poles or rods when working near electrical
lines.
- All workers must be properly geared with safety helmet, hand gloves, and
safety shoes before carrying out their works at Site.
- Safety blankets and fire extinguishers shall be made available at all times.
E
9 DISTRIBUTION
- Client
- Head PMO
- Project Manager
- Construction Manager/engineer
- I/C QC
- Central Office file
-
Astral Client/Consultant
Date: Date: