610127883719693f8d3e49f3 - ZOMBA DDP FINAL VERSION

Download as pdf or txt
Download as pdf or txt
You are on page 1of 161

Zomba District Council

District Development Plan


(2017-2022)
March 2018
Foreword
This District Development Plan (DDP) is a very important framework that sets development priorities
for Zomba District for the next five years (2017-2022). It charts an ambitious path to transform the
communities in Zomba by translating the national priorities articulated in Malawi’s Vision 2020 and
Malawi Growth and Development Strategy III (MGDS III) into tailor-made goals and plans of the
district.

The plan therefore outlines interventions in the following MGDS III key priority areas: agriculture,
water development and climate change management; education and skills development; energy, industry
and tourism development; transport and information, communication and technology (ICT)
infrastructure; and health and population. Additionally, development interventions in the district will
focus on the following other areas of development as indicated in MGDS III: financial services; disaster
risk management and social support; gender, youth development, persons with disability and social
welfare; human settlement and physical planning; HIV and AIDS management; nutrition and Peace and
Security; and integrated rural development.
I have all the hope that this DDP will bring about a coordinated approach to implementation of
development projects and programmes that are reflective of communities’ needs and priorities. The
district’s annual performance tracking and evaluations will hinge on this DDP. All development
stakeholders operating in Zomba district are therefore required to align their interventions to this DDP.
Implementation of development interventions outside this framework will not be condoned.
Finally, I would like to call upon all development stakeholders and communities in particular, to join
hands in supporting the implementation, monitoring and evaluation of the programmes and projects
outlined in this plan. This will ensure successful implementation and thereby improve the living
standards of the people of Zomba District.

Chikumbutso Likandawe
Chairperson
Zomba District Council
Preface
This District Development Plan creates space for development actors in Zomba district to reflect on
challenges, lessons learnt and achievements registered during the last five years. Following the lessons
learnt, the achievements made and challenges faced in the last five years, the council presents to all
development stakeholders this DDP which runs from 2017 to 2022. This plan provides a comprehensive
medium-term strategy for an all-inclusive development agenda. The plan outlines priorities that will
drive the socio- economic development of Zomba district for the next five years by providing specific
actions which will be undertaken in each sector throughout this period.
This District Development Plan is a tool which will guide planning, implementation and coordination
of development interventions in Zomba District. Complete ownership of this DDP by the citizenry of
the district is critical for the successful implementation, monitoring and evaluation of the outlined
interventions. Furthermore, to achieve the stated goals and fast-track economic development, the council
believes that private sector participation is essential and therefore commits itself to encouraging new
innovations and developments by the private sector through public private partnerships as well as wholly
private sector initiatives or ventures.
The development of this plan has benefited from the review of several documents including Sustainable
Development Goals (SDGs), MGDS III and 2017 Zomba Socio-Economic Profile (SEP). Furthermore,
this DDP has been shaped by the advice from the Ministry of Local Government and Rural Development
and various districts’ stakeholders. Additionally, valuable information for the development of this DDP
was also generated through purposive consultations involving local communities, specialists from
sectors at district level, development partners, representatives of the private sector and the Civil Society
Organizations (CSOs) operating in the district.
I therefore remain confident that the collaboration that manifested during the development of this plan
will continue so that all unforeseen risks and challenges can be overcome during the implementation
phase.

Emmanuel K. Bambe
District Commissioner
Zomba District Council

ii
Acknowledgements
This 2017- 2022 District Development Plan has been put together through a participatory process
involving various organizations and individuals. Zomba District Council is therefore indebted to the
following organizations; the United States Agency for International Development (USAID) through the
Local Government Accountability and Performance Project (LGAP) for the financial and technical
support to the entire DDP formulation process and Fisheries Integration of Society and Habitat (FISH)
for supporting the formulation of District Development Planning Framework (DDPF) sections for some
sectors. The district is also equally indebted to members of Area Executive Committees (AECs), Village
Development Committees (VDCs) and Area Development Committees (ADCs) for providing valuable
contributions that assisted in isolating district’s development priorities.

The District would also like to thank the Lead Consultant and District Consultant, Dr. Milton Kutengule
and Francis Mukhupa respectively for technically supporting the development of this District
Development Plan.

Special thanks should also go to the multisector DDP task force for its technical input during the
compilation stage of this DDP and the District Executive Committee (DEC) and the Development
Committee for guiding the process of developing this DDP.

Lastly, but not least, the district would like to acknowledge the support and contributions provided by
the Full Council. The Council’s approval of the DDP was remarkable and a right step towards improved
delivery of development and services in the district.

Walter E.J. Chikuni


Director of Planning and Development
Zomba District Council

iii
Contents
Foreword .................................................................................................................................................................. i
Preface .................................................................................................................................................................... ii
Acknowledgements ................................................................................................................................................ iii
List of Tables ......................................................................................................................................................... vi
List of Abbreviations and Acronyms .................................................................................................................... vii
Executive Summary ............................................................................................................................................... ix
CHAPTER ONE: INTRODUCTION ..................................................................................................................... 1

National Development Frameworks ......................................................................................................... 1

i. Vision 2020 ............................................................................................................................................ 1


ii. The Malawi Growth and Development Strategy III (MGDS III) ........................................................... 1
iii. The National Decentralization Policy..................................................................................................... 3
CHAPTER TWO: DISTRICT DEVELOPMENT PLANNING FRAMEWORK ................................................. 4

i. Vision 4

ii. Development Mission......................................................................................................................... 4

iii. Core Values ........................................................................................................................................ 4

iv. Prioritized Development Issues .......................................................................................................... 4

v. Economic Potentials of Zomba District ........................................................................................... 27

a) Agriculture............................................................................................................................................ 27
b) Forestry ................................................................................................................................................. 27
c) Banking and Credit Facilities ............................................................................................................... 27
d) Tourism ................................................................................................................................................ 27
e) Fisheries................................................................................................................................................ 28
f) Other Potentials of Zomba District ....................................................................................................... 28
CHAPTER THREE: PROGRAMMES AND PROJECTS................................................................................... 29
CHAPTER FOUR: RESOURCES FOR DISTRICT DEVELOPMENT ............................................................. 62

a. Analysis of Council Investments ...................................................................................................... 62

b. Private Investment Analysis ............................................................................................................. 62

iv
c. Future Financial Projections:............................................................................................................ 63

CHAPTER FIVE: DISTRICT ANNUAL INVESTMENT PPROGRAMME ..................................................... 65


CHAPTER SIX: MONITORING AND EVALUATION .................................................................................... 76

6.1 Levels of Monitoring and Evaluation ............................................................................................... 76

6.2 Monitoring and Evaluation Capacity Building ................................................................................ 78

6.3 Participation of Actors in Monitoring and Evaluation ..................................................................... 78

6.4 Indicators, Data Collection, Analysis and Reporting ....................................................................... 78

CHAPTER SEVEN: CONCLUSION................................................................................................................... 80


ANNEXES ............................................................................................................................................................ 81

Annex I: Result Matrix ........................................................................................................................... 81

Annex 2: Area Development Plans .................................................................................................... 101

v
List of Tables
Table 1: Zomba District Development Planning Framework (DDPF) ....................................................................................... 5
Table 2: Other Potentials ....................................................................................................................................................... 28
Table 3: Development Initiatives, Programmes and Projects under Food and Nutrition Insecurity at Household Level ...... 29
Table 4: Development Initiatives, Programmes and Projects under Loss of Biodiversity and Environmental Degradation . 33
Table 5: Development Initiatives, Programmes and Projects under High Illiteracy Rate ...................................................... 36
Table 6: Development Initiatives, Programmes and Projects under High Maternal and Infant Mortality Rates .................. 42
Table 7: Development Initiatives, Programmes and Projects under Limited Access to Potable Water and Improved
Sanitation ............................................................................................................................................................................... 45
Table 8: Development Initiatives, Programmes and Projects under Poor Transport and Communication Infrastructure ... 46
Table 9: Development Initiatives, Programmes and Projects under High Poverty Levels ..................................................... 50
Table 10: High Incidences of Gender Based Violations .......................................................................................................... 53
Table 11: Development Initiatives, Programmes and Projects under High Crime Rate ........................................................ 53
Table 12: Development Initiatives, Programmes and Projects under Weak Institutional Capacity for Effective
Decentralised Service Delivery ............................................................................................................................................... 57
Table 13: Poor Development of Trading (Semi-Urban) Centres ............................................................................................ 61
Table 14: Resource Utilisation for the Development Priority Issues ..................................................................................... 62
Table 15: Summary of Future Financial Projections .............................................................................................................. 63
Table 16: Annual Investment Programme ............................................................................................................................. 65
Table 18: Annual M&E Plan ................................................................................................................................................... 77
Table 17: Roles and Responsibilities of Actors in the DDP Process ....................................................................................... 78

vi
List of Abbreviations and Acronyms
ADCs Area Development Committees
AECs Area Executive Committees
AIDS Acquired Immune Deficiency Syndrome
CAMFED Campaign for Female Education
CBCCs Community Based Childcare Centres
CCC Climate Change Centre
CDF Constituency Development Fund
CDSS Community Day Secondary Schools,
CPCs Civil Protection Committees
CSOs Civil Society Organizations
CVSUs Community Victim Support Units
DDP District Development Plan
DDPF District Development Planning Framework
DEAP District Environment Action Plans
DEC District Executive Committee
DoDMA Department of Disaster Management Affairs;
DRM Disaster Risk Management
DSOER District State of Environment Report
DWSSP District Water Supply and Sanitation Plan
ECD Early Childhood Development
EI Emmanuel International
EPA Extension Planning Area
FAO Food and Agriculture Organisation,
FISH Fisheries Integration of Society and Habitat
GAP Good Agronomic Practices
Ha Hectare
HCT HIV Counseling and Testing
HIV Human Immune Virus
ICT Information, Communication and Technology
ID Identity
IGAs Income Generating Activities
Kg Kilograms
LDF Local Development Fund
LEAD Leadership in Environment and Development
LGAP Local Government Accountability Program
LMIS Logistical Management Information Systems
MASAF Malawi Social Action Fund
MFERP Malawi Flood Emergency Response Programme
MGDS Malawi Growth and Development Strategy
MK Malawi Kwacha
vii
NASFAM National Smallholder Farmers Association of Malawi
NGOs Non-Governmental Organisation
ORT Other Recurrent Transactions
PPPs Public Private Partnerships
SDGs Sustainable Development Goals
SEP Socio Economic Profile
SMEs Small and Medium Enterprises
T/C Traditional Centres
TA Traditional Authority
UNDP United Nations Development Program
USAID United States Agency for International Development
VAPs Village Action Plans
VDCs Village Development Committees
VFA Village Forest Areas
VNRMCs Village Natural Resource Management Committees
VSL Village Saving Loans
VSUs Victim Support Unit
WUA Water Users Association
WVI World Vision International
YFHS Youth Friendly Health Services

viii
Executive Summary
The Decentralization Policy of 1998 which is supported by the Local Government Act of 1998 gives the
local administrative authorities the power and autonomy to undertake development planning through
local people’s participation. It is in line with this that Zomba District Council has designed this five year
DDP (2017-2022). This plan was designed with the participation of different sectors in the district,
citizens, political parties, traditional authorities, Non-Governmental Organizations, the private sector
and the communities through village action planning. The participation and cooperation of these actors
during the designing stage of this DDP inspires hope towards the successful implementation of this plan.

This DDP focuses on eleven development issues which have been prioritized as follows:

1. Food and nutrition insecurity at household level;


2. Loss of biodiversity and environmental degradation;
3. High illiteracy rate;
4. High maternal and infant mortality rates;
5. Limited access to potable water and improved sanitation;
6. Poor transport and communication infrastructure;
7. High poverty levels;
8. High incidences of gender based violations;
9. High crime rate;
10. Weak institutional capacity for effective decentralized service delivery; and
11. Poor development of trading (semi-urban) centres.

In order to address these development issues and accelerate economic development of the district, the
plan has among others identified the following opportunities and potentials; the existence of soils that
are suitable for agriculture including vast areas of irrigable land; forestry resources; fisheries; provision
of banking and credit facilities in rural areas for business growth and entrepreneurship; and tourism for
employment creation.

This DDP is composed of seven chapters. Chapter One is the introduction which gives the context of
the plan in terms of the existing national development frameworks particularly the Vision 2020, the
Malawi Growth and Development Strategy III and the Decentralization Policy. Chapter Two presents
the district development planning framework. It gives the vision and development mission of the district.
The 11 development issues are also presented in a matrix form including their causes, the medium term
and immediate development objectives and strategies. The chapter concludes with a discussion on the
potentials and resource endowments of the district. Chapter Three presents the programmes and projects
in a matrix form. It is a translation of the strategies into specific courses of action which when properly
implemented will cumulatively result into improved living standards of communities. Chapter Four
presents an analysis of the resources for the district focusing on council investments; private
investments; and future financial investments. Chapter Five outlines the costing and sources of financing
for the identified programmes and projects. Chapter Six presents the Monitoring and Evaluation
Framework. It outlines the arrangements for monitoring and evaluating the DDP. It also presents the
result matrix with measurable targets for the five year period. Chapter Seven is the conclusion.
ix
The total budget required to finance this DDP is estimated at MK106, 120,060,000. This amount is
expected to come from various sources including grants from central government, district own locally
generated resources, communities through cash and in-kind resources, the private sector, Non-
Governmental Organizations, and donor projects.

x
CHAPTER ONE: INTRODUCTION
National Development Frameworks

The Zomba District Development Plan is anchored by three national development policies namely:
Vision 2020; the Malawi Growth and Development Strategy III (MGDS III); and the National
Decentralization Policy. The following sections briefly discuss these policies and how they relate to this
plan.

i. Vision 2020
Vision 2020 is a long term development objective for the people of Malawi which has been running
since 1997. It articulates the social and economic aspirations of the nation to be attained by the year
2020. It emphasises long term strategic thinking, shared vision, visionary leadership, participation by
the population, strategic management and national learning. The vision states that: “By the year 2020,
Malawi as a God –fearing nation will be secure, democratically mature, environmentally sustainable,
self- reliant with equal opportunities and active participation by all, having social services, vibrant
cultural and religious values and being a technologically driven middle income country”.

The vision identifies the following key national priorities:

 Good governance;
 Sustainable economic development;
 Vibrant culture;
 Economic infrastructure;
 Social development;
 Science and technology led development;
 Fair distribution of income and wealth;
 Food security and nutrition; and
 Sustainable natural resources and environmental management.

In line with these national priorities, this DDP has among others prioritized the following; food and
nutrition security; road and ICT infrastructure, natural resources and environmental management; and
strengthening of institutional capacity for effective decentralized service delivery. Implementation of
interventions in these areas will therefore directly contribute to the achievement of the Vision 2020
priorities.

ii. The Malawi Growth and Development Strategy III (MGDS III)
The MGDS III translates the Vision 2020 into a medium-term development strategy. The strategy aims
at building a productive, competitive and resilient nation. It is built on five key priority areas namely:
agriculture, water development and climate change management; education and skills development;
energy, industry and tourism development; transport and information, communication and technology
(ICT) infrastructure; and health and population. The strategy also identifies other areas of development
intervention as follows: financial services; gender, youth development, persons with disability and social
welfare; human settlement and physical planning; environmental sustainability; nutrition; HIV and
AIDS management; peace and security and integrated rural development. The selection of these key
priorities followed a mapping process to international development frameworks such as the 2030
Agenda on Sustainable Development Goals (SDGs) and African Union Agenda 2063.

Pursuant to these priorities of MGDS III, this DDP has among others prioritised the following
development issues; education and skills development; food and nutrition security; health; transport and
ICT infrastructure; water development; peace and security; and physical planning and human settlement.
Interventions in these areas will directly contribute to MGDS III priorities. Therefore, while Zomba
District has formulated this localised development plan, she is also committed to implementing national
development frameworks which will be done through annual investment plans.

During the implementation of the predecessor of the MGDS III (MGDS II) and particularly during the
2016/17 financial year, Zomba District registered remarkable achievements as follows:

- Monitored community water supply infrastructure performance in 4 gravity fed piped water
schemes;
- Sent 10 Primary Education Advisors for training in advisory services at the Malawi Institute of
Education;
- Put 61,105 hectares under modern farming and inputs;
- 14,746 women delivered and were attended to by skilled personnel;
- Provided HIV Counseling and Testing (HCT) Services to 107,608 people;
- Registered 2289 and assessed 2278 literacy learners in the 198 literacy classes. A total of 2,153
learners were declared literate;
- Revamped 5 Traditional Authority (TA) Based Youth Networks;
- Planted 160,000 seedlings (100 hectares) with a survival rate of 85%;
- Formed 35 irrigation groups and trained 28 of them; and
- Revised Fisheries Socio Economic Profile.

Despite these achievements, effective implementation of planned programmes continues to face several
challenges which include the following:

- Inadequate other recurrent transactions (ORT) resources;


- Delayed and inadequate monthly funding;
- Inadequate and unreliable motor vehicles and motor cycles for field operations;
- Inadequate human resource capacity; and
- Weak coordination and collaboration among stakeholders implementing similar activities.

Therefore, during the lifespan of this 2017-2022 DDP, Zomba District Council will continue to
contribute to the implementation of MGDS III by investing in sectors of health, environment,
agriculture, education, water, tourism, transport and communication. To ensure smooth implementation
of the planned programmes, the council will also continue to liaise with the Treasury for increased and
2
adequate other recurrent transactions (ORT) funding and improve the levels of locally generated
resources. To improve mobility for field work, the council will procure more new vehicles and
motorcycles and also continue to encourage inter-borrowing of vehicles amongst the sectors. The
council will also lobby for recruitment of technical staff in all sectors. To improve coordination and
information sharing amongst development actors in the district, the council will continue conducting
quarterly stakeholder meetings. The council will also focus on establishing partnerships with other
District Councils within and outside Malawi to enhance learning in local government management.

iii. The National Decentralization Policy


Devolution of political and administrative authority to district level is a priority of Malawi Government
as outlined in the National Decentralization Policy. The policy was approved by cabinet in 1998 and is
supported by the Local Government Act of 1998. The Decentralization Policy aims at:


Devolving administrative and political authority to the districts;

Integrating governmental agencies at the district and local level into one administrative unit
through the process of institutional integration, manpower absorption, composite budgeting and
provision of funds for the decentralized services;
 Diverting the centre of implementation responsibilities and transfers to the districts;
 Assigning functions and responsibilities to the various levels of government; and
 Promoting popular participation in governance and development of the districts through actively
involving the ordinary people in designing, implementing, monitoring and evaluating their socio-
economic interventions in the rural areas.
The Decentralization Policy seeks to achieve the following objectives:
 To create a democratic environment and institutions in Malawi for governance and development;
at the local level which will facilitate the participation of the grassroots in decision making;
 To eliminate dual administrations (field administration and local government) at the district level
with the aim of making public service more efficient, more economical and cost effective;
 To promote accountability and good governance at the local level in order to help Government
reduce poverty; and
 To mobilize the masses for socio-economic development at the local level.
Through the National Decentralization Policy, Zomba District Council is charged with the overall
development of the district. In the course of its development work, the council is required to provide for
local people's (communities) participation in the formulation and implementation of District
Development Plans (DDP). It is in this respect that the council is requested to form action committees
at area, and village levels. The DDP process is expected to promote decentralization and further guide
development planning in an effort to achieve sustainable poverty reduction through socio-economic and
political empowerment of the communities.

3
CHAPTER TWO: DISTRICT DEVELOPMENT PLANNING
FRAMEWORK
This chapter presents the development planning framework for Zomba District in the context of
international and national development agenda particularly the Sustainable Development Goals and
Malawi Growth and Development Strategy III. The chapter also gives the vision, mission and the core
values that guide the operations of the council. Development issues and their causes are also highlighted.
The chapter further outlines the medium and short-term council’s objectives and strategies in addressing
these issues. The chapter is concluded by outlining the economic and other potentials of the district.

i. Vision
The vision of Zomba District Council is ‘to have a vibrant and self-sustaining District Council that is
capable of providing quality socio-economic services to the citizenry’.

ii. Development Mission


The mission of Zomba District Council is ‘to provide quality socio-economic services to all the people
in the district through active participation of all stakeholders in order to empower communities at
grassroots level and improve the quality of their lives’.

iii. Core Values


In its pursuit to successfully attain the desired outcomes and achieve the strategic goals which have been set
out in this plan, the council is guided by the following four core values:
 Commitment: The council shall be dedicated and committed to service delivery for its citizenry;
 Transparency: The council shall transact right business and do so with openness;
 Integrity: The council shall transact business professionally, morally and ethically; and
 Collaboration: The council shall promote team work to ensure good relationship with all its
stakeholders and where appropriate involve all key partners in development and service delivery.

iv. Prioritized Development Issues


Analysis of the 2017 Zomba District Social Economic Profile (SEP) and Village Action Plans (Annex
2) resulted into isolating 11 development issues which will be the focus of development programming
in the district for the next five years (2017-2022). These are presented in Table 1 below and have been
prioritized as follows:

1. Food and nutrition insecurity at household level;


2. Loss of biodiversity and environmental degradation;
3. High illiteracy rate;
4. High maternal and infant mortality rates;
5. Limited access to potable water and improved sanitation
6. Poor transport and communication infrastructure;
7. High poverty levels;
8. High incidences of gender based violations;
9. High crime rate;
10. Weak institutional capacity for effective decentralized services delivery; and
11. Poor development of trading (semi-urban) centres.

4
Table 1 below is a District Development Planning Framework that depicts the development priority issues, their causes, development
objectives and associated strategies. The framework also establishes linkages between these issues and the priorities of the Malawi
Growth and Development Strategy III and the Sustainable Development Goals.
Table 1: Zomba District Development Planning Framework (DDPF)
No. Development Causes Development Medium Term Strategies Linkage to Domesticatio
Issue Objective/Benc Objective National n of
h Mark and Development Sustainable
Target Agenda as per Development
MGDSIII KPAs Goals

1. Food and Soil infertility To increase the Increase Promote conservation  Agriculture, SDGs 1, 2, 3,
nutrition proportion of agricultural agriculture; Support Water 8, 12, 13,
insecurity at food secure productivity programmes aimed at Development
through mitigating land and Climate
household households from
sustainable land degradation such as Change.
level. 87% to 95% by management. catchment area  Health and
2022 protection and Population.
appropriate farming
. practices; and Promote
growing of nitrogen-
fixing plants, such as
legumes and agroforestry
technologies and systems
in crop farming.
Low access to Increase access to Promote input supply
productivity- and appropriate through farmer-based
improving farm utilization of organizations, agro-
inputs. productivity- dealers, contract farming
enhancing inputs. and pass-on
arrangements; Facilitate
access to finance for
supply and purchase of
farm inputs.

5
No. Development Causes Development Medium Term Strategies Linkage to Domesticatio
Issue Objective/Benc Objective National n of
h Mark and Development Sustainable
Target Agenda as per Development
MGDSIII KPAs Goals

Poor adoption of Increase adoption Acquire and maintain


good agronomic of agricultural transportation assets,
practices (GAP) technologies such as vehicles and
motorcycles to enable
extension agents reach
out to farmers;
Strengthen coordination
among all extension
service providers at all
levels; Promote use of
innovative extension
approaches such as
model village, farmer
field schools, farmer
business schools, plant
clinics and lead farmers;
Use agricultural fairs,
shows and expos to
expose farmers to new
agricultural technologies;
and Lobby for adequate
and motivated extension
staff.

6
No. Development Causes Development Medium Term Strategies Linkage to Domesticatio
Issue Objective/Benc Objective National n of
h Mark and Development Sustainable
Target Agenda as per Development
MGDSIII KPAs Goals

Underutilization of Increase crop Promote year round


irrigable land. yields and reduce diversified irrigation
volatility in farming; Sustainably
agriculture develop areas with
production irrigation potential to
through increasing facilitate utilization of
area under irrigable land; Promote
sustainable and invest in water
irrigation farming harvesting technologies
by 50 percent. and storage systems for
irrigation.
Prevalence of pests, Reduce pre and Strengthen surveillance
parasites and post-harvest losses systems for monitoring
diseases in crops from 30% to 20% outbreaks of pests and
and livestock. and enhance diseases; and Strengthen
quality of programmes for animal
agricultural disease and pest
products prevention including
vaccination.
Low livestock Increase Promote livestock pass
population for food sustainably the on programmes;
and income stock of beef and Strengthen surveillance
dairy cattle from systems for monitoring
23917 and 1713 to outbreaks of parasites,
30525 and 2292 pests and diseases; and
respectively by Establish and maintain
2022 dip tanks.

7
No. Development Causes Development Medium Term Strategies Linkage to Domesticatio
Issue Objective/Benc Objective National n of
h Mark and Development Sustainable
Target Agenda as per Development
MGDSIII KPAs Goals

Low dietary Ensure that district Promote agricultural


diversity and food food and nutrition related income
utilization at security is generating activities to
household level. achieved through enable the population to
production and obtain sufficient income
utilization of for their food and
sufficient nutrition requirements;
quantities of high- and Promote the growing
quality foods. and utilization of
indigenous fruits,
vegetables, small stock,
edible insects, and small
wild animals.
Ensure availability Encourage farmers to
and access to safe diversify production of
and nutritious food crops, livestock, and fish
products in in order to enhance
sufficient availability of nutritious
quantities. food products; Promote
increased participation in
off-farm income
generating enterprises,
especially for women
and youth; and Promote
technologies that reduce
post-harvest losses in
storage, preservation and
food processing.

8
No. Development Causes Development Medium Term Strategies Linkage to Domesticatio
Issue Objective/Benc Objective National n of
h Mark and Development Sustainable
Target Agenda as per Development
MGDSIII KPAs Goals

Weak linkages to Promote Train farmers in


food and produce competitiveness of appropriate use of
markets for food and produce technologies, inputs, and
increased household marketing value storage facilities to
incomes and food chains. enhance farmers’
security. productivity and product
quality; Strengthen
farmer organizations
through improving the
development, branding,
quality, and marketing of
their products,
establishing labour
standards and building
skills in price
negotiation; Strengthen
the capacity of farmer
organizations/
cooperatives to store and
process farm produce.
Low agriculture Improve efficiency Promote tractor hire
mechanization and reduce burden scheme; Promote
making it of labour Oxenization; and
unattractive to many associated with Promote small machinery
people lack of proper for value addition
mechanization, to
make farming
attractive

9
No. Development Causes Development Medium Term Strategies Linkage to Domesticatio
Issue Objective/Benc Objective National n of
h Mark and Development Sustainable
Target Agenda as per Development
MGDSIII KPAs Goals

Dwindling fisheries Increase Build capacities of the


resources from availability of fishing communities in
6325.45 metric tons fisheries resources sustainable fisheries
in 2008 to 2005.9 from 2005.9 to resource management;
metric tons in 2015 4400 metric tons and Provide logistical
by 2022 support for law
enforcement on Lake
Chilwa.
2. Loss of Deforestation To reduce loss To increase area Implement afforestation  Agriculture SDGs 7,11,12,
biodiversity of biodiversity under forestry and regeneration Water 13, 14, 15
and and cover through programmes. Development
environmental environmental afforestation from and Climate
Change
degradation degradation 4585 ha to 5050 ha
 Energy,
by 2022 Industry and
Low availability of To promote IGAs Train and provide Tourism
sustainable IGAs such as Bee material support for Development
keeping, Village income generating  Transport and
Saving Loans activities (IGAs). ICT
(VSL), goat- pass- Infrastructure,
on programmes  Disaster Risk
and fruit tree Management
orchards. and Social
Bush fires To create Conduct awareness Support
awareness on bush meetings on fire
fires management.

 Weak /absence  To develop  Facilitate


of regulatory forest development of
and management forest management
management and enterprise plans and DEPs

10
No. Development Causes Development Medium Term Strategies Linkage to Domesticatio
Issue Objective/Benc Objective National n of
h Mark and Development Sustainable
Target Agenda as per Development
MGDSIII KPAs Goals

frameworks for development  Facilitate formation


natural plans and strengthening of
resources  To form and VNRMCs
train Village  Promote
Natural collaborative
Resources management of
Management forest resources
Committees  To lobby for review
(VNRMCs) of the Forest Act
 To strengthen (1997)
collaboration  Formulate and
among enforce local by-
stakeholders laws on
 To improve environmental
regulatory management
framework for  Mainstream climate
environmental change in district
management plans
 Mainstream Disaster
Risk Reduction in
district plans
In adequate forest To intensify law Conduct frequent forest
patrols enforcement patrols
Population pressure To reduce family Promote family planning
size from 4.4 to practices
4.0
Low access to To promote  Construct a climate
Disaster Risk, Community Based change center
Hazards, Early Early Warning
Warning Systems

11
No. Development Causes Development Medium Term Strategies Linkage to Domesticatio
Issue Objective/Benc Objective National n of
h Mark and Development Sustainable
Target Agenda as per Development
MGDSIII KPAs Goals

Information  Provide climate


especially floods, related information
Cholera and to communities
droughts  Undertake
environmental
education
 Disseminate
information of
impending disasters
through Community
Radios.
 Develop Disaster
Community Based
Early Warning
Systems.
 Low utilization To promote  Promote use of
of sustainable sustainable energy alternative energy
energy sources. technologies. sources including
 Inadequate the planting and use
sources of of green bamboo
sustainable  Promote and
energy. intensify use of
appropriate
technologies such
as fire briquettes
made from leaves
for energy.
Effects of climate To build capacity Implement viable climate
change. for disaster change adaptation and
resilience. mitigation measures.

12
No. Development Causes Development Medium Term Strategies Linkage to Domesticatio
Issue Objective/Benc Objective National n of
h Mark and Development Sustainable
Target Agenda as per Development
MGDSIII KPAs Goals

In adequate response To provide Implement disaster


and recovery items preposition stocks response recovery
in the district. in the district interventions.
warehouse.
3 High illiteracy Poor and inadequate To increase Improve school Construct and  Education and SDGs 4, 16,
rate infrastructure literacy levels infrastructure rehabilitate school Skills 17
(school blocks and from 69.4 % infrastructure Development
teachers houses)
to75% by 2022  Transport and
 High  To reducer  Lobby for more ICT
learner/teacher learner qualified teachers Infrastructure
ratio of 82:1 teacher ration and distribute them
 Inadequate from 82:1 to equitably
number of 66:1  Provide in-service
qualified  Increase training to teachers
teachers(2785) number of
qualified staff
from 2587 to
3000 by 2022
 Provide in-
service
training to
teachers.
Harmful traditional Increase public Carry out awareness on
and cultural awareness on the the importance of
practices importance of education
education

13
No. Development Causes Development Medium Term Strategies Linkage to Domesticatio
Issue Objective/Benc Objective National n of
h Mark and Development Sustainable
Target Agenda as per Development
MGDSIII KPAs Goals

Poverty  Provide  Establish


education Harmonized Council
support to Education
needy students Fund/Bursary
 Lobby for  Lobby for expansion
expansion of of school feeding
school feeding programme
programme
Inadequate teaching Increase  Procure adequate
and learning availability of textbooks and
materials teaching and learning materials
learning materials
particularly desks
from 17:1 to 10:1
by 2022
Poor participation of Increase  Build capacity of
communities in participation of communities and
school governance communities in school management
and management. school committees in school
management management.

Inadequate support Provide support  Establish resource


for special needs for special needs centres for special
education education needs education.
Poor delivery of Improve delivery  Intensify supervision
curriculum. of curriculum by of teaching and
orienting 3219 learning in schools.
teachers every
year

14
No. Development Causes Development Medium Term Strategies Linkage to Domesticatio
Issue Objective/Benc Objective National n of
h Mark and Development Sustainable
Target Agenda as per Development
MGDSIII KPAs Goals

Lack of Improve  Train 200 school


management management of management
capacity of school school grant committees
grant.
Limited Mainstream  Mainstream Disaster
mainstreaming of sectoral policies in Risk Management
sectoral policies in education planning (DRM), Water,
education planning. Sanitation and
Hygiene (WASH)
among other policies
in education plans
 Low enrollment  Increase  Carry out awareness
in adult literacy attendance on the importance
classes and male adult literacy
education
 Poor male participation
 Conduct campaigns
attendance in in adult
on importance of
adult literacy literacy ECD
classes classes  Facilitate
 Inadequate and  Increase construction and
inequitably access to rehabilitation of
distributed Early CBCC infrastructure
Childhood  Build capacity of
Community
caregivers and
Based Child Development
communities in
Care Centres (ECD) CBCC management
(CBCCs) services by  Lobby for ECD
 Poor and constructing services support from
inadequate 20 model Partners
CBCC

15
No. Development Causes Development Medium Term Strategies Linkage to Domesticatio
Issue Objective/Benc Objective National n of
h Mark and Development Sustainable
Target Agenda as per Development
MGDSIII KPAs Goals

infrastructure of centres by
899 2022.
 Inadequate
number of
trained
caregivers of
2490
 Few partners
involved in the
area of ECD
4 High maternal  Inadequate Reduce maternal  To increase  Incentivize HRH in Health and SDGs 1, 3, 6,
and infant health staff of and infant number of hard-to-reach areas Population 11, 17
mortality rates 964 mortality rates health  Lobby for more staff
 Unavailabilit respectively from personnel  Upgrade Domasi
y of District from 964 to Community Hospital
675/100000 and
Hospital 1800 by 2022 to a district hospital
75/1000 to 
 High stock To reduce by 2022
outs of 645/100000 and nurse  Construct and
essential 55/1000 by 2022 population rehabilitate health
drugs, ratio from 1: facilities
supplies and 3489 to 1:  Maintain adequate
equipment 2700 by 2022 stocks of drugs,
 Long  Increase the supplies and
distances to number of equipment.
health health  Provide sexual
facilities facilities to reproductive health
(average of reduce services to youths.
12Km). average
distance to

16
No. Development Causes Development Medium Term Strategies Linkage to Domesticatio
Issue Objective/Benc Objective National n of
h Mark and Development Sustainable
Target Agenda as per Development
MGDSIII KPAs Goals

 Poor health
sanitation in facilities from
health 12 km to 8
facilities km
 Limited  To introduce
access to incentives for
Youth HRH in hard-
Friendly to-reach areas
Health  To reduce
Services shortages of
(YFHS). health
 Limited personnel
knowledge of  To allocate
maternal and more
child health resources for
issues by outreach
mothers and services
guardians  Upgrade and
rehabilitate
existing
health
facilities
 To increase
availability of
essential
drugs, and
medical
equipment
 Increase
accessibility
and

17
No. Development Causes Development Medium Term Strategies Linkage to Domesticatio
Issue Objective/Benc Objective National n of
h Mark and Development Sustainable
Target Agenda as per Development
MGDSIII KPAs Goals

availability of
YFHS
5 Limited access  Vandalism of To increase the  Safeguard  Promote community  Health and SDGs 1, 3, 6,
to potable water and proportion of water policing in protecting Population 11, 12, 13,15,
water and sanitary households with infrastructure water facilities from  Agriculture’ 17
improved facilities; access to from vandalism Water
 Poor vandalism  Build the capacity of Development
sanitation improved water
participation of  To increase the district and and Climate
communities in source and functionality communities in Change
Operation and improved rate of water Operation & Management
maintenance sanitation from facilities from Maintenance
systems of 83% to 95% and 76% to 80% (O&M) of water
water facilities; 47.3 to 55%  To encourage infrastructure
 Low respectively by community  Construct safe water
functionality participation facilities equitably
2022.
rate of water in  Construct and
facilities of management rehabilitate gravity
76% . of rural water fed piped water
supply schemes
schemes  Rehabilitate safe
 To promote facilities
equitable  Promote catchment
distribution of management
safe water  Lobby for more
supply Water Monitoring
facilities. Assistants
 To promote  Strengthen
participatory DCT/CSOs
management coordination on
of endangered allocation of new
catchments

18
No. Development Causes Development Medium Term Strategies Linkage to Domesticatio
Issue Objective/Benc Objective National n of
h Mark and Development Sustainable
Target Agenda as per Development
MGDSIII KPAs Goals

water points for


equity.
 Inadequate To increase the  Promote Community
knowledge on number of Open Led Total Sanitation
sanitation and Defecation Free (Behavior Change
hygiene villages from 44% and communication).
practices.  Undertake hygiene
to 60% by 2022.
 Low campaigns and
knowledge on sanitation marketing.
different
latrine options
by the
communities.
6 Poor transport  Irregular To improve  To increase  Construct road Transport and ICT SDGs 9, 16,
and maintenance of transport and road network infrastructure Infrastructure 17
communicatio roads communication of district  Embark on regular
n infrastructure infrastructure infrastructure roads from road maintenance
 Insufficient 189.6km to  Operate boats on
district road 289 km by Lake Chilwa
network (189.6 2022  Implement public
Km)  To improve awareness on
 Poor water existing road importance of road
transport on network infrastructure to curb
Lake Chilwa  To increase vandalism
 Inadequate ICT supportive  Promote ICT
Infrastructure road structures services in trading
 No mobile  To improve centres and public
network internet and institutions
connectivity in mobile  Lobby for more
5 ADCs telephone mobile network
network connectivity

19
No. Development Causes Development Medium Term Strategies Linkage to Domesticatio
Issue Objective/Benc Objective National n of
h Mark and Development Sustainable
Target Agenda as per Development
MGDSIII KPAs Goals

 Few trained accessibility  Establish rural


artisans in road and libraries
construction and penetration  Build capacity of
maintenance from 6 ADCs road infrastructure
 Few community to all 11 artisans.
based ICT ADCs by  Train ICT skills in
infrastructure 2022 technical and
operators and  To increase community colleges
artisans access to print  Prioritize ICT
 Limited and electronic trainings in council
provision of media. staff development
road safety  Develop plans.
services to road capacity in  Provide road safety
users and ICT at all services to road users
communities levels and communities.
 Promote
mainstreamin
g of ICT in
sector
policies,
strategies and
operations
 Provide road
safety services
to road users
and
communities

20
No. Development Causes Development Medium Term Strategies Linkage to Domesticatio
Issue Objective/Benc Objective National n of
h Mark and Development Sustainable
Target Agenda as per Development
MGDSIII KPAs Goals

7 High Poverty  Inadequate Reduce the  To improve  Establish  Education SDGs 1, 2, 3,


Levels skills in various proportion of access to cooperatives for and Skills 4, 8, and 9
trades including households marketing farmers Development
vocational and perceived very networks  Establish rural  Agriculture
technical  To improve market centres Water
poor by self from
 High reliance on access to  Increase access to Development
subsistence 58.3% to 50% by credit technical, vocational and Climate
farming 2022 facilities and entrepreneurship Change
 Low paying  To increase skills training Management
agricultural access to off-  Facilitate access to  Energy,
based jobs farm micro-finance and Industry and
 Poor access to employment credit facilities Tourism
value chain opportunities  Develop artisanal Development
market networks including the and small scale  Gender,
 Lack of tourism sector manufacturing Youth
collateral to  To increase enterprises Development
access credit education  Develop the tourism , Persons
 Increased attainment sector with
number of ultra- levels for both  Implement social Disability
poor and labour sexes support programmes and Social
constraint  To develop  Promote gender and Welfare
households skills for the women
 Women youths empowerment
vulnerability  Increase programmes
 Low education economic  Implement disability
attainment resilience of programmes
 Inadequate the ultra-poor  Implement youth
support to households empowerment
people with  Mainstream interventions such as
disabilities disability technical skills
programmes

21
No. Development Causes Development Medium Term Strategies Linkage to Domesticatio
Issue Objective/Benc Objective National n of
h Mark and Development Sustainable
Target Agenda as per Development
MGDSIII KPAs Goals

 Low support to in district development


youth plans programmes
development

8 High  Harmful social To reduce  Increase  Promote education of Health and SDG 9,11, 17
incidences of and cultural percentage of marriage vulnerable children Population
gender based practices women who counseling  Intensify HIV and
violations  Family experience services AIDS management
instability  Promote interventions
physical violence
 Low gender  Construct more
from 45.1 to 40% mainstreaming
participation of VSUs
women, youth by 2022 in plans  Implement awareness
and children in  Awareness campaigns on gender
development promotion on related policies and
 Low levels of gender related human rights
awareness on policies
laws and  Awareness
policies relating promotion of
to women and human rights
children. including that
 High demand of children
for cheap labor  Mainstream
 HIV and AIDS HIV
pandemic at interventions
prevalence rate in
of 13.2% programmes
 Low literacy  Reduce
levels of 69.4% incidences of
early
marriages

22
No. Development Causes Development Medium Term Strategies Linkage to Domesticatio
Issue Objective/Benc Objective National n of
h Mark and Development Sustainable
Target Agenda as per Development
MGDSIII KPAs Goals

 Child marriages  Provide more


and teenage VSU services
pregnancies
 Inadequate
VSUs
9 High crime  Poverty To reduce crime  To increase  Establish and  Education and SGD 11, 16,
rate  Inadequate rate from 25% in the number of rehabilitate Police Skill 17
police 2017 to 15% by police units units Development
establishments 2022  To increase  Establish and  Peace and
and uniformed strengthen existing Security
infrastructure police community
 Inadequate and visibility policing structures
weak  Create  Sensitize
community awareness on communities on
policing human rights human rights
structures to  Promote youth
 High illiteracy communities development
rate  Provide public programmes
 Lack of sports and  Construct and
understanding recreation rehabilitate court
of human rights facilities infrastructure
 Inadequate  Improve court including staff
investment in infrastructure housing
development of  Improve  Capacity building
the youths prison to opinion leaders
 High incidences infrastructure including chiefs
of gender based  Promote  Construct sports
violations national facilities and youth
 Low access to registration development
judicial services centres

23
No. Development Causes Development Medium Term Strategies Linkage to Domesticatio
Issue Objective/Benc Objective National n of
h Mark and Development Sustainable
Target Agenda as per Development
MGDSIII KPAs Goals

 Poor prison among the  Construct and


services citizens rehabilitate prison
 Lack of national  Conduct infrastructure
identification of awareness  Improve court
citizens campaign on infrastructure
 Limited gender based  Conduct public
tracking and violations awareness on
support to  Track and National Ids, Birth
released provide and Death
prisoners support to Registration
released  Track and provide
prisoners support to released
prisoners for
integration
10 Weak  Low staffing To strengthen  Lobby for  Lobby for adequate  Agriculture, SDG 8
institutional levels to institutional adequate staffing to devolved Water
capacity for devolved capacity for staffing levels sectors Development
effective sectors effective in all sectors  Formulate Council and Climate
 Inadequate staff  Provide staff development change
decentralized decentralized
development infrastructure plans Management
services services delivery 
interventions and equipment  Construct and Health and
delivery  Inadequate  Build capacity rehabilitate offices population
infrastructure of local and staff houses  Education
and equipment development  Build capacity of and Skills
for offices structures local development Development
 Weak local  Empower structures
development communities  Carry out public
structures i.e. in governance awareness on
Council, ADCs, and development and
AECs VDCs, development democracy
etc. for

24
No. Development Causes Development Medium Term Strategies Linkage to Domesticatio
Issue Objective/Benc Objective National n of
h Mark and Development Sustainable
Target Agenda as per Development
MGDSIII KPAs Goals

 Low community transparency  Construct/rehabilitat


participation in and e market and other
development accountability revenue generating
and governance  To increase infrastructures
 Weak base for revenue base  Build capacity of
council revenue for the staff, council service
generation Council committees and
 Inadequate  Improve market committees
financing to market and in revenue
devolved other mobilization
functions commercial strategies
 Limited infrastructure  Carry out revenue
participation of  Improve mobilization
the private community campaigns
sector in socio- participation  Lobby for adequate
economic in market financing to the
development of management council
the district  Improve the  Identify and engage
 Absence of an participation the private sector in
operational of the private the socio-economic
district council sector in development of the
website socio- district through PPPs
 Limited economic  Establish and
learning development operationalize
opportunities of the district council website
from other  Establish and  Establish
district councils maintain partnerships with
district council District Councils
website within and outside
 Establish Malawi to enhance
partnerships learning in local

25
No. Development Causes Development Medium Term Strategies Linkage to Domesticatio
Issue Objective/Benc Objective National n of
h Mark and Development Sustainable
Target Agenda as per Development
MGDSIII KPAs Goals

with other government


district management
councils in
and outside
Malawi.
11 Poor  Increased Enhance urban  Develop  Produce and update  Energy, SDGs 7 and 11
development informal planning and Urban urban structure plans tourism and
of trading settlements management in Develop Plans  Develop detailed industrial
(semi-urban)  Lack of urban semi-urban for selected layout plans development
structure plans centres semi-urban  Provide electricity,  Human
centres
and detailed centres water, and other Settlement
layout plans  Provide social and economic and Physical
 Limited access integrated infrastructures in Planning
to basic rural selected trading
facilities development (semi-urban) centres.
(electricity, services  Construct and
social rehabilitate roads to
infrastructures, semi-urban centres
financial  Conduct public
services and awareness on urban
ICT services). planning and other
 Poor access related laws
(road network to
semi-urban
centres)
 Lack of
knowledge on
land governance
laws

26
v. Economic Potentials of Zomba District
Zomba District has a number of sectors which have the potential to contribute to the economic development
of the district. These include: agriculture; forestry; banking and credit facilities; tourism and fisheries. These
are discussed in the next sections.

a) Agriculture
The economy of Zomba District is dominated by agriculture. Generally, the overall type and texture of the
soils are suitable for agricultural production for crops such as maize, cassava, sweet potato, rice, beans,
pigeon peas and ground nuts. Furthermore, Zomba District has a potential for irrigation development with
a total irrigable area of 60,000 hectares out of which only 2,191 hectares is developed. Most of this land is
under gravity fed irrigation due to low operational cost. The upland soils, though less fertile, are suitable
for developments in agro- forestry and riverine farming. Interventions in the agriculture sector will therefore
centre on increasing production and productivity through application of appropriate technologies and
development of irrigation farming among others.

b) Forestry
Forestry resources in Zomba are of vital economic importance. The sector has several forest plantations
which offer various benefits to the communities within the district and surrounding areas. The most notable
is Zomba Mountain Timber Plantation which is wholly owned and managed by government and is located
on a plateau and outer slope. The sector however faces some challenges including bush fires and careless
harvesting of forest products leading to loss of biodiversity and environmental degradation. In order sustain
the economic importance of the forest sector, the interventions will focus on protecting the forest resources
by putting in place proper regulatory and management frameworks.

c) Banking and Credit Facilities


Zomba District relies on commercial banks situated in Zomba City which provide all ranges of financial
services (i.e. loans, savings, money transfer, financial credit for inputs and business working capital). On-
farm activities are also supported by the banks. With the advancement of technology, the financial sector
has witnessed an in-flux of non-traditional firms which have joined the industry and provide banking
services such as mobile money. Furthermore the district is endowed with public and private institutions
which offer capacity building trainings in business management. The district also has some government
departments including agriculture (agribusiness section), community development and business promotion
office and NGOs such as Farmers Union, Farmers Organisation, NASFAM, World Vision and Save the
Children also offering business management trainings. Coupled with the presence of the banking and credit
facilities, the training in business management may enable entrepreneurs to start and expand their
businesses. An opportunity therefore exists to provide banking and credit services in the currently unserved
rural Zomba.

d) Tourism
Zomba District is endowed with natural beauty and various tourist attractions. It has a diverse landscape
which offers a variety of distinct natural attractions. These range from Zomba, Chikala hills and Malosa
Mountains to flat plains of Lake Chilwa. The lake itself provides opportunities for individual leisure
holidays, fishing, horse riding, biking, bird watching, searching and digging for crystals. These are some of
the reasons for investing in tourism in Zomba District.

27
Additionally, historical buildings within Zomba City as the centre of the district offer a variety of interesting
places and activities. Furthermore, the location of Zomba District in proximity of Lake Malawi (one hour
drive) and the cities of Blantyre and Zomba makes it a potentially prime recreation area for leisure or
business tourists. Although tourism is developing in the district, particularly in the area of accommodation,
more potential exists in the provision of conference facilities especially taking advantage of the Lake Chilwa
wetland and Zomba Plateau which have more potential for tourism economies of scale where guests can
have a chance to see more than just attending a conference. Developing this sub-sector has a potential of
creating employment. Interventions in this sub-sector will among others focus on improving access to
tourism sites.

e) Fisheries
The fisheries sector contributes significantly to the livelihoods of rural and urban populations as sources of
income, subsistence and employment. Fisheries resources in Zomba district are found in Lake Chilwa, rivers
and fish ponds. The sector provides direct employment to about 633 fish farmers, 670 fishers and 2,620
crew members and indirectly to over 10,000 people who are engaged in boat building, fish processing and
marketing. Fish from Lake Chilwa is traded in the cities of Zomba, Blantyre and Lilongwe including all
districts in Central and Southern Regions. If well managed, the sector has a potential of contributing over
MWK3.91 billion annually to the economy of Zomba District

f) Other Potentials of Zomba District


Table 2 below presents other potentials that can provide support to the implementation of district
development initiatives.

Table 2: Other Potentials


Type of Resources Location Remarks
Capital Assets: District and City Assets in form of houses, shops, rest house,
Land and infrastructure. markets etc. owned by the council, private
sector and the NGOs.
Financial Resources; Locally generated revenue , District These act as inputs into programme activities.
Local Development Fund, Constituency
Development Fund, ORT and funds from
development partners
Qualified and Experienced Personnel e.g. medical District Provision of professional advice and technical
doctors, agriculturalists, administrators and social backstopping towards efficient, effective and
workers timely service delivery.
Commercial Estates and Farms Chimpeni, Sable Provide labour market and potential source of
Farming and Mpatsa revenue.
Makoka Research Chikowi Centre of agroforestry, cotton, roots and tubers’
technology development.
Farmer Organizations/ Associations and All TAs Promotion of agro-processing, financing and
Cooperatives marketing

28
CHAPETR THREE: PROGRAMMES AND PROJECTS
This chapter translates the strategies outlined in the DDPF (presented in the previous chapter) into specific interventions which
cumulatively are expected to address a specified development issue/challenge in order to improve the living standards of communities in
Zomba. A brief description of the intervention is also outlined including the financing requirement. Where applicable, the specific locations
of the intervention and targeted beneficiaries have also been specified. These are presented in tables 3 to 13 below.

Table 3: Development Initiatives, Programmes and Projects under Food and Nutrition Insecurity at Household Level
Programmes/ Brief Primary Target Implementat Financing Source of Lead Agency/
Project Title Profile/Descri Stakeholders/Benefi Location ion Period Requiremen Financin Organization
ption ciaries ts g
(MK ‘ 000)
Catchment and This project Small holder farmers All ADCs 2500 Ha 2017-2022 200,000 District District
Land will focus on Council, Council
Management catchment NGOs
restoration and and
soil and water Developm
management to ent
improve soil Partners
fertility
Promotion of This program Small Holder farmers All ADCs Yield 2017-2022 300,000 District District
Good Agronomic aims at (Kg/Ha) Council, Council
Practices (GAP) encouraging Ground Nut - NGOs
registered farm 2500; Rice- and
inputs 4000; maize- Developm
suppliers to 7000; Pigeon ent
supply high peas; 2000; Partners
quality farm and Soya-
inputs and 2500
equipment in
remote areas;
train farmers in
GAP for
increased
productivity

29
Programmes/ Brief Primary Target Implementat Financing Source of Lead Agency/
Project Title Profile/Descri Stakeholders/Benefi Location ion Period Requiremen Financin Organization
ption ciaries ts g
(MK ‘ 000)
Livestock The All livestock farmers All ADCs Stock 2017-2022 460,000 District District
Improvement programme (Number) Council, Council
Programme aims at Chicken- NGOs,
increasing the 1,083,534; Developm
population and Pigs-303529; ent
quality of Beef Cattle- Partners
livestock by 30525; Dairy
controlling Cattle- 2292;
parasites and and Sheep-
diseases 32372
through
rehabilitation Mortality
and rates (%)
construction of Chicken-10;
dip tanks as Pigs-8 and
well as meat Cattle-3
inspection to
avoid zoonotic Rehabilitate
diseases and 7 existing
teaching dip-tanks
livestock (Mkupu,
farmers better Lambulira,
management Sunuzi,
practices for Mmina,
livestock Namiwawa,
Kathebwe,
Namasalima)

3 new dip
tanks in
Dzaone ,
Bimbi and
Malosa

30
Programmes/ Brief Primary Target Implementat Financing Source of Lead Agency/
Project Title Profile/Descri Stakeholders/Benefi Location ion Period Requiremen Financin Organization
ption ciaries ts g
(MK ‘ 000)
Integrated Crop This project Smallholder and All ADCs Infestation of 2017-2022 200,000 District District
Pests and aims at medium farmers maize crop Council, Council
Disease strengthening by FAW (%) NGOs
Management surveillance of 10 and
pests and Developm
diseases in ent
crops during Partners
production and
after harvesting
to avoid crop
losses.
Promotion of This project All households All ADCs 250,000 2017-2022 150,000 District District
dietary will focus on (Number of Council, Council
diversification, training households NGOs,
food preservation households in meeting 6- Developm
and sustainable horticulture food group ent
food utilization and growing of minimum Partners
nutritious food dietary
and crops and diversificatio
how they can n
preserve and requirement)
utilize these
foods

31
Programmes/ Brief Primary Target Implementat Financing Source of Lead Agency/
Project Title Profile/Descri Stakeholders/Benefi Location ion Period Requiremen Financin Organization
ption ciaries ts g
(MK ‘ 000)
Establishment The project Smallholder Farmers Lundu, 5 (New 2017-2022 700,000 MFERP, District
and aims at Namadingo, Schemes MASAF4, Council
Rehabilitation of improving food Luwambwe, Established); MDRRP,
Irrigation security and Ndumba, Bimbi, and 15 World
Schemes increasing Sikamu, (Existing Vision,
incomes of Mkanda, Issa, Schemes Save the
smallholder Sitima, Rehabilitated Children,
farmers Kutambala, ) Other
through Masaula Partners
irrigation Chingale, 3000 Ha
farming. The Msambaisa, Under
project will Malonje, Chopi, Irrigation
establish new Tikondame,
schemes in Khwirikhwiri,
selected sites Mulinda,
and rehabilitate Makungula and
the existing T/A Mwambo
ones.
Establishment of The Project Farmers, Agriculture Nkagula, 14 2017-2022 600,000 PRIDE District
Agricultural aims at Trading Companies Ngotangota, Agricultural Project Council
Markets increasing and and Communities Maluwa, Markets Developm
easing access Namasalima, Established ent
to farm inputs Kutambala, Partners
and produce Fikira, Masaula,
through Kapalasa,
establishment Mwangata,
of agriculture Balamanja,
markets in Sunuzi,
selected Ngwelero, and
locations Namakhuwa

32
Programmes/ Brief Primary Target Implementat Financing Source of Lead Agency/
Project Title Profile/Descri Stakeholders/Benefi Location ion Period Requiremen Financin Organization
ption ciaries ts g
(MK ‘ 000)
Integrated Fish The project All Communities All ADCs (MT) 2017-2022 451,000 MFERP, District
Farming aims at which have potential Aquaculture - MASAF4, Council
integrating fish for fish farming. 2000; and MDRRP,
production Capture WFP,
with other Fisheries- FISH
agricultural 240,000 Project
activities at Other
household Partners.
level

Table 4: Development Initiatives, Programmes and Projects under Loss of Biodiversity and Environmental Degradation
Programmes/ Brief Primary Target Implementatio Financing Source of Lead
Project Title Profile/Description Stakeholders/Bene Location n Period Requirem Financing Agency/
ficiaries ents Organizatio
(MK ‘ 000) n
Afforestation The Programme Communities All ADCs Seedlings 2017 -2022 657,000 MFERP, District
and involves planted MASAF4, Council
Regeneration rehabilitation of all (12,500,000) MDRRP,
Programme bare hills and all WFP, MDF,
marginal areas along Regeneratio Other
rivers and streams n (51,050 Partners.
through tree planting, Ha)
regeneration,
creation of woodlots,
fruit orchards and
VFAs
Sustainable and The project aims at Communities All ADCs 12 ADCs 2017-2022 225,000 District District
Renewable promoting fuel Council and Council
Energy Project efficient technologies Development
and alternative Partners
sources of renewable
energy to reduce
heavy reliance on
bio-fuels
33
Programmes/ Brief Primary Target Implementatio Financing Source of Lead
Project Title Profile/Description Stakeholders/Bene Location n Period Requirem Financing Agency/
ficiaries ents Organizatio
(MK ‘ 000) n
Environmental The project aims at Communities All ADCs 12 ADCs 2017-2022 50,000 District District
Awareness and increasing awareness 1 DEAP Council and Council
Action Planning on environment, 2 DSOER Development
Project natural resources Partners
management and
climate change and
formulating
environmental action
plans and state of
environment reports
Sustainable Promotion of forest Communities All ADCs 12 ADCs 2017-2022 225,000 District District
Forests and based enterprises and Council and Council
Livelihoods other IGAs in order to Development
Project improve living Partners
standards of
communities
Environmental The project will Communities All ADCs 12 ADCs 2017-2022 80,000 FISH District
Management facilitate formation of Project, Council
Bylaws bylaws aimed at Adapt
Institutionalizati protecting the Project,
on Project environment at all LGAP
levels
Construction of The project will aim Communities Zomba 1 Centre 2017-2022 10,000 District District
Climate Change at establishing and District constructed Council and Council
Centre (CCC) operationalizing Council and Development
CCC which will be a headquarters operationaliz Partners
hub for all climate ed
related activities and
information sharing

34
Programmes/ Brief Primary Target Implementatio Financing Source of Lead
Project Title Profile/Description Stakeholders/Bene Location n Period Requirem Financing Agency/
ficiaries ents Organizatio
(MK ‘ 000) n
Climate Change The programme aims Communities All ADCs 12 ADCs 2017 - 2022 200,0000 MFERP, District
Adaptation and at implementing MASAF4, Council
Mitigation interventions to MDRRP,
Programme mitigate and adapt to WFP,Red
the effects of climate Cross Adapt
change focusing on Project, Save
building community the Children,
resilience. World
Vision, Other
Partners
Lake Chilwa Aims at protecting Communities Lake Chilwa 6 Catchment 2017 - 2022 400,000 District District
Wetland and the biodiversity and Catchment Areas Council and Council
Catchment catchment of the lake area Protected Development
Management Partners
Project
Disaster Risk The programme aims Communities All ADCs 119 CPCs 2017 - 2022 100,000 M-Crimes; District
Management at developing district DoDMA; Council
Programme and community based 119 hazard Save the
hazard maps maps Children
,constructing safe (ECHO);
haven/ evacuation 3 evacuation Malawi Red
centers and centers Cross
strengthen the (ECHO);
capacity of 1 DRM Plan LEAD
communities and
Civil Protection 1 District
Committees (CPCs) Warehouse
in disaster risk constructed
management, Self-
shelter construction
(PASSA), resilience
through the multi-
hazard system

35
Programmes/ Brief Primary Target Implementatio Financing Source of Lead
Project Title Profile/Description Stakeholders/Bene Location n Period Requirem Financing Agency/
ficiaries ents Organizatio
(MK ‘ 000) n
Early Warning The program aims at Communities All ADCs 36 rain 2017-20122 90,000 M-Crimes; District
System installing river and gauges; Dept. of Council
Improvement rain gauges and 15 River Metrological
Program building the capacity gauge (10 Services;
of communities for rivers); and Department
improved 25 VCPCs of Water
Community Based (Gauge Resources;
Early Warning Readers) Save the
System Children
(ECHO);
Malawi Red
Cross
(ECHO);
LEAD

Table 5: Development Initiatives, Programmes and Projects under High Illiteracy Rate
Programmes/ Brief Primary Target Implement Financing Source of Lead Agency/
Project Title Profile/Descri Stakeholders/Benefi Location ation Requiremen Financin Organization
ption ciaries Period ts g
(MK ‘ 000)
Secondary To increase Communities Mchengawedi; 5 CDSSs 2017 to 750,000, Press District Council
School access to Kapalasa; constructed 2022 Trust,
Construction secondary Matandani; Save the
Program education by Kathebwe; and Children,
constructing Fikira DDF,
community SEPF,
secondary CDF,
schools Faith-
Based
Support

36
Programmes/ Brief Primary Target Implement Financing Source of Lead Agency/
Project Title Profile/Descri Stakeholders/Benefi Location ation Requiremen Financin Organization
ption ciaries Period ts g
(MK ‘ 000)
Teaching and The project Teachers and All the 200 primary 200 primary 2017 to 400,000 WVI, District Council
Learning aims at Learners schools schools in 2022 Save the
Materials providing the district Children,
Procurement learning and UNICEF,
Project teaching Marys
materials to Meals,
primary CDF,
schools Faith-
Based
Support
Construction and The project Primary School All Zones 33 Teachers 2017 to 1,005,000 Save the District Council
Maintenance of aims at Learners and houses; 190 2022 Children,
Classrooms and improving Teachers classrooms LDF,EU,
Teachers’ quality and SIG
Houses for access to Funds,
Primary Schools education by CDF,
reducing the Faith-
shortage of Based
school blocks Support
and teachers
houses in
primary
schools.
School Desks The project Learners All Zones Nankhunda 2017 to 70,000 DDF, District Council
Procurement aims at Katete/Issa 2022. Save the
reducing the Nsamba/Siti Children,
shortage of ma World
desks in Nkanda Bank,
schools Faith-
1320 Desks Based
(60/School) Support

37
Programmes/ Brief Primary Target Implement Financing Source of Lead Agency/
Project Title Profile/Descri Stakeholders/Benefi Location ation Requiremen Financin Organization
ption ciaries Period ts g
(MK ‘ 000)
School Feeding The project All learners ST.Martin, 55 Schools 2017 to 3,496,500 WFP, District Council
Programme aims at Namatapa, 2022 Marys
retaining Chikala, Meals,
learners in Ntonda, Communi
schools St.Pauls, ties,
through Chikomwe, Action
provision of Nsondole, Hope
meals in Namiwawa, Malawi,
primary Mchengawede, YODEP,
schools namadidi and St. Faith-
Micheals Based
Support
Education The project Needy Learners All Zones Needy 2017 to2022 260,000 Save the District Council
Support aims at learners Children,
(Bursary) Project establishing In National WVI, FHI
district Secondary 360,
education Schools (15) CAMFED
support fund District AGE
and providing Boarding Africa,
school fees and (25) Sakata
scholastic Community VIP
materials Day Project,
Secondary Faith-
Schools Based
(40) Support

1 fund
established

38
Programmes/ Brief Primary Target Implement Financing Source of Lead Agency/
Project Title Profile/Descri Stakeholders/Benefi Location ation Requiremen Financin Organization
ption ciaries Period ts g
(MK ‘ 000)
Construction of The project Learners with special All Zones 11 Resource 2018-2020 132,000 District District Council
Resource Centre aims at needs Centre Council
for Special Needs constructing a Constructed
Education resource centre
5that will serve
the children
with special
needs
Construction of Construction of Learners All Zones Pupil Toilet 2017 to2022 50,000 Save the District Council
Latrines new latrines Ratio- 80:1 Children,
and other WVI, EI,
UNICEF,
sanitation
Red
facilities Cross,
Faith-
Based
Support
Bore hole The project Learners Zones [Chikala 17 Schools 2017 to2022 60,000 DDF, District Council
Sinking in aims at sinking Chingale Water
Primary Schools boreholes in Chimwalira Improvem
ent Fund,
schools which Mchengawedi,
UN
do not have Namadidi Agencies,
potable water Namatapa Faith-
Namiwawa Based
Songani Support
St. Martins
St. Michaels]
Libraries Construction of Learners One per zone 17 Library 2071 to 55,000 DDF, District Council
Construction libraries blocks 2022 Faith-
especially in Based
Support
rural schools to
promote
reading culture
39
Programmes/ Brief Primary Target Implement Financing Source of Lead Agency/
Project Title Profile/Descri Stakeholders/Benefi Location ation Requiremen Financin Organization
ption ciaries Period ts g
(MK ‘ 000)
Teachers In- Provision of Teachers All Zones 3196 2017 to 175,000 Save the District Council
Service Training in-service Primary 2022 Children,
training to School ORT
teachers
teachers as part
of continuous
professional
development
Capacity Training Learners All Schools 200 School 2017 to2022 185,000 District District
Building for stakeholders in Managemen Council Council
School order to t and
Committees
Management improve school Developm
Committees management ent
Partners

Administration Provision of an Teachers 17 Zones – One 17 2017 to2022 68,000 District District
Offices enabling School per zone Administrat Council Council
Construction environment ion Blocks and
for teaching to Developm
teachers ent
Partners

Functional Aims at Illiterate Adults All ADCs 60 2017-2022 100,000 District District Council
Literacy mobilising campaigns Council
Promotion communities to and
Program attend Developm
functional ent
literacy in Partners
order to fully
participate in
socio economic
development

40
Programmes/ Brief Primary Target Implement Financing Source of Lead Agency/
Project Title Profile/Descri Stakeholders/Benefi Location ation Requiremen Financin Organization
ption ciaries Period ts g
(MK ‘ 000)
Capacity The project Children, ECD All TAs Train 1800 2017 – 2022 300,000 ORT, District Council
Building for ECD aims at training caregivers, parents Caregivers; UNICEF,
and CBCCs caregivers and Lobby 12 NGOs,
Services lobbying for partners; World
the and Vision,Sa
participation of Provide ve the
more partners honorarium Children
in the ECD and to 1800 Other
providing caregivers Developm
honorarium to ent
CBCC Partners
caregivers.
Construction of The project Parents, communities All TAs 11 ECD 2017 – 2022 169,000 ORT, District Council
ECD Resource aims at centers (1 UNICEF,
Centres and constructing per TA); 9 NGOs,
Model Centres ECD model model World
centres at TA centers (1 Vision,Sa
level and ECD centre per ve the
model centres constituenc Children
at constituency y) Other
level Developm
ent
Partners
Establishment of The project Children, All Traditional 11 (1 per 2017 - 2022 500,000 UNICEF, District Council
Children`s aims at communities Authorities TA) NGOs and
Corners facilitating Developm
establishment ent
of CC across Partners
the district

41
Table 6: Development Initiatives, Programmes and Projects under High Maternal and Infant Mortality Rates
Programmes/ Brief Primary Target Implemen Financing Source of Lead
Project Title Profile/Descr Stakeholders/Bene Location tation Requiremen Financing Agency/
iption ficiaries Period ts Organizati
(MK ‘ 000) on
Upgrading of Domasi All Communities in Domasi 1 2018-2022 14,250,000 Central District
Domasi Community Zomba Government Council
Community Hospital will be and
Hospital to upgraded to Developme
District Hospital reduce nt Partners
congestion at
Zomba Central
Hospital and
increase access
to maternal and
neonatal
services
Health Centres 6 heath centres All communities Namalele 6 2018- 2022 3,500,000 Central District
Construction will be M’biza Government Council
constructed to Kasonga, and
increase access Kambende Developme
to skilled health Chilanga nt Partners
services. Chanda
Construction of Construction of All communities Mmambo 3 2018-2022 1,050,000 District District
Maternity Wings Maternity Maera Council and Council
Wings in health Chisi Developme
centres in order nt Partners
to improve
access to
skilled birth
attendance
Health Centres Rehabilitation All communities Chamba 5 2018- 2022 180,000 District District
Rehabilitation of 5 Health Zilindo Council and Council
Programme Centres in Thondwe Developme
order to Chisi nt Partners
increase access Makwapala
to health care

42
Programmes/ Brief Primary Target Implemen Financing Source of Lead
Project Title Profile/Descr Stakeholders/Bene Location tation Requiremen Financing Agency/
iption ficiaries Period ts Organizati
(MK ‘ 000) on
Construction of Construction of All communities Lundu 10 2018-20122 270,000 District
Under-five U/5 Clinics Nyaka Council
Clinics aims at Mmina DDF,
reducing infant Sunuzi
mortality rate Zaone CDF,
by increasing Chilipaine
access to Kapalasa SEPF
under-five Mgwalangwa
clinic services Kazembe
Mulusu

Facility Based The facility All communities All health facilities 40 2018-20122 180,000 Central District
Awareness based project Government Council
Project on aims at
Mortality and increasing
Morbidity awareness to
reduce
mortality and
morbidity at
facility level
through the
involvement of
males and all
local health
governance
structures

43
Programmes/ Brief Primary Target Implemen Financing Source of Lead
Project Title Profile/Descr Stakeholders/Bene Location tation Requiremen Financing Agency/
iption ficiaries Period ts Organizati
(MK ‘ 000) on
Procurement of The All Communities All health facilities 32 H/Fs 2018-2022 3,500,000 Central District
Essential programme Government Council
Medicine and aims at
Logistical procuring of
Management essential
Information medicine and
Systems (LMIS) enhancing the
enhancing Logistical
Project Management
Information
Systems
(LMIS) to track
drug supplies
so as to ensure
that the supply
chain is
uninterrupted
Health Centre The project All communities Chingale 3 2018-2023 18,000,000 Central District
Upgrading aims at Likangala Government Council
increasing Nasawa
access to health
care by
upgrading
health centres
to community
hospitals at
selected sites
Construction of The project All communities and Chamba (3) 18 2018-2023 342,000 Central District
Houses for aims at staff Machinjiri (3) Government Council
Health Personnel increasing the Chingale (2) and Partners
number of staff Zilindo (3) DDF
in health Mmambo (2) SEPF
facilities to Naisi (3)
manage cases Khanda (2)
with ease.

44
Table 7: Development Initiatives, Programmes and Projects under Limited Access to Potable Water and Improved Sanitation
Programmes/ Brief Primary Target Implementat Financing Source of Lead Agency/
Project Title Profile/Description Stakeholders/B Location ion Period Requireme Financing Organization
eneficiaries nts
(MK ‘ 000)
Rural Water The programme aims Communities Boma and 1 DWSSP 2018-2022 461,000 UNICEF District
Supply at providing portable selected Reviewed; 564 Save the Council
Programme water to communities ADCs boreholes Children
through construction constructed; 450 ADAPT
and maintenance of boreholes PLAN
water points, rehabilitated; 120 World
facilities and gravity- shallow wells Vision
fed schemes and also constructed; 3 water Emmanuel
reviewing the District schemes Internation
Water Supply and rehabilitated al
Sanitation Plan (Nkapita, Mwambo Malawi
(DWSSP) as a tool and Malemia) and 2 Red Cross
for water supply & water schemes CWIF
sanitation constructed CDF
management (Mlumbe and LDF
Chikowi) MDRP
MFERP
Capacity The project aims at Communities All ADCs 3003 committees 2017-2022 381,360 ADAPT, District
Building in building the capacity and structures; and 7 PLAN, Council
Operation and of district structures training sessions for World
Maintenance (DCT,AEC,WP ) and WUAs Vision,
WUAs on how to Emmanuel
operate and maintain Internation
facilities al,
UNICEF,
Malawi
Red Cross
and
Save the
Children;
AND

45
Programmes/ Brief Primary Target Implementat Financing Source of Lead Agency/
Project Title Profile/Description Stakeholders/B Location ion Period Requireme Financing Organization
eneficiaries nts
(MK ‘ 000)
District
Council
Community Aims at mobilizing Communities All ADCs 119 Communities 2017- 2022 95,200 World District
Sanitation and communities for Vision, Council
Hygiene action in water, Emmanuel
campaign sanitation and Internation
Project hygiene al,
UNICEF,
Malawi
Red Cross
and Save
the
Children

Table 8: Development Initiatives, Programmes and Projects under Poor Transport and Communication Infrastructure
Programme/ Brief Primary Location Target Implementation Financing Source of Lead Agency/
Project Title Profile/Descriptio Stakeholders/Be Period Requireme Financin Organization
n neficiaries nts g
(MK ‘ 000)
New Roads The programme Communities All ADCs 30 2017-2022 450,000 Local District
construction aims at Develop Council
constructing new ment
roads to improve Fund
accessibility within /Road
communities Funds/M
FERP/M
DRRP

46
Programme/ Brief Primary Location Target Implementation Financing Source of Lead Agency/
Project Title Profile/Descriptio Stakeholders/Be Period Requireme Financin Organization
n neficiaries nts g
(MK ‘ 000)
Thondwe- Aims at increasing Communities Connecting 37Km 2017-2022 17,000,000 Malawi District
Mayaka-Jali economic activity Thodwe, Governm Council
Road Upgrading by easing Mayaka and ent
to Bitumen transportation Jali
standard through
construction of a
tarmac road
connecting
Thondwe-Mayaka
and Jali
Roads The Programme Communities All ADCs 1500 2017-2022 950,000 Local District
Rehabilitation aims at Develop Council
rehabilitating ment
existing roads Fund
using labour /Road
intensive methods Funds/M
and other FERP/M
infrastructures. DRRP,M
This includes hand ASAF 4,
reshaping, ASWAP
gravelling and
grading
Bridge This aims at Communities All ADCs 10 2017-2022 5000,000 Local District
Construction constructing new Develop Council
concrete bridges ment
on roads and Fund
upgrading of all /Road
Timber Deck Funds/M
Bridges to concrete FERP/M
status DRRP

47
Programme/ Brief Primary Location Target Implementation Financing Source of Lead Agency/
Project Title Profile/Descriptio Stakeholders/Be Period Requireme Financin Organization
n neficiaries nts g
(MK ‘ 000)
Culverts and Aims at Communities All ADCs 700 lines 2017-2022 500,000 Local District
Other Road constructing Develop Council
Structures culverts, drifts, ment
Installation Irish bridges and Fund
other drainage /Road
structures on roads Funds/M
FERP/M
DRRP
Road Safety The program aims Road Users and Along all 50 Drivers 2017-2022 100,000 District District
Programme at providing communities major roads trained in Council Council
services that will defensive and
ensure safety of driving Partners
road users
including Kabaza 5 communities
operators and in accident
communities. The hotspots
activities will sensitized on
include laws against
identification and road reserve
management of encroachment
accident hotspots,
road safety 5 accident hot
trainings to staff, spots identified
campaigns and law and installed
enforcement with
against road infrastructure to
reserve control over
encroachment speeding

48
Programme/ Brief Primary Location Target Implementation Financing Source of Lead Agency/
Project Title Profile/Descriptio Stakeholders/Be Period Requireme Financin Organization
n neficiaries nts g
(MK ‘ 000)
Tele- Aims at Communities; Namadidi 4 2017-2022 200,000 District District
centres/Libraries constructing multi- Learners; and CDSS, Council Council
Construction purpose libraries Secondary Chimseu and
with tele – centres School Students Trading Partners
in selected trading Centre (T/C),
centres and public Ngwelero
institutions Trading
Centre and
Songani T/C
Community Aims at increasing Communities All ADCs 11 2017-2022 450,000 DDF, District
Electrification access to electricity (refer to MAREP Council
Programme/MA through MAREP MAREP and
REP sites) Partners
Procurement of Aims at procuring Communities Kachulu and 5 2019-2020 30,000 DDF and District
Lake Chilwa boats to ease Ngotangota Partners Council
Boats transport problems
across the lake
Capacity This is a training Road artisans All ADCs 500 2017-2022 10,000 Road District
Building for programme aiming Funds Council
Road Artisans at building the Administ
capacity of artisans ration,
in road and road MASAF4
infrastructure ,MFERP
construction and and
maintenance MDRRP
Capacity This is a training Youth All ADCs 500 2017- 2022 20,000 DDF, District
Building for programme aimed Entrepreneurs Malawi Council
ICT Technicians at training youth Parliame
entrepreneurs in nt and
ICT Partners

49
Programme/ Brief Primary Location Target Implementation Financing Source of Lead Agency/
Project Title Profile/Descriptio Stakeholders/Be Period Requireme Financin Organization
n neficiaries nts g
(MK ‘ 000)
Integrated The programme District All ADCs 10 2017-2022 5,000 District District
capacity aims are building development Council Council
building in the capacity of structures, and
social and implementers in the Construction Partners
environmental construction sector artisans and
safeguards in ESMP, gender, Project
disaster and Implementation
disability Committees
mainstreaming

Table 9: Development Initiatives, Programmes and Projects under High Poverty Levels
Programme/ Brief Primary Target Implementatio Financing Source Lead Agency/
Project Title Profile/Descriptio Stakeholders/B Location n Period Requiremen of Organization
n eneficiaries ts Financi
(MK ‘ 000) ng
Skills This programme The youth Sakata, Sakata, 2017-2022 130,000 Govern District Council
Development aims at Masaula, Masaula, ment
Programme establishing Chimwalira and Chimwalira and
community Ngwelero and Partners
colleges; (community Ngwelero
supporting youths college (community
with bursaries for establishment); college
technical and All ADCs establishment
vocational (Bursaries and ); 1,000
trainings and Intake) Bursaries
training the youth and 1440
in various intake
vocational skills to (120/year)
create employment
that will increase
household income
levels

50
Programme/ Brief Primary Target Implementatio Financing Source Lead Agency/
Project Title Profile/Descriptio Stakeholders/B Location n Period Requiremen of Organization
n eneficiaries ts Financi
(MK ‘ 000) ng
SMEs The programme Business All ADCs 50 2017-2022 420, 000 Govern Council and
Development and aims at providing Community, Cooperatives ment and Partners
Promotion business SMEs, Co- and Groups Partners
Programme management operatives, trained
trainings, COMSIP groups
Promotion of Co-
operatives and 1 Business
enhancing saving Incubation
culture and micro Centre
financing and established
establishing
business
incubation centre
Tourism Services The aim of the Business All ADCs 5% of 2017-2022 640,000 Govern District Council
Improvement and project is to communities workers in ment and
Development increase the Tour Operators the district Partners
programme performance of Guides,
employed in
and employment communitie and
by the tourism tourists the tourism
sector in the sector
district by
improving
accessibility to
tourist attraction
sites, training of
tour guides and
publicity of
tourism potential
sites including lake
Chilwa

51
Programme/ Brief Primary Target Implementatio Financing Source Lead Agency/
Project Title Profile/Descriptio Stakeholders/B Location n Period Requiremen of Organization
n eneficiaries ts Financi
(MK ‘ 000) ng
Social Support The project aims Food insecure All ADCs Public 2017-2022 9,100,000 Govern District Council
Programme at increasing households Works-5% of ment;
incomes of population; LDF and
vulnerable Ultra -poor Social Cash WFP,
households households Transfers-5% Save the
through public of the Children
works and cash population and
transfers other
partners

Markets The project aims at Market Vendors Mphyuphyu, 8 2017-2022 360,000 LGAP, District Council
Infrastructure constructing and Kachulu, SRBMP,
Improvement markets in selected Communities Namasalima PRIDE,
Programme sites to encourage Khonjeni, DDF,
business activities Nachikwangwa CDF,
in communities la, Chipini, Six and
Miles, and Partners
Naisi
Workplace Aim at inspecting Institutions All ADCs 120 2017-2022 60,000 Govern District Council
Inspection institutions to Employees Inspections ment and
Programme enforce Partners
compliance to
labour and
environmental
health related
regulations
Safe and Low Aims at The vulnerable All ADCs 250 2017 - 2022 1,500,000 Govern District Council
Cost Housing conducting ment and
Programme awareness meeting Partners
for construction of
safe housing and
providing loans for
low cost housing

52
Table 10: High Incidences of Gender Based Violations
Programme/ Brief Primary Target Implement Financing Source of Lead Agency/
Project Title Profile/Descri Stakeholders/Benefi Location ation Requiremen Financin Organization
ption ciaries Period ts g
(MK ‘ 000)
Prevention of The project Communities, women All ADCs 3 CVSUs 2017 - 2022 130,000 GoM, District Council
Gender Based aims at and children constructed; UNICEF,
Violations constructing NGO
CVSUs; 12
partners
building the Communitie
capacities of s sensitized
committees to on curbing
enhance child gender
and women based
protection; violations
raising
awareness on Chilwa
HIV and AIDs, Reformator
women and y School
child rights, needs
gender based assessment
violations; and conducted
conduct needs
assessment for
Chilwa
Reformatory
School

Table 11: Development Initiatives, Programmes and Projects under High Crime Rate
Programme/ Brief Primary Location Target Implement Financing Source of Lead Agency/
Project Title Profile/Descri Stakeholders/Benefi ation Requiremen Financing Organization
ption ciaries Period ts
(MK ‘ 000)
Construction and The programme Communities Police Unit 4 Police 2017-2022 205,000 Governme District Council
Rehabilitation of aims at Construction Units nt and
Police constructing [Nsondole Constructed; Developm
Infrastructure and Lambulira 5 Police
53
Programme/ Brief Primary Location Target Implement Financing Source of Lead Agency/
Project Title Profile/Descri Stakeholders/Benefi ation Requiremen Financing Organization
ption ciaries Period ts
(MK ‘ 000)
rehabilitating Namadidi; Units ent
police units and Namasalima, and Rehabilitated Partners
staff houses. Maera TA ; 6 Staff
Mwambo House
(Likangala)} constructed
Police Unit and 5 Staff
Rehabilitation House
[Kachulu,Sakata Rehabilitated
Chimwalira]
Staff House
Rehabilitation
[Chingale,
Thondwe, Mayaka,
Jali, Domasi, and
Chimwalira]
Staff House
construction
[Zomba, Jali,
Domasi, Thondwe
and Chingale]
Community The project Communities All ADCs 250 2017-2022 30,000 Governme District Council
Policing aims building community nt and
Structures the capacities policing Developm
Capacity of community structures ent
Building policing Partners
structures
Youth The programme Youth All ADCs 1 youth 2018-2022 270,000 Governme District Council
Development aims at entrepreneur nt and
Programme promoting ship hub Developm
youth established; ent
development 20 youth Partners
activities parliament
through fora
establishment organized;
of youth 150 youths
entrepreneurshi groups
54
Programme/ Brief Primary Location Target Implement Financing Source of Lead Agency/
Project Title Profile/Descri Stakeholders/Benefi ation Requiremen Financing Organization
ption ciaries Period ts
(MK ‘ 000)
p hub, youth trained in
parliament behavior
forums, youth change; 4
development/re youth
source centres resource/
and provision development
of sexual centres
reproductive established;
health trainings and 15
training
sessions on
Sexual
Reproductiv
e Health
conducted
Public Aims at Communities All ADCs 250 2017-2022 30,000 Governme District Council
Awareness on conducting nt and
Citizenship, public Developm
Birth and Death awareness on ent
Registration the need to Partners
register births,
deaths ID and
general
policing issues
Construction and The programme Communities New Court- 8 staff 2017-2022 57,000 Governme District Council
Rehabilitation of aims at Chingale, Staff houses; 1 nt and
Magistrate constructing Houses-Chingale, new court Developm
Courts and Staff magistrate Domasi, Likangala (Chingale); 1 ent
Houses courts and staff and Ntonya court Partners
houses rehabilitated
(Nsondole)
Prisoner The project Released Prisoners All ADCs 1 System 2017-2022 100,000 Council District Council
Tracking and aims at and Communities Developed and
Integration establishing a Partners
Project system with 300 Zomba
which to track based
55
Programme/ Brief Primary Location Target Implement Financing Source of Lead Agency/
Project Title Profile/Descri Stakeholders/Benefi ation Requiremen Financing Organization
ption ciaries Period ts
(MK ‘ 000)
released released
prisoners and prisoners
identify supported
interventions to
integrate
Zomba-based
ones into the
society
Prison The programme Communities Mphyupyu and 10 staff 2017-2022 200,000 Governme District Council
Infrastructure aims at Domasi houses nt and
and Staff Houses constructing Constructed Developm
Improvement prison cells ent
Programme blocks; staff 2 solar water Partners
houses and pumps
installing solar installed at
water pumps Mphyupyu

2 cell blocks
constructed

56
Table 12: Development Initiatives, Programmes and Projects under Weak Institutional Capacity for Effective Decentralised Service
Delivery
Programme/ Brief Primary Target Implement Financing Source of Lead Agency/
Project Title Profile/Descripti Stakeholders/Ben Location ation Requiremen Financin Organization
on eficiaries Period ts g
(MK)
Council Staff This Programme Council Staff Zomba District 17 Sectors 2018-2022 786,000 District District Council
Development aims at assessing Council assessed; Council
Programme the staff and
establishment for 1 staff Developm
the Council; Developme ent
formulating nt Plan Partners
Council Staff produced;
Development
250 staff
Plan and upgrade
trained in
skills of council
various
staff
programmes

Construction and Aims at Council Staff Health 1- Health 2017-2022 8,870,000 District District Council
Rehabilitation constructing and Administration Administrat Council
Council Offices rehabilitating Office Complex- ion Office and
and Staff Houses council offices Matawale; Fisheries Complex; 1 Developm
and staff houses Office (Boma) Fisheries ent
including those in Office; 10 Partners
health centres and DC office Complex EPA
EPAs Offices; 40
Various EPAs
staff houses
at EPAs

57
Programme/ Brief Primary Target Implement Financing Source of Lead Agency/
Project Title Profile/Descripti Stakeholders/Ben Location ation Requiremen Financin Organization
on eficiaries Period ts g
(MK)
Procurement of Aims at Council Staff Council 1 Coaster, 2 2017-2022 575,000 District District Council
Vehicles and equipping offices Lorries, 6 Council
Motor Cycles through Utility and
procurement of Vehicles Developm
motorcycles and and 75 ent
vehicles Motor Partners
Cycles

Governance and Aims at General Public All ADCs 12 ADCs 2017-2022 720,000 District District Council
Development delivering civic including participate Council
Project education to the Government in Capacity and
district at all employees, self- Building Developm
levels in employed, Sessions ent
governance and community every year Partners
development members, CSO
covering issues members, Faith
such as sectoral organization. This
policies and laws- targets every
on gender, citizen residing in
children, electoral Zomba
laws, human
rights, labour
related, health,
agriculture,
social, economic,
political services

58
Programme/ Brief Primary Target Implement Financing Source of Lead Agency/
Project Title Profile/Descripti Stakeholders/Ben Location ation Requiremen Financin Organization
on eficiaries Period ts g
(MK)
Revenue Aims at Revenue Officers Markets- Thondwe, 6 new 2017-2022 799,000 District District Council
Mobilization and establishing and Mayaka, Jali, markets Council
Enhancement rehabilitating Council Songani, Govala constructed and
Programme commercial and Matiya (Thondwe, Developm
Finance and
ventures; building Mayaka, ent
Development Bwaila Lodge
capacity of Jali, Partners
Committees
revenue Songani,
Lodge at Chingale
collection and Market Govala and
management staff Committees Bus depot at Jali Matiya); 1
and management Bwaila
committees in Vendors Stadium (Matiya Lodge; 1
revenue Chimwalira/Nasaw Bus Depot
mobilization General public a and Chingale) at Jali; 3
strategies in stadia
conducting Campaings in all
revenue markets Lodge at
mobilization Chingale
campaigns
20
committees
trained; and
25
campaigns
conducted

59
Programme/ Brief Primary Target Implement Financing Source of Lead Agency/
Project Title Profile/Descripti Stakeholders/Ben Location ation Requiremen Financin Organization
on eficiaries Period ts g
(MK)
Inter District Aims at Council and Council Establish 2017-2022 60,000 District District Council
Partnership establishing Communities Partnership Council
Project partnerships with with 3 and
District Councils councils Partners
within and within
outside Malawi to Malawi and
enhance learning 3 from
in local outside
government Malawi
management
Public Private Aims at Council Council 5 private 2017-2022 40,000 District District Council
Partnership identifying sector Council
Programme private sector Communities partners and
partners and identified Partners
engage them in and engaged
the in PPP
socioeconomic
development of
the Council
Website Aims at Council Council Website 2017-2022 50,000 District District Council
Development establishing and developed Council
Project maintaining a Communities and and
District Council regularly Partners
website updated

60
Table 13: Poor Development of Trading (Semi-Urban) Centres
Program/ Brief Primary Target Implement Financing Source of Lead Agency/
Project Title Profile/Descri Stakeholders/Benefi Location ation Requiremen Financin Organization
ption ciaries Period ts g
(MK)
Semi- Urban The Communities in the Mayaka, Chingale, 6 2018-2022 3,000,000 District District Council
Centres programme selected Semi-Urban Phyuphyu, Council
Development targets selected Centres Kachulu Thondwe and
Programme Semi-Urban and Jali Partners
Centres by
developing
plans
(structure, land
use and layout);
sensitizing
communities
on laws on
urban planning
and
development
plans; mapping
existing
services being
provided to
identify gaps;
upgrade roads
to all weather
standard and
provide and
provide water
and electricity

61
CHAPTER FOUR: RESOURCES FOR DISTRICT
DEVELOPMENT
Zomba District Council commits itself to undertaking a number of strategies which will enhance its
revenue collection capacity to finance this plan. These include establishing commercial ventures,
training relevant committees in revenue mobilization strategies, improving market infrastructures.
Therefore funding of this DPP will come from locally generated but also transfers from the central
government, the private sector and development partners. Below is an analysis of the investments

a. Analysis of Council Investments


The major sources of locally generated resources for the council include market fees, business
licensing; issuance of certificates and registration of institutions. The level of locally generated
resources has continued to improve since 2014/15 financial year reaching slightly over MK110
Million during the 2017/18 financial form less than MK70 million at the start of implementation of
the previous DDP . This upward trend is expected to continue during the implementation period of
this DDP. The council’s budget is currently at about MK9.6 Billion for both locally generated
resources (taxes and service charges) and central government transfers. Furthermore where applicable
the communities themselves will continue to provide own resources to projects in form of labour and
locally available material resources such as sand, bricks and quarry stones. The table below depicts
resource utilization for the 11 priority development issues with the health sector taking up close to
40% the resources. This is due to major construction projects planned for the next five years including
the upgrading of Domasi Community Hospital to a District Hospital.

Table 14: Resource Utilisation for the Development Priority Issues


Required Resources
Rank Development Outcome Percentage
(MK'000)
1 Improved food and nutrition security at household level 3,061,000 2.9
2 Improved environmental management 1,934,000 1.8
3 Increased literacy rate 7,229,500 6.8
4 Improved access to health care serviced 41,322,000 38.6
5 Increased access to potable water and improved sanitation 3,852,560 3.6
6 Improved transport and communication infrastructure 21,247,000 19.9
7 Reduced poverty levels 11,960,000 11.2
8 Reduced incidences of gender based violations 130,000 0.1
9 Reduced crime rate 582,000 0.5
Strengthened institutional capacity for effective decentralized
10 11,802,000 11.0
services delivery
11 Orderly development of trading (semi-urban) centres 3,000,000 2.8
Total 106,120,060 100

b. Private Investment Analysis


The areas identified for the private sector include agriculture, forestry, banking and credit facilities
tourism and fisheries. In agriculture sector, the private sector could develop agriculture estates or
engage in agro-processing and value addition. The private sector could also engage in offering

62
banking and credit facilities due to the fact that these services are currently unavailable in the rural
Zomba. There are also opportunities for the private sector to invest in the tourism sector as this sector
is currently underdeveloped. To fully exploit these potentials the private sector is expected to invest
a considerable amount of resources through public private partnerships (PPPs) or entirely by the
private sector itself.

c. Future Financial Projections:


The trend for the last five years indicates that the council’s revenue (locally generated and central
government transfers) has been growing by over 5% annually. This trend is expected to continue due
to revenue collection enhancement measures which have been lined up in this DDP. Therefore
councils’ revenues (locally generated and central government transfers) are projected at about MK53
billion. The contribution from project donations, non-organizations and donors, the private sector is
expected to finance the gap of about MK53 billion projected for the 5 year period. The future financial
projections are summarized in the table below.

Table 15: Summary of Future Financial Projections


Resource Requirement (MK‘000)
Development issue
Year 4
Year 1 (2017/18) Year 2 (2018/19) Year 3 (2019/20) Year 5 (2021/22)
(2020/21)
Improved food and
nutrition security at 369,500 465,500 611,000 725,000 890,000
household level;
Improved environmental
325000 377,000 363,000 406,000 463,000
management
Increased literacy rate; 948,025 1,206,200 1,350,425 1,663,650 2,061,200
Improved access to
8,519,400 8,569,400 8,669,400 8,419,400 7,144,400
health care serviced
Increased access to
potable water and 718760 783000 783600 779600 787600
improved sanitation
Improved transport and
communication 1,635,400 3,643,400 4,649,400 6,659,400 4,659,400
infrastructure
Reduced poverty levels 2,310,000 2,410,000 2,142,000 2,539,000 2,559,000
Reduced incidences of
25,000 25,000 26,000 26,000 28,000
gender based violations
Reduced crime rate; 74,000 98,000 124,000 127,000 159,000
Strengthened
institutional capacity for
1,055,000 1,950,000 2,641,000 3,241,000 2,915,000
effective decentralized
services delivery
Orderly development of
trading (semi-urban) 300,000 500,000 650,000 750,000 800,000
centres
Total Resources
16,280,085 20,027,500 22,009,825 25,336,050 22,466,600
Required Annually

63
Expected Revenue
Collections [Locally
Generated Resources
9,600,000 10,080,000 10,584,000 11,113,200 11,668,860
and Central Government
Transfers] at 5% Growth
rate
Financing Gap (To be
covered by the project
donations, non- 6,680,085 9,947,500 11,425,825 14,222,850 10,797,740
organizations, donors
and the private sector)

64
CHAPTER FIVE: DISTRICT ANNUAL INVESTMENT PPROGRAMME
This chapter presents the programmes and projects to be funded annually for the duration of the plan from 2017/18 to 2021/22 through
internal and external resources.
Table 16: Annual Investment Programme
Development Programme/Project Programme/Project Cost (MK ‘000) Source of Fund
Issue Title
Year 1 (2017/18) Year 2 Year 3 Year 4 Year 5 (2021/22)
(2018/19) (2019/20) (2020/21)
Food and nutrition Catchment and Land 15000 17500 50000 57500 60000 District Council,
insecurity and low Management NGOs and
income at Development
household level Partners
Promotion of Good 32500 50000 60000 72500 85000 District Council,
Agronomic Practices NGOs and
(GAP) Development
Partners
Livestock 67000 73000 90000 105000 125000 District Council,
Improvement Program NGOs and
Development
Partners
Integrated Crop Pests 20000 25000 35000 55000 65000 District Council,
and Diseases NGOs and
Management Development
Partners
Promotion of dietary 15000 20000 25000 40000 50000 District Council,
diversification, food NGOs and
preservation and Development
sustainable food
Partners
utilization
Establishment and 90000 100000 140000 170000 200000 District Council,
Rehabilitation of NGOs and
Irrigation Schemes
65
Development Programme/Project Programme/Project Cost (MK ‘000) Source of Fund
Issue Title
Year 1 (2017/18) Year 2 Year 3 Year 4 Year 5 (2021/22)
(2018/19) (2019/20) (2020/21)
Development
Partners
Establishment of 80000 100000 120000 125000 175000 District Council,
Agricultural Markets NGOs and
Development
Partners
Integrated Fish 50,000 80,000 91,000 100,000 130,000 District Council,
Farming NGOs and
Development
Partners
Loss of Afforestation and 40,000 40,000 50,000 60,000 90,000 District Council,
Biodiversity and Regeneration NGOs and
Environmental Programme Development
Degradation
Partners
Sustainable and 40,000 50,000 28,000 65,000 68,000 District Council,
Renewable Energy NGOs and
Project Development
Partners
Environmental 30,000 50,000 55,000 58,000 65,000 District Council,
Awareness and Action NGOs and
Planning Project Development
Partners
Sustainable Forests and 50,000 70,000 75,000 75,000 80,000 District Council,
Livelihoods Project NGOs and
Development
Partners
Environmental 20,000 15,0000 12,0000 8,0000 5,000 District Council,
management Bylaws NGOs and
Institutionalization
Project
66
Development Programme/Project Programme/Project Cost (MK ‘000) Source of Fund
Issue Title
Year 1 (2017/18) Year 2 Year 3 Year 4 Year 5 (2021/22)
(2018/19) (2019/20) (2020/21)
Development
Partners
Construction of 10,000 12,000 18,000 20,000 20,000 District Council,
Climate Change Centre NGOs and
(CCC) Development
Partners
Climate Change 15,000 20,000 15,000 10,000 15,000 District Council,
Adaptation and NGOs and
Mitigation Programme Development
Partners
Lake Chilwa Wetland 80,000 90,000 70,000 80,000 80,000 M-Crimes
and Catchment Department of
Management Project Water Resources
Save the
Children(ECHO)
Malawi Red
Cross (ECHO)
LEAD
Disaster Risk 20,000 15,000 20,000 15,000 20,000 M-Crimes
Management Dept. of
Programme Metrological
Services
Department of
Water Resources
Save the
Children(ECHO)
Malawi Red
Cross (ECHO)
and LEAD
Early Warning System 20,000 15,000 20,000 15,000 20,000
Program M-Crimes

67
Development Programme/Project Programme/Project Cost (MK ‘000) Source of Fund
Issue Title
Year 1 (2017/18) Year 2 Year 3 Year 4 Year 5 (2021/22)
(2018/19) (2019/20) (2020/21)
Dept. of
Metrological
Services
Department of
Water Resources
Save the
Children(ECHO)
Malawi Red
Cross (ECHO)
and LEAD
Poor Quality and Secondary School 50,000 150,000 200,000 200,000 150,000 District Council
Access to Construction Program & Development
Education Services Partners
Teaching and Learning 50,000 70,000 80,000 100,000 100,000 District Council
Materials Procurement & Development
Project Partners
Construction and 80,000 137,000 209,000 246,00 298,000 District Council
Maintenance of & Development
Classrooms and Partners
Teachers Houses for
Primary Schools
School Feeding 485,025 511,800 521,025 926,250 1,052,400 District Council
Programme & Development
Partners
Construction of 26,000 26,400 26,400 26,400 26,800 District Council
Resource Centre for & Development
Special Needs Partners
Education
Education Support 50,000 50,000 52,000 53,000 55,000 District Council
(Bursary) Project & Development
Partners

68
Development Programme/Project Programme/Project Cost (MK ‘000) Source of Fund
Issue Title
Year 1 (2017/18) Year 2 Year 3 Year 4 Year 5 (2021/22)
(2018/19) (2019/20) (2020/21)
Library Construction 8,000 9,000 12,000 12,000 14,000 District Council
& Development
Partners
Construction of latrines District Council
8,000 8,000 10,000 12,000 12,000 & Development
Partners
Bore hole sinking in District Council
schools 10,000 10,000 10,000 15, 000 15,000 & Development
Partners
School Desks District Council
Procurement 10,000 15,000 15,000 15,000 15,000 & Development
Partners
Teachers In-service- District Council
Training & Development
25,000 30,000 30,000 40,000 50,000
Partners
Capacity building for 36,000 36,000 36,000 37,000 50,000 District Council
School Management & Development
Committees Partners
Administration Offices 16,000 16,000 12,000 12,000 12,000 District Council
Construction & Development
Partners
Functional Literacy 10,000 15,000 20,000 25,000 30,000 District Council
Promotion Program & Development
Partners
Capacity Building for 40,000 540,000 60,000 70,000 80,000 GoM, UNICEF,
ECD and CBCCs NGO partners
Services
Construction of ECD 20,000 30,000 34,000 40,000 45,000 GoM, UNICEF,
resource centres and World Bank NGO
model centres partners

69
Development Programme/Project Programme/Project Cost (MK ‘000) Source of Fund
Issue Title
Year 1 (2017/18) Year 2 Year 3 Year 4 Year 5 (2021/22)
(2018/19) (2019/20) (2020/21)
Establishment of 16,000 30,000 34,000 40,000 45,000 GoM, UNICEF,
Children`s Corners World Bank,
NGO partners
Low access to Upgrading of Domasi 3,125,000 3,125,000 3,125,00 3,125,000 1,750,000 Central
health care services Community Hospital to 0 Government and
(high maternal and District Hospital Development
child mortality Partners
rates) Health Centre 700,000 700,000 700,000 700,000 700,000 Central
Construction Government and
Development
Partners
Maternity Wing 350,000 350,000 350,000 District Council
construction
Health Facility 36,000 36,000 36,000 36,000 36,000 District Council
Rehabilitation
Health Centre 3,600,000 3,600,000 3,600,00 3,600,000 3,600,000 Central
upgrading 0 Government

Construction of Under- 54,000 54,000 54,000 54,000 54,000 Central


five Clinics Government
Facility Based 36,000 36,000 36,000 36,000 36,000 Partners and
Awareness Project on Central Govt
Mortality and
Morbidity
Procurement of 550,000 600,000 700,000 800,000 900,000 Central Govt
Essential Medicine and
Logistical Management
Information Systems
(LMIS) enhancing
Project

70
Development Programme/Project Programme/Project Cost (MK ‘000) Source of Fund
Issue Title
Year 1 (2017/18) Year 2 Year 3 Year 4 Year 5 (2021/22)
(2018/19) (2019/20) (2020/21)
Construction of Houses 68,400 68,400 68,400 68,400 68,400 Central
for Health Personnel government
Limited access to Rural Water Supply 630,000 691,000 682,000 678,000 686,000 UNICEF
potable water and Programme Save the Children
improved sanitation ADAPT PLAN
World Vision
Emmanuel
International
Malawi Red
Cross, CWIF,
CDF , LDF,
MDRP; and
MFERP
Capacity Building in 69,720 72,960 82,560 82,560 82,560 ADAPT PLAN
Borehole Operation Project, World
and Maintenance Vision,
programme Emmanuel
International,
UNICEF, Malawi
Red Cross, Save
the Children
Community Sanitation 19,040 19,040 19,040 19,040 19,040 World Vision,
and Hygiene Campaign Emmanuel
Project International,
UNICE, Malawi
Red Cross, Save
the Children
Poor transport and New roads construction 90,000 90,000 90,000 90,000 90,000 Local
communication Development
infrastructure Fund /Road
Funds/MFERP/M
DRRP
71
Development Programme/Project Programme/Project Cost (MK ‘000) Source of Fund
Issue Title
Year 1 (2017/18) Year 2 Year 3 Year 4 Year 5 (2021/22)
(2018/19) (2019/20) (2020/21)
Thondwe-Mayaka-Jali 1,000,000 3,000,000 4,000,00 6,000,000 4,000,000 Malawi
Road Upgrading to 0 Government
Bitumen standard
Roads Rehabilitation 190,000 190,000 190,000 190,000 190,000 Local
Development
Fund /Road
Funds/MFERP/M
DRRP
Bridge Construction 100,000 100,000 100,000 100,000 100,000 Local
Development
Fund /Road
Funds/MFERP/M
DRRP
Culverts and Other 100,000 100,000 100,000 100,000 100,000 Local
Road Structures Development
Installation Fund /Road
Funds/MFERP/M
DRRP
Road Safety 6,000 14,000 20,000 30,000 30,000 Local
Programme Development
Fund /Road
Funds/MFERP/M
DRRP
Tele- centres/Libraries 50,000 50,000 50,000 50,000 50,000 Malawi
Construction Government
Community 90,000 90,000 90,000 90,000 90,000 Malawi
Electrification Government
Programme/MAREP
Procurement of Lake 6,000 6,000 6,000 6,000 6,000 District Council
Chilwa Boats and Partners
Capacity building for 2,000 2,000 2,000 2,000 2,000 Road Funds
road artisans Administration

72
Development Programme/Project Programme/Project Cost (MK ‘000) Source of Fund
Issue Title
Year 1 (2017/18) Year 2 Year 3 Year 4 Year 5 (2021/22)
(2018/19) (2019/20) (2020/21)
Capacity building for 400 400 400 400 400 District Council
ICT technicians and Partners
Integrated capacity 1,000 1,000 1,000 1,000 1,000 District Council
building in social and and Partners
environmental
safeguards
High Poverty Skills Development 15,000 20,000 25,000 35,000 35,000 District Council
Levels Programme and Partners
SMEs Development 50,000 70,000 80,000 100,000 120,000 District Council
and Promotion and Partners
Programme

Tourism Services 115,000 120,000 125,000 140,000 140,000 District Council


Improvement and and Partners
Development
programme
Social Support 1,800,000 1,800,000 1,800,00 1,840,000 1,860,000 District Council
Programme 0 and Partners

Market Infrastructure 70,000 90,000 90,000 90,000 70,000 District Council


Improvement Program and Partners
Workplace Inspection 10,000 10,000 12,000 14,000 14,000 District Council
Programme and Partners
Safe and Low Cost 250,000 300,000 10,000 320,000 320,000 District Council
Housing Project and Partners
High Incidences of Prevention of Gender 25,000 25,000 26,000 26,000 28,000 GoM, UNICEF,
Gender Based Based Violations NGO partners
Violations
High Crime Rate Construction and 35,000 40,000 45,000 50,000 60,000 Council and
Rehabilitation of Police Partners
Infrastructure
including staff houses

73
Development Programme/Project Programme/Project Cost (MK ‘000) Source of Fund
Issue Title
Year 1 (2017/18) Year 2 Year 3 Year 4 Year 5 (2021/22)
(2018/19) (2019/20) (2020/21)
Youth Development 40,000 50,000 50,000 60,000 70,000 Council and
Programme Partners

Community Policing 3,000 4,000 5,000 6,000 7,000 Council and


Structures Capacity Partners
Building
Public awareness on 3,000 4,000 5,000 6,000 7,000 Council and
citizenship, birth and Partners
death registration
Construction and 3,000 10,000 14,000 - - Council and
Rehabilitation of Partners
Magistrate Court and
staff Houses
Prisoner Tracking and 15,000 15,000 20,000 20,000 30,000 Council and
Integration Project Partners

Prison Infrastructure 20,000 30,000 40,000 50,000 60,000 Council and


Improvement Partners
Programme
Weak Institutional Council Staff 50,000 100,000 160,000 208,000 250,000 Council and
Capacity for Development Partners
Effective Programme
Decentralized
Construction and 800,000 1500,000 2,000,00 2,480,000 2,000,000 Council and
Services Delivery
Rehabilitation of 0 Partners
Offices and Staff
Houses Project
(Including New DCs
Office Complex)
Procurement of 70,000 100,000 125,000 130,000 150,000 Council and
Vehicles and Motor Partners
Cycles

74
Development Programme/Project Programme/Project Cost (MK ‘000) Source of Fund
Issue Title
Year 1 (2017/18) Year 2 Year 3 Year 4 Year 5 (2021/22)
(2018/19) (2019/20) (2020/21)
Governance and 50,000 100,000 150,000 190,000 230,000 Council and
Development Project Partners
Revenue Mobilization 60,000 120,000 171,000 208,000 250,000 Council and
and Enhancement Partners
Programme
Inter District 10,000 10,000 10,000 10,000 20,000 Council and
Partnership Project Partners
Public Private 5,000 5,000 10,000 10,000 10,000 Council and
Partnership Programme Partners
Website Project 10,000 15,000 15,000 5,000 5.000 Council and
Partners
Poor Development Semi-Urban Centres 300,000 500,000 650,000 750,000 800,000 Council and
of Trading (Semi – Development Partners
Urban) Centres Programme

75
CHAPTER SIX: MONITORING AND EVALUATION
Zomba District Development Plan aims at facilitating coordinated delivery of development in the district
during the period 2017 to 2022. To ensure efficient and effective implementation of the planned programs
and projects, a monitoring and evaluation framework has been developed which will guide all stakeholders
in tracking and measuring progress. This framework is presented in annex II. It is intended to generate
useful information for decision making and enhance accountability regarding the implementation of the
planned interventions. It will therefore provide early warning information on the progress being made
toward the targets so that where applicable, corrective actions can timely be taken.

6.1 Levels of Monitoring and Evaluation

To ascertain whether the implementation is being done properly and whether the proposed yearly targets
are being met, monitoring and evaluation will therefore be undertaken at various levels and by different
stakeholders. At the community level, the Village Development Committees, Area Development
Committees, and other actors will undertake monitoring and evaluation. At this level, communities through
project implementation committees (PIC) will develop M&E plans based on the Village Action Plans
(VAPs) which will be used to track progress. At district level, monitoring and evaluation of this DDP will
be undertaken according to annual action plans presented in table 18 below. Quarterly and monthly reports
on each programme/project shall be prepared by the District Monitoring and Evaluation Office and
submitted to relevant stakeholders. During the implementation period, line ministries particularly the
Ministry of Local Government and Rural Development (MoLGRD) will also undertake monitoring and
evaluation of implementation of this DDP.

76
Table 17: Annual M&E Plan
Code Activity Monitoring Expected Sources of Annual Quarter 1 Quarter 2 Quarter 3 Quarter 4
Indicator output Data target

July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June
1 M&E Number of Quarterly Reports 4
quarterly meetings M & E
review conducted activities
Meetings discussed
2 M&E Number of annual M Report 1
Annual meetings & E
review conducted activities
Meetings discussed
3 Conduct Number of Results Minutes 6
M&E M&E and or
coordination coordination agreement
meetings meetings made in
conducted 6 the
meeting
4 Sectoral data Data data sets Data 12
collection collection generated Collection
sessions Tools
5 Produce Number of Reports Data bank, 4
M&E reports produced LAHARS,
quarterly produced DEMIS,
reports HMIS

77
6.2 Monitoring and Evaluation Capacity Building

Cognizance of the problems that rocked the monitoring and evaluation process of the previous DPPs, The
district through the Monitoring and Evaluation Office will embark on building capacities for M&E at all
levels. This will include providing equipment and trainings in M&E in all sectors and communities. This
will ensure that quality and accurate data will be generated by the district M&E system.

6.3 Participation of Actors in Monitoring and Evaluation

To ensure ownership and sustainability of the interventions, all actors will take part in the monitoring and
evaluation of the implementation of the projects and programmes. The roles and responsibilities of the
stakeholders in DDP M&E process are clearly defined in table 17 below.

Table 18: Roles and Responsibilities of Actors in the DDP Process


Actor Roles and Responsibilities
Department of Local Government - Conduct regular monitoring visits together with relevant
planning bodies
- Convenes quarterly and annual review meetings in
conjunction relevant bodies
District Council - Acts on recommendations of District Executive Committee
- Submits physical and financial progress report and work plan
- Informs DEC of feedback from national
District Executive Committee - Discusses Physical and Financial Progress Report and Work
Plan
- Provides recommendations
DPD and DAT - Consolidate analyses, and submits physical and financial
progress report and work plan to DEC
- Conduct M&E of VDCs and ADCs
Accounts Office - Prepares and forwards Financial Reports to DPD, DAT and
DAT
ADC - Prepares physical and financial progress report and work plan
based on VDC community monitoring report
VDC - Consolidates and submits community monitoring report to
DPD

6.4 Indicators, Data Collection, Analysis and Reporting

The effectiveness of the district’s M&E system in providing correct and accurate feedback on
implementation progress and results highly depends on the setting of realistic and correct indicators,
accuracy of data collection and reporting. Annex I (Result Matrix) provides the district’s performance
indicators (outcome and output indicators) that will be monitored and evaluated for the period 2017 to 2022.
78
It is important to note that most of these indicators are in the district data base and the district is already
reporting on most of them. These indicators are also linked to the government programme based budget
(PBB). These performance indicators therefore form the basis for the district’s M&E framework (Annex I).
The defined output indicators in the annex dictate the required type of data and information that will be
collected across all the identified development issues in this DDP. The frequency for the data collection is
also defined in the annex. As this DDP is gender sensitive, sex disaggregated data collection and
compilation will be collected where appropriate to enhance gender equality assessment across all the
sectors. The monitoring and evaluation will be undertaken using tools recommended by the MoLGRD. The
Director of Planning and Development (DPD) through the M&E Office will be in charge of collecting and
analyzing data from all sectors. This will be done hand in hand with other district officials and professionals.
A sector focal point person will be in charge of data collection and progress monitoring at sector level.
Deliberate efforts will be made to utilize in the district’s monitoring and evaluation system other
stakeholders particularly the Non-Governmental Organizations which are active in the district. In liaison
with the District Monitoring and Evaluation Office, every development actor will ensure that activities in
the area of its operation are being implemented, monitored and evaluated accordingly. Quarterly and annual
meetings with the District Council will also be carried out to review the progress being made. Complete list
of M&E activities are indicated in table 18 below. To assess the district performance (impact) towards the
achievement of priorities outlined in this DDP, two evaluations will be conducted (mid and end of term
evaluations). In response to information requirements from all stakeholders- the district will also ensure
timely sharing of its reports and other key decisions to stakeholders through available channels including
community meetings, stakeholders meetings and official writing amongst others. The rationale of effective
information sharing is to enhance ownership of the projects, credibility of the district and a sense of
accountability to stakeholders.

79
CHAPTER SEVEN: CONCLUSION
The Zomba District Development Plan is a tool aimed at guiding planning, implementation and coordination
of development interventions in the district throughout the five year period from 2017 to 2022. Through a
highly participatory process involving communities and other development actors in Zomba District, the
following 11 development priority issues were identified: food and nutrition insecurity at household level;
loss of biodiversity and environmental degradation; high illiteracy rate; high maternal and infant mortality
rates; limited access to potable water and improved sanitation; poor transport and communication
infrastructure; high poverty levels; high incidences of gender based violations; high crime rate; weak
institutional capacity for effective decentralized service delivery; and poor development of trading (semi-
urban) centres. These will be at the centre of development programming in the district until the expiry of
this plan in 2022. The major causes of these development problems were carefully analysed and strategies
were developed to address the issues. Appropriate interventions, programmes and projects were therefore
developed to address these issues. Major projects in this plan include the following: Upgrading of Thondwe-
Mayaka-Jali Road to Bitumen Standard; Construction and Maintenance of Classrooms and Teachers House
for Primary Schools; School Feeding Programme; Construction and Rehabilitation of Irrigation Schemes;
Afforestation and Regeneration Programme; Upgrading of Domasi Community Hospital to a District
Hospital; Secondary Schools Construction; Construction and Rehabilitation of Council Offices; and Semi-
Urban Centres Development Programme. Successful implementation of all the proposed interventions,
programmes and projects is estimated to cost about MK 106 billion over the five year period. About 50
percent of this will come from locally generated resources and central government transfers while the rest
is expected to come from project donations, Non- governmental Organizations, donors and the private
sector.

In order to properly track implementation of the interventions, programmes and projects, the monitoring
and evaluation framework outline in this plan will be followed. All monitoring and evaluation will therefore
be guided by this framework. This is expected to generate necessary information to inform decision making
relating to the outlined interventions, programmes and projects.

80
ANNEXES
Annex I: Result Matrix
Development Issue No 1: Food and Nutrition Insecurity at Household Level
Outcome: Increased Agricultural Productivity and Production
Outcome Indicator: To increase the proportion of food secure households from 87% to 95% by 2022
Programme/Project Objectively
Name Verifiable Targets
\ Indicators Baseline MOV Frequency Responsibility
Output Indicators
2017/18 2018/19 2019/20 2020/21 2021/22
Catchment and Land Area under 1500 1700 1900 2100 2300 2500 Annual Annual Land Resources
Management sustainable land Report Department
and water
management (Ha)
[CAADP indicator]
Promotion of Good Number of 3rd Round 3 times in Agricultural
Agronomic Practices farmers using Agricultural a year Planning, Crop
(GAP) improved seeds Production (Jan, and Livestock
Estimates March & Departments
Survey June)
Report
Maize Seed 109866 120852 126346 137333 142823 366219
Groundnuts 12450 13695 14318 15563 16185 18675
Common Beans 9120 10032 10488 11400 11856 13680
Soya 6321 6953 7269 7901 8217 9482
Rice 573 630 659 716 745 860
Yield (Kg/Ha) 3rd Round 3 times in Agricultural
Agricultural a year Planning, Crop
Production (Jan, and Livestock
Estimates March & Departments
Survey June)
Report
Groundnut Yield 635 1099 1538 2153 2368 2500
(kg/Ha)
Rice Yield 1692 2000 2500 3000 3500 4000
(Kg/Ha)
81
Development Issue No 1: Food and Nutrition Insecurity at Household Level
Outcome: Increased Agricultural Productivity and Production
Outcome Indicator: To increase the proportion of food secure households from 87% to 95% by 2022
Programme/Project Objectively
Name Verifiable Targets
\ Indicators Baseline MOV Frequency Responsibility
Output Indicators
2017/18 2018/19 2019/20 2020/21 2021/22
Maize Yield 1766 2000 3000 4500 6000 7000
(Kg/ha)
Pigeon Peas 926 1000 1300 1500 1700 2000
Yield (Kg/Ha)
Beans Yield 438 750 1000 1500 1900 2200
(Kg/Ha)
Soya (Kg/Ha) 482 700 1100 1700 2000 2500
Establishment of Number of Market 62 64 67 70 73 76
Agriculture Produce Established
Markets
Promotion of Dietary Number of 106,000 120,000 150,000 185,000 210,000 250,000 Specialised Annual District Nutrition
diversification, food households M&E study Office
preservation and meeting 6-food reports
sustainable food group minimum
utilisation dietary
diversification
requirement
Establishment and Area under 2191 2200 2400 2600 2800 3000 Annual
Rehabilitation of irrigation (ha) Annual DADO
Reports
Irrigation Schemes
Number of Schemes 4 9 14 19 24 29 Annual
Rehabilitated Annual DADO
Reports
Number of Schemes 362 363 364 365 365 367 Annual
Established Annual DADO
Reports
Integrated Fish Capture fisheries 1,500 2,000 2,20 0 2,200 2,300 2400 Annual District Fisheries
Farming (MT)
Annual
Reports Office
Aquaculture (MT) 1,000 1,200 1,500 1800 1900 2000
Livestock Reports Semi- (Livestock
Improvement Livestock mortality
rates reduced annually Department)
Programme
82
Development Issue No 1: Food and Nutrition Insecurity at Household Level
Outcome: Increased Agricultural Productivity and Production
Outcome Indicator: To increase the proportion of food secure households from 87% to 95% by 2022
Programme/Project Objectively
Name Verifiable Targets
\ Indicators Baseline MOV Frequency Responsibility
Output Indicators
2017/18 2018/19 2019/20 2020/21 2021/22
Chicken 30 28 24 20 15 10
Pigs 28 24 18 16 12 8
Cattle 10 8 6 5 4 3
Number of
Livestock
Chicken stock 981390 1001018 1021038 1041459 1062288 1083534
Goats stock 274916 280414 286023 291743 297578 303529
Pigs stock 162569 167446 172469 177644 182973 188462
Beef Cattle stock 23917 25113 26368 27687 29071 30525
Dairy cattle 1713 1816 1925 2040 2163 2292
Sheep 30801 31109 31420 31734 32052 32372
Number of dip 11 - 1 1 1 -
tanks established
Number of dip 0 2 2 2 1 -
tanks maintained
Integrated Crop Pests % infestation of AEDOs &
and Disease Annual
maize crop by 23% 19% 16% 15% 13% 10%
Reports
Annual AEDCs (Crops
Management FAW reduced Department)

83
Development Issue No 2: Loss of Biodiversity and Environmental Degradation
Outcome: Reduce loss of biodiversity and environmental degradation
Programme/Project Objectively
Name Verifiable Targets
Baseline
Indicators
and MOV Frequency Responsibility
(Year)
Output Indicators
2017/18 2018/19 2019/20 2020/21 2021/22
Afforestation and Number of 1,500,000 2,000,000 2,500,000 3,000,000 3,500,000 Reports annual DFO
seedlings planted 2,006,621
Regeneration
Programme per year
Number of 9790 10,000 10210 10420 10630 Reports Annual DFO
additional hectares
under regeneration
Sustainable and Number of ADCs 2 2 2 2 3 3 Training Annual EDO
Renewable Energy trained in efficient Reports
Project technologies
promoted
Environmental Number of ADCs 2 2 2 2 3 3 Training Annual EDO
Awareness and reached with Reports
Action Planning environment and
Programme natural resource
management
massages
Number of district 0 - 1 - 1 - DSOER Biannual EDO
State of
environment and
outlook reports
prepared
Number of District 0 - 1 - - - DEAP Every Five EDO
Environmental Years
Action Plans
formulated
Sustainable Forests Number of 0 2 2 2 3 3 Reports Annual EDO/DFO
and Livelihoods communities/ADCs
Project trained in
implementation
forest based
enterprises and
IGAs
Environmental Number of 3 2 2 2 3 3 Reports Annual EDO
Management communities/ADCs
with bylaws on
84
Development Issue No 2: Loss of Biodiversity and Environmental Degradation
Outcome: Reduce loss of biodiversity and environmental degradation
Programme/Project Objectively
Name Verifiable Targets
Baseline
Indicators
and MOV Frequency Responsibility
(Year)
Output Indicators
2017/18 2018/19 2019/20 2020/21 2021/22
Bylaws environmental
Institutionalization protection
Project
Construction of Number of Centres 0 - 1 - - Reports Annual EDO
Climate Change established and
Centre (CCC) operationalised
Climate Change Percentage of 47 45 42 40 39 37 IHS Annual EDO/NSO
Adaptation and population
Mitigation vulnerable to the
Programme impacts of drought
and floods, poor
rains and lodging
Lake Chilwa Number of 0 1 1 1 1 2 Reports Annual EDO/DFO
Wetland and catchment areas
Catchment protected
Management
Project
Disaster Risk Number of civil 0 20 20 20 29 30 Reports Annual EDO
Management protection
Programme committees trained
in DRM
Number of hazard 0 20 20 20 29 30 Reports Annual EDO
maps produced
Number of DRM 0 - 1 - - - Reports Annual EDO
Plans
Number of 0 - 1 1 1 - Reports Annual EDO
evacuation centres
established
Number rain gauges 10 7 7 7 7 8 Reports Annual EDO
installed

85
Development Issue No 2: Loss of Biodiversity and Environmental Degradation
Outcome: Reduce loss of biodiversity and environmental degradation
Programme/Project Objectively
Name Verifiable Targets
Baseline
Indicators
and MOV Frequency Responsibility
(Year)
Output Indicators
2017/18 2018/19 2019/20 2020/21 2021/22
Early Warning Number of rivers 0 3 3 3 3 5 Reports Annual EDO
System installed with
Programme Rivers gauges

Number of VCPCs 0 5 5 5 5 5 Reports Annual EDO


( gauge readers)
trained in
community based
early warning
system

Development Issue No 3: High Illiteracy levels


Outcome: Improved Quality of and Access to Education Services
Outcome Indicator: I To increase literacy levels from 69.4 % to75% by 2022
Project /Programme Objectively Verifiable
Indicators Targets
Baseline 2017/18 2018/19 2019/20 2020/21 2021/22 MOV Frequency Responsibility
Output Indicators

Secondary School Number of community 36 1 1 1 1 1


Construction Program day secondary schools EMIS Annual DEMISO
constructed
Teaching and 200 200 200 200 200 200
No of schools supported
Learning Materials every year
EMIS Annual DEMISO
Procurement Project
Construction and Number of class rooms 1503 30 30 30 30 30
Maintenance of Class EMIS Annual DEMISO
constructed/maintained
Rooms and Teachers 596 5 5 5 5 5
Number of teachers
Houses for Primary houses constructed
EMIS Annual DEMISO
and Secondary
Schools Pupil permanent
147 145 142 140 138 135 EMIS Annual DEMISO
classroom ratio (Primary)
86
Development Issue No 3: High Illiteracy levels
Outcome: Improved Quality of and Access to Education Services
Outcome Indicator: I To increase literacy levels from 69.4 % to75% by 2022
Project /Programme Objectively Verifiable
Indicators Targets
Baseline 2017/18 2018/19 2019/20 2020/21 2021/22 MOV Frequency Responsibility
Output Indicators

School Feeding Number of schools 94 111 122 131 138 149


Programme benefiting from the EMIS Annual DEMISO
programme
Construction of 5 1 2 2 3 4
Resource Centre for Number of Resource
Reports Annual DEMISO
Special Needs Centres Constructed
Education
Education Support Number of secondary
(Bursary) programme school students provided 45 80 80 80 80 80 EMIS Annual DEMISO
with bursary each year
District Education
0 - 1 - - - Reports Annual District Council
Support Fund Established
Library construction No of Libraries
3 4 4 3 3 3 EMIS Annual DEMISO
constructed
Construction of
latrines Pupil toilet ratio 100:1 95:1 92 87:1 82:1 80:1 EMIS Annual DEMISO

Bore hole sinking in


schools No of borehole drilled 183 4 4 4 3 2 EMIS Annual DEMISO

School desks
Procurement No of Desks procured 12248 300 300 300 240 180 EMIS Annual DEMISO

Teachers In-service-
No of Teachers trained 3219 3219 3219 3219 3219 3219 EMIS Annual DEMISO
Training
No of committee
2023 2023 2023 2023 2023 2023 EMIS Annual DEMISO
Capacity building for members trained
School Management % of schools with
Committees functional Governance 55 60 65 70 80 90 EMIS Annual DEMISO
Structures ( SMC, PTA)
Administration No of Admin blocks
21 4 4 3 3 3 EMIS Annual DEMISO
offices construction constructed

87
Development Issue No 3: High Illiteracy levels
Outcome: Improved Quality of and Access to Education Services
Outcome Indicator: I To increase literacy levels from 69.4 % to75% by 2022
Project /Programme Objectively Verifiable
Indicators Targets
Baseline 2017/18 2018/19 2019/20 2020/21 2021/22 MOV Frequency Responsibility
Output Indicators

Functional Literacy
Promotion Program Number of Campaigns 0 12 12 12 12 12 Reports Annual District Council

Capacity Building for Number of Caregivers


ECD and CBCCs Trained, deployed and 2490 360 360 360 360 360 Reports Annual District Council
Services provided with Honoraria
Number of Partners District Council
6 2 2 2 2 2 Reports Annual
Lobbied
Construction of ECD District Council
Number of Resource
resource centres and Centres
0 2 2 2 2 3 Reports Annual
model centres
Number of Model District Council
0 1 2 2 2 2 Reports Annual
Centres
Establishment of Number of Children’s District Council
Children`s Corners 3 2 2 2 2 3 Reports Annual
Corners Established

Development Issue No 4: High Maternal and Infant Mortality Rates


Outcome: Improved Quality and Provision of Health care Services
Outcome Indicator: Reduce maternal and infant mortality rates respectively from 675/100000 and 75/1000 to 645/100000 and
55/1000 by 2022
Project /Programme Objectively Verifiable Baseline MOV Frequen Responsibilit
Indicators and Targets cy y
(Year)
Output Indicators
2017/18 2018/19 2019/20 2020/21 2021/22
Upgrading of Domasi District Hospital 0 0 0 0 0 1 Progress Reports Quarter DHSS
Community Hospital to Constructed
ly
District Hospital

88
Development Issue No 4: High Maternal and Infant Mortality Rates
Outcome: Improved Quality and Provision of Health care Services
Outcome Indicator: Reduce maternal and infant mortality rates respectively from 675/100000 and 75/1000 to 645/100000 and
55/1000 by 2022
Project /Programme Objectively Verifiable Baseline MOV Frequen Responsibilit
Indicators and Targets cy y
(Year)
Output Indicators
2017/18 2018/19 2019/20 2020/21 2021/22
Community Hospital Number of community 0 0 0 1 0 0 Progress Reports Quarter DHSS
Construction hospitals constructed
ly
Construction of Number of Maternity 22 1 1 1 0 0 Progress Reports Quarter DHSS
Maternity Wings Wings Constructed
ly
Health Centres Number of Health 0 1 1 1 1 1 Progress Reports Quarter DHSS
Rehabilitation Centres Rehabilitated
ly
Programme
Construction of Under- Number of Under-five 87 1 3 3 2 2 Quarter DHSS
five Clinics Clinics Constructed Progress Reports
ly
Facility Based Number of Awareness 0 8 8 8 8 8 Progress Reports Quarter DHSS
Awareness Project on sessions conducted
ly
Mortality and Morbidity
Number of Health facilities 9 9 20 40 40 40 HAC Minutes, Monthly DHSS
conducting EHP and MNH
DHMT Minutes,
Progress Reports
Procurement of Essential Number of Drug stock outs 9 0 0 0 0 0 DTC Minutes, Monthly DHSS
Medicine and Logistical days
LMIS Reports,
Management
Information Systems HMIS Reports
(LMIS) enhancing
Project
Health Centre Number of Health 0 1 1 2 1 1 Progress Reports Quarter DHSS
Upgrading Programme Centres Upgraded
ly

89
Development Issue No 4: High Maternal and Infant Mortality Rates
Outcome: Improved Quality and Provision of Health care Services
Outcome Indicator: Reduce maternal and infant mortality rates respectively from 675/100000 and 75/1000 to 645/100000 and
55/1000 by 2022
Project /Programme Objectively Verifiable Baseline MOV Frequen Responsibilit
Indicators and Targets cy y
(Year)
Output Indicators
2017/18 2018/19 2019/20 2020/21 2021/22
Construction of Houses Number of Staff Houses 79 3 3 6 4 2 Progress Reports Quarter DHSS
for Health Personnel Constructed for Health
ly
Personnel

Development Issue No 5: Limited Access to Potable Water and Improved Sanitation


Outcome: Increased access to potable water and improved sanitation
Outcome Indicator: To increase the proportion of households with access to improved water source and improved sanitation from 83%
to 95% and 47.3 to 55% respectively by 2022.
Project /Program Objectively Verifiable Baseline MOV Frequency Responsibility
Indicators and Targets
(Year)
Output Indicators
2017/18 2018/19 2019/20 2020/21 2021/22
Rural Water Supply 0 - 1 - - - Reports Annually District Water
Programme Development
DWSSP Reviewed
Officer

Number of boreholes 275 90 90 90 90 90 Reports Monthly District Water


maintained Development
Officer
Number of taps maintained 1106 346 360 400 463 490 Reports Monthly District Water
Development
Officer
Number of boreholes 346 108 114 114 114 114 Reports Monthly District Water
constructed Development
Officer

90
Development Issue No 5: Limited Access to Potable Water and Improved Sanitation
Outcome: Increased access to potable water and improved sanitation
Outcome Indicator: To increase the proportion of households with access to improved water source and improved sanitation from 83%
to 95% and 47.3 to 55% respectively by 2022.
Project /Program Objectively Verifiable Baseline MOV Frequency Responsibility
Indicators and Targets
(Year)
Output Indicators
2017/18 2018/19 2019/20 2020/21 2021/22
Number of Shallow wells 112 24 24 24 24 Reports Monthly District Water
constructed Development
24 Officer
Number of taps 422 127 139 156 168 Reports Monthly District Water
Constructed 172 Development
Officer
Number of existing 1 1 1 1 0 0 Reports Monthly District Water
Gravity Fed Schemes Development
rehabilitated Officer

Number of Gravity Fed 7 1 1 0 0 0 Reports Monthly District Water


Schemes Constructed Development
Officer
Capacity building in Number water point 1727 531 558 638 638 638 Reports Monthly District Water
water infrastructure committees formed and Development
trained Officer
Operation and Number of Water Users 7 1 1 0 0 0 Reports Monthly District Water
Maintenance Associations formed and Development
programme trained Officer
22 32 12 12 12 12 Reports Monthly District Water
Number of Area Mechanic
Development
identified and trained
Officer
Community Sanitation Number of communities 22 32 12 12 12 12 Reports Monthly District Water
and Hygiene campaigns mobilised/trained for Development
action in water, sanitation Officer
Project
and hygiene

91
Development Issue No 6: Poor Transport and Communication Infrastructure
Outcome: To improve transport and communication infrastructure
Project /Program Objectively Verifiable Baseline MOV Frequency Responsibility
Indicators and Targets
(Year)
Output Indicators
2017/18 2018/19 2019/20 2020/21 2021/22
New Roads construction 189. 6 20 20 20 20 Monthly
Number of km Monthly Director of
20 Progress
constructed Public Works
Reports
Thondwe-Mayaka-Jali 0 - 10 10 17 0 Monthly
Number of Km Monthly Director of
Road Upgrading to Progress
Constructed Public Works
Bitumen standard Reports
Roads Rehabilitation 170 300 300 300 300 300 Monthly
Number of roads Monthly Director of
Progress
rehabilitated every year Public Works
Reports
Bridge construction 2 4 4 4 4 4 Monthly
Number of Bridges Monthly Director of
Progress
Constructed Every Year Public Works
Reports
Culverts (other road Number of 70 140 140 140 140 140
Monthly
structures) Installation Culverts/drainage Monthly Director of
Progress
structures constructed Public Works
Reports
every year
Tele- centres/Libraries Number of 3 1 1 1 1 Monthly
Monthly Director of
construction Telecentre/Libraries Progress
Public Works
constructed Reports
Road Safety Programme Number of accident hot 0 1 1 1 1 1 Progress
spots installed with Reports Annual District Council
infrastructure to regulate
over speeding
Number of council Staff 0 5 10 10 10 15 Progress District Council
trained in defensive Reports Annual
driving
Number of communities 0 1 1 1 1 1 Progress District Council
in accident hotspots Reports
sensitized on laws on Annual
road reserve and
encroachment

92
Development Issue No 6: Poor Transport and Communication Infrastructure
Outcome: To improve transport and communication infrastructure
Project /Program Objectively Verifiable Baseline MOV Frequency Responsibility
Indicators and Targets
(Year)
Output Indicators
2017/18 2018/19 2019/20 2020/21 2021/22
Community Number of areas 39 2 2 2 2 3 Monthly
Monthly Director of
Electrification connected with Progress
Public Works
Programme/MAREP electricity Reports
Procure Lake Chilwa 2 1 1 1 1 1 Monthly
Number of boats Monthly Director of
boats Progress
procured Public Works
Reports
Capacity building for 0 100 100 100 100 100 Monthly
Number of artisans Monthly Director of
road artisans Progress
trained Public Works
Reports
Capacity building for 0 100 100 100 100 100 Monthly
Number of ICT Monthly Director of
ICT technicians Progress
technicians trained Public Works
Reports
Integrated capacity 48 2 2 2 2 2
Monthly
building in social and Number of Monthly Director of
Progress
environmental implementers trained Public Works
Reports
safeguards

Development Issue No 7: High Poverty Levels


Outcome: Increased Household Income Levels
Outcome Indicator: Reduce the proportion of households perceived very poor by self from 58.3% to 50% by 2022
Project /Program Objectively Verifiable Baseline MOV Frequency Responsibility
Indicators and Targets
(Year)
Output Indicators
2017/18 2018/19 2019/20 2020/21 2021/22
Skills Development Number of youths trained 70 120 120 120 120 120 Reports Annual Council
Program in vocational, livelihoods
and technical skills
Number of Technical 4 - 1 1 1 1 Reports Annual Council
Colleges established

93
Development Issue No 7: High Poverty Levels
Outcome: Increased Household Income Levels
Outcome Indicator: Reduce the proportion of households perceived very poor by self from 58.3% to 50% by 2022
Project /Program Objectively Verifiable Baseline MOV Frequency Responsibility
Indicators and Targets
(Year)
Output Indicators
2017/18 2018/19 2019/20 2020/21 2021/22
Number of youths in 0 200 200 200 200 200 Reports Annual Council
formal technical and
vocational institutions
accessing support
(Bursary)
SMEs Development and Number of Cooperatives 3 5 10 10 12 13 Reports Annual BPO
Promotion program established and Trained in
Business Management
Number of rural industries 0 1 1 1 1 1 Reports Annual BPO
and processing units
established
Number of new 12 30 40 50 60 70 Reports Annual BPO
cooperatives registered
Number of cooperatives 7 15 15 30 40 50 Reports Annual BPO
linked to markets and large
scale enterprises (B2B
linkages)
Number of SMEs 25 50 60 70 80 90 Reports Annual BPO
accessing business support
services
Number of business 40 100 120 140 150 160 Reports Annual BPO
premises inspected to
verify licenses
Incubation Centre 0 - - 1 - - Reports Annual BPO
Constructed
Tourism Services % of Workers Employed in 1 2 3 3 4 5 WMS Every 3 NSO
Improvement and the Tourism Sector Years
Development programme
Social Protection Percentage of population
Programme on Social Protection
Program

94
Development Issue No 7: High Poverty Levels
Outcome: Increased Household Income Levels
Outcome Indicator: Reduce the proportion of households perceived very poor by self from 58.3% to 50% by 2022
Project /Program Objectively Verifiable Baseline MOV Frequency Responsibility
Indicators and Targets
(Year)
Output Indicators
2017/18 2018/19 2019/20 2020/21 2021/22
MASAF public works 10.2 9 8.5 7 6 5 IHS Every Five NSO
Years
Cash/food for work 8.5 8 7.5 7 6 5 IHS Every Five NSO
Years
Establishment of New Number of Markets 46 6 8 8 8 8 District Council
Reports Annual
Markets Established
Safe and Low Cost Number of Beneficiaries 305 50 50 50 50 50 District Council
Reports Annual
Housing Project

Development Issue No 8: High Incidences of Gender Based Violations


Outcome: Improved Quality and Provision of Health care Services
Outcome Indicator: To reduce percentage of women who experience physical violence from 45.1 to 40% by 2022
Project /Program Objectively Verifiable Baseline MOV Frequency Responsibility
Indicators and Targets
(Year)
Output Indicators
2017/18 2018/19 2019/20 2020/21 2021/22
Prevention of Gender Number of Committees 0 2 2 2 3 3 Reports Annual District Council
Based Violations trained in child and women
Programme protection and gender
based violations
Number of CVSUs 0 - 1 1 1 - Reports Annual District Council
constructed and equipped

95
Development Issue No 9: High Incidences of Crime
Outcome: Reduced Incidences of Crime
Outcome Indicator Target: Reduce crime rate from 25% to 15% by 2022
Project /Programme Objectively Verifiable Baseline MOV Frequency Responsibility
Indicators and Targets
(Year)
Output Indicators
2017/18 2018/19 2019/20 2020/21 2021/22
Police Infrastructure Number of Police Units - Reports Annual District Council
14 - 1 1 1
Construction and Established
Rehabilitation - Reports Annual District Council
Number of Police Units 1 2 1 1
Programme 0
rehabilitated
Number of Police staff 2 Reports Annual District Council
0 - - 2 2
house constructed
Number of Police Staff 1 Reports Annual District Council
0 1 1 1 1
House Rehabilitated
Community Policing Number of Community 15 30 40 50 60 70 Reports Annual District Council
Structures Capacity Police Forums Trained and
Building Equipped
Youth Development Youth entrepreneurship 0 - - 1 - - Reports Annual District Council
Programme hub established
Youth parliament fora 0 4 4 4 4 4 Reports Annual District Council
organized
Training sessions on 0 3 3 3 3 3 Reports Annual District Council
Sexual Reproductive
Health organised
Youths groups trained in 0 30 30 30 30 30 Reports Annual District Council
behavior change
Youth resource/ 00 - 1 1 1 1 Reports Annual District Council
development centres
established

96
Development Issue No 9: High Incidences of Crime
Outcome: Reduced Incidences of Crime
Outcome Indicator Target: Reduce crime rate from 25% to 15% by 2022
Project /Programme Objectively Verifiable Baseline MOV Frequency Responsibility
Indicators and Targets
(Year)
Output Indicators
2017/18 2018/19 2019/20 2020/21 2021/22
Public awareness on Number of birth 700 1000 2000 3000 4000 5000 Reports Annual District Council
citizenship, birth and certificates issued
death registration Number of death 30 50 50 70 80 100 Reports Annual District Council
certificates issued
Construction of Magistrate Court 9 - - 1 - 1 Reports Annual District Council
Magistrate Courts and Construction
Staff Houses programme 3 - 2 2 2 2 Reports Annual District Council
Magistrate Court staff
houses constructed
Released Prisoner Released Prisoner 0 - 1 - - - Reports Annual District Council
Tracking and Integration Tracking System
Project Developed
Number of Zomba – 0 60 60 60 60 60 Reports Annual District Council
Based Released
Prisoners Assisted
Prison Infrastructure Prison cell blocks 35 - 1 1 - - Reports Annual District Council
Improvement Construction
programme Solar water pump 0 - 1 1 - - Reports Annual District Council
installed
Prison Staff Houses - - 2 2 2 4 Reports Annual District Council
Construction

97
Development Issue No 10: Weak Institutional Capacity for Effective Decentralized Service Delivery
Outcome: Strengthen institutional capacity for effective decentralized services delivery
Project /Program Objectively Verifiable Baseline and MOV Frequency Responsibility
Indicators (Year) Targets

Output Indicators
2017/18 2018/19 2019/20 2020/21 2021/22
Council Staff Number of Sectors 0 5 7 5 - - HR Annual Human Resource
Development Program assessed
Reports
Staff Development Plan 0 - 1 - - - HR Annual Human Resource
formulated and
Reports
implemented
Number of Council Staff - 20 50 50 50 80 HR Annual Human Resource
Upgrading their Skills
Reports
Construction and Number of Offices - 1 2 2 3 4 Reports Annual DPW
Rehabilitation of rehabilitated/constructed
Offices and Staff Number of staff houses - 5 7 9 9 10 Reports Annual DPW
Houses Project Rehabilitated/constructed
(Including new DCs
office complex) New DCs office Complex 0 - - - 1 - Reports Annual DPW
Constructed
Procurement of Number of motor - 1 2 3 2 12 Reports Annual Council
Vehicles and Motor vehicles procured
Cycles Number of motor - 15 15 15 15 15 Reports Annual Council
cycles procured
Governance and Number of ADCs - 12 12 12 12 12 Reports Annual Council
Development Project sensitised on governance
and development issues
Revenue Mobilization Number of commercial - 2 2 2 2 3 Reports Annual Council
and Enhancement ventures established
Programme Number of staff trained - 50 50 50 50 50 Reports Annual DOF
in Revenue
Mobilization strategies

98
Development Issue No 10: Weak Institutional Capacity for Effective Decentralized Service Delivery
Outcome: Strengthen institutional capacity for effective decentralized services delivery
Project /Program Objectively Verifiable Baseline and MOV Frequency Responsibility
Indicators (Year) Targets

Output Indicators
2017/18 2018/19 2019/20 2020/21 2021/22
Percentage increase in 5 10 20 30 40 50 Reports Annual DOF
locally generated
revenues
Number of Revenue 30 50 60 70 80 100 Reports Annual DOF
Officers trained
Number of market 25 46 50 55 60 65 Reports Annual DOF
committees trained in
revenue mobilization
strategies
Inter District Number of Inter-district 0 1 2 1 1 1 Reports Annual District Council
Partnership Project Partnerships
Established
Public Private Number of PPP 0 1 2 3 - - Reports Annual District Council
Partnership Programme
Website Website Established 0 1 - - - Reports Annual District Council
and Operational

99
Development Issue No11: Poor Development of Trading (Semi-urban) Centres
Outcome: Orderly Physical Development of Trading (semi- urban) Centres
Project /Program Objectively Verifiable Baseline MOV Frequency Responsibility
Indicators and Targets
(Year)
Output Indicators
2017/18 2018/19 2019/20 2020/21 2021/22
Semi-Urban Centres Number of urban 0 1 2 3 4 6 Reports Annual District Council
Development centres sensitized on
Programme urban planning and
development laws
Number of urban Centres 0 1 2 3 4 6 Reports Annual District Council
with physical development
Plans
Number of structure 0 1 2 3 4 6 Reports Annual District Council
plans produced
Number of land use 0 1 2 3 4 6 Reports Annual District Council
plans produced
Number of layout plans 0 1 2 3 4 6 Reports Annual District Council
produced
Number of urban Centres 0 1 2 3 4 6 Reports Annual District Council
with mapping of
integrated socio-
economic Services
Number of urban Centres 0 1 2 3 4 6 Reports Annual District Council
with Access to Electricity
Number of urban Centres 0 1 2 3 4 6 Reports Annual District Council
with Water Supply
Number of Semi-Urban 0 1 2 3 4 6 Reports Annual District Council
centres with modern
Markets

100
Annex 2: Area Development Plans

1. Chikowi ADC

A. Profile

Name of Group Mlambe, Nambaiko, Matunduzi, Kachere, M’bawa, Mlira, Nkhwazi, Mphero, Pondiya, Mphetembe 1&2, Chakalamba, Kachere,
Villages Milepa, Makungula Muluwira
Population Age Group Male Female Total

0 - 59 Months 1114 1207 2321


6 - 14 Years 4010 4344 8354
15 - 64 10693 11584 22277
65 +
6460 6998 13457
Grand Total 46 409
Governance Traditional Leader: T/A Nkagula with 11 GVHs Political Leadership: The area has one counselor (Limbani Machilika)
and one MP (Abu Naliwa)
Social Economic Available Services
Characteristics

Health The area have 1 Heath Centre, 1 Clinical Officer, 5 Nurses and 26 HAS

Education The area has 14 Primary Schools and 1Private Secondary School

Water Nkagula has 207 boreholes and 92 taps of water from Water Users Association. Out of the 207
boreholes ,48 are not functioning

Roads

Environment Rainfall Statistics This area normally experiences adequate rainfall which results in bumper yields

Soils

Vegetation

101
Rivers

Livelihood Employment Opportunity People in this area have no access to employment opportunities

Markets The area has no market

Food Security

Year Total Farm Families Families without Food % Farm Families Without Food

2012/13 24,608 718 3

2013/14 24,608 321 1

2014/15 24,569 634 3

2015/16 23,261 3424 15

2016/17 25,196 252 1

102
B. Consolidated Village Action Plans

Initiativ Initiativ Estimated Fundin


Ran Initiative Beneficiarie e Start e End Cost Own g Gap
k Name of Initiative Objectives Sector Location s Date Date ('000) Resources ('000)
1 Afforestation Project To reduce Forest All VDCs 46409 18-Jan 18-Dec 1,400 Hoes, Seeds,
environmental Nurseries and
degradation Land
2 Construction of School Blocks and To improve Education Nkagula School 2018 2022 Bricks and
Teachers Houses access to ADC Going 3,000,000 Sand
quality and Children and
equitable Teachers
education
3 Construction of Health Centre To increase Health Nkagula All Villages 2018 2022 Bricks and
access to ADC 2,000,000 Sand
health care
services
4 Construction of Agricultural Markets Improve access STA All Villages
to agriculture Nkagula
markets
5 Capacity Building on Manure To increase All VDCs 46 409 2018 2022 Own Labour
Making/Conservation Agriculture crop yields
6 Child Protection Awareness To reduce Gender Nkagula Children, 2018 2022 Participation
Campaigns incidence of ADC Women and
child abuse; boys
7 Establishment of Police Unit To reduce Police STA All villages 2018 2022 Sand, Labour
crime rate Nkagula and Bricks
8 Construction of Bridges and Culverts To improve Public All 2018 2020 Sand, Trees,
transportation Works Villages and stones
9 Capacity Building for Governance To increase Local STA All 2018 2020 Participation
structures (ADCs, VDCs, AECs) efficiency and Government Nkagula structures
effectiveness
in delivery of
development
10 Gender Mainstreaming and Capacity To increase Social All Women and 2018 2020 Participation
Building Project women and welfare & Villages Youths
youth Youth
participation in
development

103
2. Mkumbira 1 and 2 ADCs

A. Profile

Name of Group Tchuka, Chigwere, Makoka, Sonkho, Mphambara Mkotamo, Chitedze, Chiyenda, Mkumbira, Suzi Thiya, Maluwa,
Villages Gunda, Khumali Mthumbu, Chikhasu, Tchilima, Tchelero

Population Age Group Male Female Total

0 - 59 Months 213 312 525


6 - 14 Years 449 609 1058
15 - 64 516 670 1186
65 +
63 83 146
Grand Total 2915
Governance Traditional Leadership: VDC, ADC, AEC are still Political Leadership:
operating
Social Economic Available Services
Characteristics

Health Centres Available Chisi Health Centre

Education

Water

Roads

Environment Rainfall Statistics

YEAR Average Amount of Rainfall Average Rain Days


October – April

2012/13 939.05 41

104
2013/14 657.7 40

2014/15 1224.7 37

2015/16 168.2 10

2016/17 700.7 59

Markets

Food Security

105
B. Consolidated Village Action Plans (Mkumbira 1)

Rank Name of Initiative Initiative Sector Location Beneficiaries Initiative Initiative Estimated Own Funding
Objectives Start End Date Cost Resources Gap
Date ('000) ('000)

1 Drilling and Maintenance of To increase Water Namalele, 46409 2018 18-Dec 22,000 Bricks,
Boreholes access to Frank,Mboloma, January Sand and
Portable Water Ng'ombe, Uzingo, Stones
Malewa, Thom,
Kumpini, Chisoni
and Mpambichi
2 Construction of Shallow Ng'ombe, Uzingo, Fishermen, 2018 2020 32,000
Wells Malewa Thom, Villagers, January December
Kumpini, Chisoni, Pupils,
Mpambichi, Teachers and
HSAs
3 Construction of School Blocks To improve Education Ng'ombe, Uzingo, School 2020 2022 June 193,750 Bricks,
and Teachers Houses access to quality Malewa Thom, Pupils April Sand and
and equitable Kumpini, Chisoni, Stones
education Mpambichi,
4 Provision of Learning and Ngotangota, School 2020 2022 June
Teaching Materials to Primary Pupils, April
Schools Teachers
5 Construction of Nursery To increase Education Uzingo, Ng'ombe, Children 2021 Jan 2021 April 1,500 Bricks, 1,125
Schools access to early Malewa Sand and
child education Stones

6 Recruitment and Posting of To reduce pupil- Education Chinguma Pupils 2018 2018 Feb
Teachers to Primary Schools teacher ratio Ngotangota January
Chisoni
7 Construction of Health To increase Health Namalere The whole 2019 Jan Dec-19 50, 000 Bricks, 37, 500
Centers access to health ADC Sand and
care Stones
8 Recruitment and Posting of Health Chinguma All Villages 2019 Jan 2019 Feb
Clinical Officers to Health Ngotangota
Centres Chisoni

106
Rank Name of Initiative Initiative Sector Location Beneficiaries Initiative Initiative Estimated Own Funding
Objectives Start End Date Cost Resources Gap
Date ('000) ('000)

9 Construction of Roads and To improve Public Mpambichi, Motorist, 2018 2018 April 10,000 Bricks, 9,000
Bridges transport and Works Chinguma, Cyclist, Mar Sand and
Communication Ngotangota, Pedestrians Stones
Lungadzi,Ngomba
10 Establish Agriculture Markets To improve Trade Ngotangota Farmers 2019 Jan 2019 Mar 4,000 Bricks, 3,000
access to Sand and
agricultural Stones
Markets
11 Establishment of Police Unit To reduce crime Home Ngotangota Teachers, 2019 Jan 2019 Feb 2,000 Bricks, 1,500
rate Affairs Fishers, Sand and
HSAs, Stones
Villagers
12 Rural Electrification Project To increase Public Chisoni All ADC 2020 Jan 2020 Dec 10,000 Poles 7,500
access to Works
electricity
13 Afforestation Project To reduce Forest Namalere,Malewa, whole ADC 2018 Jan 2018 Feb 1,000 Seedlings 675
environmental Mpambichi,
degradation Thom, Uzingo,
Frank, Chisoni

C. Mkumbira 2 ADC

B. Consolidated Village Action Plans

Rank Name of Initiative Initiative Sector Location Beneficiaries Initiative Initiative Estimated Own Funding
Objectives Start End Cost Resources Gap
Date Date ('000) ('000)

1 Drilling of Boreholes To increase Water Khumali, Fishermen, 2018 2018 10,000 Bricks, 500
access to Maluwa, Villagers, June NOV Sand and
Portable Tchilima, Pupils, Stones
Water Thiya Teachers,
HSAs,

107
Rank Name of Initiative Initiative Sector Location Beneficiaries Initiative Initiative Estimated Own Funding
Objectives Start End Cost Resources Gap
Date Date ('000) ('000)

2 Maintenance of Boreholes Makoka, Fishermen, 2020 2020 Sep 300 Bricks, 75


Khumali, Villagers, April Sand and
Maluwa Pupils, Stones
Teachers,
HSAs
3 Construction of School Blocks To improve Education Mkumbira selected 2021 Jan 2021 Dec 2-4 Bricks,
and Teachers Houses access to pupils Billion Sand and
quality and Stones
4 Provision of Learning and equitable Muluma, pupils 2022 2022Aug 1,100 Bricks, 706
Teaching Materials to Primary education Chisi Mar Sand and
Schools Stones
5 Recruitment and Posting of To increase Health Chisi Health All Villages 2018 2018 March
Clinical Officers to Health Centres access to Centre January
health care

6 Afforestation Project To reduce Forest Khumali, All Villages 2018 2022 800 600
environmental Mphambala, January Nov
degradation Gunda hills,
Chilundu
hill,
Tchilima,
Mbirikwi,
Mkumbira,
Mkotamo,
Maluwa,
Tchuka,
Thiya,
7 Capacity Building on Manure To increase Agriculture Gunda and Farmers 2018 2019 1,000 750
Making crop yields Tchuka Aug Mar

8 Provision Agricultural Extension To increase Agriculture Chisi Island Farmers 2018 Jan 2018 Feb
Services crop and
animal yields

108
Rank Name of Initiative Initiative Sector Location Beneficiaries Initiative Initiative Estimated Own Funding
Objectives Start End Cost Resources Gap
Date Date ('000) ('000)

9 Establishment of Agriculture To improve Trade Maluwa Farmers Jan-18 2022 Feb 1,800 Bricks, 1,425
Market access to Sand and
agricultural Stones
Markets

10 Establishment of Dip tank and To increase Agriculture Chisi Island Farmers 2018 2019 Feb 1,300 Bricks, 975
Deployment of Veterinary animal and Gunda January Sand and
Extension Worker productivity Stones

11 Afforestation of Lake Banks To reduce Forest Namakwanda Fish traders & 2018 2018 Oct 2,600 Bricks, 650
Project environmental & Muluma Fish Mar Sand and
degradation beaches processors Stones

4. Kuntumanji ADC

A. Profile

Name of Group Namasalima(13 Villages), Namadingo(15 Villages), Kumbwani(20 Villages), Luwambwe (15 Villages), Lundu (9 Villages), Ndumba
Villages (10 Villages), Bimbi (10 Villages)

Population Age Group Male Female Total

0 - 59 Months 3641 3631 7272


6 - 14 Years 6002 5829 11831
15 - 64 8054 10005 18059
65 +
2175 2471 4646
Grand Total 41808

Governance Traditional Leadership: This area is experiencing chieftaincy Political Leadership: There is weak relationship/coordination among
wrangles. VDCs and ADCs are not trained. Handling of counselors, ADC and MPs resulting into poor project implementation,

109
development is issues top-down from the chiefs with limited
room for community input

Social Economic Available Services


Characteristics

Health Long distances to health centres; Health centres are understaffed; Poor referral Services (there is
no ambulance). More cases of Malaria; High drug stock outs

Education The area has Kumbwani lundu namasalima and Bimbi primary schools; Secondary schools at
Kumbwani needs hostels; Schools at sanga, namitoso, Namasalima,Chilanga, Nsondole ,
Namadingo and Bimbi need refurbishment; The area is experiencing high school dropout rate
due to early marriage and ganyu; High teachers absenteeism and late reporting for work due to
absence of teachers’ houses at the schools (they reside at Songani or Jokala)

Water A lot of boreholes need to be maintained in the area; Ndumba and Namasalima need to be
trained on O&M OF water points; Most of the rivers in the area are dry and experience siltation
flooding

Roads: Most roads need culverts; Namasalima-Bimbi road requires gravelling

Environment Rainfall Statistics:

Year Average Amount Rainfall from Average Rain Days


October- May

2012/13 1126.4 54

2013/14 818.8 57

2014/15 1127.93 45

2015/16 569.9 29

2016/17 660.1 39

110
Soils Sandy loam, clay soil and loam sandy soils; Soil fertility decline due to soil erosion and poor
methods of farming

Vegetation The area is experiencing deforestation and bush fires

Rivers Most rivers become dry during summer due to siltation/deforestation

Livelihood Employment Opportunity Some inhabitants of the area practice farming, ganyu, and fishing. Other are engaged in small
scale businesses

Markets No market for fam produce

Food Security Situation for ADC Low agriculture production due to climate change; few extension workers; the area needs a deep
tank; and equipment for irrigation for large scale agriculture

Year Total Farm Families Families without Food % Farm Families without
Food

2012/13 24,608 718 3

2013/14 24,608 321 1

2014/15 24,569 634 3

2015/16 23,261 1930 8

2016/17 25196 557 2

B. Consolidated Village Action Plans

Rank Name of Initiative Initiative Sector Location Beneficiaries Initiative Initiative Estimated Own Funding
Objectives Start End Cost Resources Gap
Date Date ('000) ('000)

1 Capacity Building for To increase Local Govt Namasalima, ADC, VDC 2018 44743 650 Venue 260
Governance structures efficiency and Namadingo, JUNE
(ADCs, VDCs, AECs) effectiveness in Luwambwe,

111
Rank Name of Initiative Initiative Sector Location Beneficiaries Initiative Initiative Estimated Own Funding
Objectives Start End Cost Resources Gap
Date Date ('000) ('000)

delivery of Ndumba, Lundu,


development Bimbi

2 Borehole Drilling & To increase Water Lundu, Namadingo, communities 2018 2022 72,000 Bricks, 18,000
Maintenance access to LuwambweNdumba, June July Sand and
Portable Water Bimbi Stones

3 Installation of water pipes Water Lundu, Namadingo, communities 2018 2022 250 62 .5
LuwambweNdumba, June July
Bimbi

4 Construction and To improve Public Lundu, Namadingo, communities 2018 2022 92,000 Bricks,
Maintenance of Roads, transport and Works LuwambweNdumba, June July Sand and
Culverts and Bridges Communication Bimbi Stones

5 Establishment of Irrigation To improve Agriculture Lundu, Namadingo, communities 2018 2019 15,000 15,000
Schemes food security LuwambweNdumba, Aug Mar
Bimbi

6 Making of Dykes Agriculture Namasalima area communities 2018 2020 5,000 Labour 5,000

7 Establishment of Dip tank To increase Agriculture Namasalima and communities 2020 2022 5,000 Bricks, 2,500
and Deployment of animal Lundu Sand and
Veterinary Extension Worker productivity Stones

8 Establishment of Police Unit To reduce crime Home Ndumba, Kumbwani communities 2018 2022 15,000 Bricks, 3,750
rate Affairs and Namasalima Aug July Sand and
Stones

9 Construction of School To improve Education Lundu, Namadingo, All Learners 2018 Sep 2022 170,000 Bricks, 87,500
Blocks and Teachers Houses access to quality LuwambweNdumba, around T/A July Sand and
and equitable Bimbi Kumtumanji Stones
education

112
Rank Name of Initiative Initiative Sector Location Beneficiaries Initiative Initiative Estimated Own Funding
Objectives Start End Cost Resources Gap
Date Date ('000) ('000)

10 Construction of Under Five Reduce infant Health Lundu, Luwambwe, T/A 10-Jul 2022 15,000
Clinic Shelters mortality rate and Namasalima Kumtumanji

5. Malemia ADC

A. Profile

Name of GroupVillages Mtwiche, machinjiri, Minama, Ntogolo, Chopi, Kasonga, Masambuka, Mpezeni, Kapyepye, Chisutu, Mlima and Chitenjere.

Population Age Group Male Female Total

0-59 Months
6-14 Years
15-64 Years
65+ Years
Grand Total

Governance Traditional Leader: TA Malemia Political Leadership: The area has1 MP and 2 Councilors

Social Economic Available Services


Characteristics

Health The area has Health posts and health Centre as follows: Chamba Health Centre, Pirimiti Mission
Hospital, Matawale Health Centre, Matiya Health Centre and Likangala Health Centre

Education

Water The major sources of safe water in the area are Boreholes and Protected wells. However, most
boreholes are no longer functioning due to lack of maintenance.

Roads The road network in the area is composed of feeder and earth roads

113
Environment Rainfall Statistics: The average rainfall in an area is 1000mm per year

Year Average Amount Rainfall Average Rain Days


(mm) from October- April

2012/13 1366 45

2013/14 1102.3 62

2014/15 1362.83 56

2015/16 624.4 47

2016/17 880.5 58

Soils The area is experiencing decline in soil fertility due to water run-off. The area has loam soils

Vegetation The area has a number of forests reserves. Some belong to the community while others are
private. The hills in this area are bare due to deforestation

Rivers The area has some rivers that are suitable for irrigation and fish farming including Likangala,
and Njala

Livelihood Employment Opportunity The area has some people who are employed in government sectors of Health, Education and
Agriculture, while others are involved in self-employment like Kabadza, Beer brewing, Farming
(irrigation and fish farming) and other small scale businesses.

Markets The area has access to 8 major markets as follows: Govala, Pyupyu, Kachulu, Jali, Sunuzi,
Gomani, Namikango, and Matiya

Food Security Situation for The area has been experiencing food insecurity for some years.
ADC

Year Total Farm Families Families without Food % Farm Families without
Food

2012/13 22919 350 2

114
2013/14 22919 281 1

2014/15 25057 507 2

2015/16 23394 2807 12

2016/17 23744 293 1

B. Consolidated Village Action Plans

Rank Name of Initiative Initiative Sector Location Beneficiaries Initiativ Initiativ Estimate Own Fundin
Objectives e Start e End d Cost Resourc g Gap
Date Date ('000) es ('000)

1 Construction of Health To improve Health Kasonga and Minama Communities 2018 2022 Bricks,
Centre and Provision of access to Sand and
Health Personnel health care Quarry
Stone
2 Provision of Ambulance Health Msambuka Communities 2018 2022 Bricks,
and Ambulance Bicycles Sand and
Skilled
Labour
3 Construction of Rubbish To improve Health Chopi, Mtogolo, Ntwiche and Communities 2018 2022 Hoes,
Pits in All Health Centres sanitation Machinjiri Picks and
Labour
Force
4 Construction of Under- To reduce Health Mpezeni Communities 2018 2022 Bricks,
five Clinic infant River
mortality Sand and
Labour
force
5 Provision of Adequate To improve Health All Health Centres in TA Communities 2018 2022
Staff and Adequate access to Malemia
Medicine to Clinics health care
6 Rehabilitation of To Promote Agriculture Msambaisa in GVH Minama Surrounding 2018 2022 Bricks,
Nsambaisa Scheme Food Security Communities River

115
Rank Name of Initiative Initiative Sector Location Beneficiaries Initiativ Initiativ Estimate Own Fundin
Objectives e Start e End d Cost Resourc g Gap
Date Date ('000) es ('000)

Sand and
Quarry
Stone
7 Construction of Malonje To Promote Agriculture Malonje(GVH Chopi), Surrounding 2018 2022 Bricks,
Irrigation Schemes Food Security Tikondame, Khwirikhwiri, Communities River
Mulinda and Makungula Sand and
(GVH Machinjiri), Quarry
Stone
and
Labour
force
8 Rehabilitation of Rivers To Mitigate Forestry GVH'S Chopi, Mtogolo, Surrounding 2018 2022 seedlings Pangas,
and Hills impact of Ntwiche and Machinjiri, Communities , Slashes
climate Kapyepye, Minama, Kasonga , Hoes
change
9 Afforestation Project: To Mitigate Forestry Chopi, Mtogolo, Ntwiche and Surrounding 2018 2022 seedlings Pangas,
Minama, Anglican, Climate Machinjiri, Kapyepye, Communities , Slashes
Mtogolo, Kasonga Change Minama, Kasonga , Hoes
10 Construction of Staff To improve Education GVH's : 5 at Mtwiche, 3 at 25 Teachers 2018 2022 Bricks,
Houses access to Kasonga, 10 at Chopi, 2 at Quarry
quality and Machinjiri and 5 at Mulimu, stone,
equitable River
education Sand
11 Construction of School To improve Education GVHs: Mtwiche, Kasonga, All Bricks,
Blocks - Primary School access to Chopi,Kapyepye,Mulimu Communities Quarry
Blocks quality and stone,
equitable River
education Sand

12 Construction of To improve Education T/A Malemia All 2018 2022 Bricks,


Secondary School Blocks access to Communities Quarry
quality and stone,
equitable River
education Sand

116
Rank Name of Initiative Initiative Sector Location Beneficiaries Initiativ Initiativ Estimate Own Fundin
Objectives e Start e End d Cost Resourc g Gap
Date Date ('000) es ('000)

13 Maintenance of Songani To improve GVH Kapyepye All 2018 2022 Bricks,


Football Ground sporting Communities Quarry
activities stone,
River
Sand,
Land
11 Construction of Boreholes Improve Water GVHs: Mtwiche, Kasonga, Communities 2018 2022 Bricks,
access to Safe Chopi,Kapyepye,Mulimu,Mal Quarry
and Clean emia, Mtogolo, Machinjiri stone,
Water River
Sand,
Land
12 Provision of Piped Water Improve Water Kasonga All 2018 2022 Bricks,
access to Safe Communities Quarry
and Clean at Kasonga stone,
Water River
Sand
13 Construction of Bridges To Improve Public Kwisongole Katete Bridge, GVHs: 2018 2022 Bricks,
Transport and Works Mkwanda- Chidenga Bridge, Chisutu, Quarry
Communicati Songani-Chiulo Bridge, Kapyepye stone,
on Thunga Bridge, Paulosi River
Bridge, Sand
14 Roads Construction To Improve Public GVHs: Kapyepye, Mtogolo, All 2018 2022 Bricks,
Transport and Works Kasonga, Machinjiri, Chopi, Communities Quarry
Communicati stone,
on River
Sand,
15 Construction of Youth To Empower Social T/A Malemia All Youth 2018 2022 Bricks,
Centres Youth with Welfare Quarry
Skills stone,
River
Sand

117
Rank Name of Initiative Initiative Sector Location Beneficiaries Initiativ Initiativ Estimate Own Fundin
Objectives e Start e End d Cost Resourc g Gap
Date Date ('000) es ('000)

16 Development of VSLs To increase Community T/A Malemia All 2018 2022


Groups access to Developme Communities
credit nt
facilities

6. Ntholowa ADC

A. Profile

Name of GroupVillages Jiya, Machilinga, Kamwendo, Kazembe, Abiti Chikowi, Jumbe, Mpawa.

Population Age Group Male Female Total

0-59 Months 6614 7972 1000


6-14 Years 9157 11157 5000
15-64 Years 15205 19579 10000
65+ Years 3427 4439 4125
Grand Total 20, 125

Governance Traditional Leader: STA Ntholowa Political Leadership: The area has1 MP and 2 Councilors

Social Economic Available Services


Characteristics

Health The area has the follwong; Magomero Health Centre, Ntonya Health Post and 9 under five clinics
established in all GVHs.

Education The area has a total of 9 Primary Schools which are Government owned.

The area also has 2 Community Day Secondary Schools and 1 Private Secondary School

118
Water The major sources of safe water in the area are Boreholes and Protected wells. However, most
boreholes are no longer functioning due to lack of maintenance.

Roads The road network in the area is composed of feeder and earth roads

Environment Rainfall Statistics: The average rainfall in an area is 1000 mm per year

Year Average Amount Rainfall Average Rain Days


(mm) from October- April

2012/13 878 45

2013/14 1053.35 49

2014/15 908.64 38

2015/16 402.2 25

2016/17 456.64 28

Soils The area is experiencing decline in soil fertility due to water run-off. The area has loam soils

Vegetation The area has a number of forests reserves. Some belong to the community while others are
private. The hills in this area are bare due to deforestation

Rivers Namadzi and Utewe.

Livelihood Employment Opportunity About 237 people are employed in government sectors of Health, Education and Agriculture.
Village Savings Loans have been established which are helping some people to generate income
and start small businesses

Markets The area has a three Major Markets where people buy and sell their produce

Food Security Situation for The area has been experiencing food insecurity for some years.
ADC

119
Year Total Farm Families Families without Food % Farm Families without
Food

2012/13 36,743 249 1

2013/14 36,743 367 1

2014/15 40,292 806 2

2015/16 36,228 5796 16

2016/17 38073 762 2

B. Consolidated Village Action Plans

Rank Name of Initiative Initiative Sector Location Beneficiaries Initiative Initiative Estimated Own Funding
Objectives Start Date End Cost Resources Gap
Date ('000) ('000)

1 Construction of Secondary To improve Public Works STA 13,000 January,2018 Dec, 20,000 Sand, 15,000
Roads, Bridges and Transportation and Ntholowa 2022 Bricks,
Culverts Communication Quarry
stone

2 Construction and Increase access to Water Ntholowa 10,000 January,2018 Dec, 30,000 River sand, 25,000
Maintenance of Boreholes safe and clean Water 2022 Quarry
stone,
Bricks

3 Forest Rehabilitation, Land To reduce the impact Agriculture Ntholowa 12,000 January,2018 Dec, 7,500 Tree 5,500
Resources, Soil and Water of climate change 2022 seedlings,
Conservation Project and Environmental Vetiver
degradation

120
Rank Name of Initiative Initiative Sector Location Beneficiaries Initiative Initiative Estimated Own Funding
Objectives Start Date End Cost Resources Gap
Date ('000) ('000)

4 Construction of School To improve access Education Ntholowa 10,000 January,2018 Dec, 10,000 Quarry 4,000
Blocks and Teachers to quality and 2022 stone,
Houses Plus CBCC equitable education Bricks,
Sand

5 Construction of Under- To improve access Health Mpawa, 8,595 January,2018 Dec, 8,000 Quarry 5,000
Five Clinics to health care Machilinga, 2022 stone,
Kamwendo, Bricks,
Kazembe, Sand
Jiya, Abiti
Chikowi
and Jumbe

6 Construction of Markets To improve Public Works Jumbe, 7,000 January,2018 Dec, 21,000 Bricks, 13,000
household income Abiti 2022 River sand,
Chikowi Quarry
stone

7 Construction of Police To reduce crime rate Home Affairs Mpawa, 14,000 January,2018 Dece, 10,000 Quary 5,000
Unit Kamwendo, 2022 stone,
Jiya and Bricks,
Kazembe Sand

6. M’biza ADC

A. Profile

Name of Villages Likhomo, Mlewa, Likhomo, Muliya, Muhilili, Misiasi, M’biza Namagowa, Ching’anda, Kimu, Balala, Mwala and Mateketa

Population Age Group Male(All Age Groups) Female(All Age Groups) Grand Total(All Age Groups)

121
0 - 59 Months 39 376 46 800 86176
6 - 14 Years
15 - 64
65 +
Governance Traditional Leader: T/A M’biza with 10 GVHs Political Leadership:

Social Economic Available Services


Characteristics
Health Nansawa Health Centre and Magomero Mission Health Centre

Education

Water

Roads

Environment Rainfall Statistics The area receives Medium rainfall

Year Average Amount of Rainfall Average Rain Days


from October - April

2012/13 0 0

2013/14 0 0

2014/15 699.3 26

2015/16 385.2 25

2016/17 373.7 25

Soils The area has loam and sandy soils

Vegetation

Rivers The following are the rivers in the are Utwe, Sambaalendo, Tsabola andNgozi

122
Livelihood Employment Opportunities There are very limited employment opportunities in the area

Markets The following are the market centres in the area: Jenala, Makina andChikowi

Food Security

Year Total Farm Families Farm Families without % Farm Families without
Food Food

2012/2013 36,743 249 1

2013/14 36,743 367 1

2014/15 40,292 806 2

2015/16 36,228 5796 16

2016/17 38,073 762 2

Other Important Information The area has been experiencing erratic rainfall for the past five years which has led to food
insecurity

B. Consolidated Village Action Plans

Rank Name of Initiative Initiative Sector Location Beneficiaries Initiative Initiative Estimated Own Funding
Objectives Start End Cost Resources Gap
Date Date ('000) ('000)

1 Construction of School Blocks To improve Education Mateketa, 86 176 2018 2022 500,000 Bricks, 450,000
and Teachers Houses access to Sambalende, June January Sand and
quality and Khuluvi, Stones
equitable Nangowa,Belo,
education Lundu,
Likhomo,

123
Rank Name of Initiative Initiative Sector Location Beneficiaries Initiative Initiative Estimated Own Funding
Objectives Start End Cost Resources Gap
Date Date ('000) ('000)

Thangala and
Kaeramadzi

2 Construction of CBCCs To increase Education Mateketa, All Children 2018 2022 100,000 Bricks, 85,000
access to early Sambalende, June January Sand and
child education Khuluvi, Stones
Nangowa,Belo,
Lundu,
Likhomo,
Thangala and
Kaeramadzi

3 Construction of Community To reduce Education TA M'biza All Youths 2020 2022 500,000 Bricks, 450,000
Technical Colleges unemployment JUNE January Sand and
Stones

4 Establish Adult Literacy Classes Reduce Education Mateketa, All aldults 2018 2020 300,000 Bricks, 250,000
illiteracy Sambalende, Sand and
among the Khuluvi, Stones
adults Nangowa,Belo,
Lundu,
Likhomo,
Thangala
Kaeramadzi

5 Afforestation Project To reduce Forest All hills and 86 176 May-18 2020 10,000 Bricks, 5,000
environmental rivers June Sand and
degradation Stones

124
Rank Name of Initiative Initiative Sector Location Beneficiaries Initiative Initiative Estimated Own Funding
Objectives Start End Cost Resources Gap
Date Date ('000) ('000)

6 Capacity Building for To increase Local All GVHs 86 176 2018 2022 10,000 10,000
Governance structures (ADCs, efficiency and Government June July
VDCs, AECs) effectiveness
in delivery of
development

7 Capacity Building and To achieve Agriculture All GVHs in 86 176 2018 2022 80,000 Locally 70,000
Implementation of Manure food security T/A M'biza June July Available
Making, Construction of Water and reduce Materials
catchment Ridges and environmental
Conservation Agriculture degradation by
practicing
climate change
in Agriculture
in T/A M'biza

8 Construction and Maintenance To improve Public Works all GVHs 86 176 2018 2022 80,000 Bricks, 70,000
of Road Network transport and june July Sand and
communication Stones

9 Construction of Under Five To reduce Health Likhomo, 86 176 2018 2022 100,000 Bricks, 50,000
health facilities and walking long Malemia, June July Sand and
government owned health distances and Ching'anda and Stones
centres in M'biza maternal Mwala VDCs
mortality rates
by 95% in TA
M'biza by
2022

10 Establishment of Health To increase Health TA M'biza 87 176 2018 2022 50,000 0 40,000
Centre access to June July
health care

125
Rank Name of Initiative Initiative Sector Location Beneficiaries Initiative Initiative Estimated Own Funding
Objectives Start End Cost Resources Gap
Date Date ('000) ('000)

11 Rural Electrification To improve the Local Likhoma, 46 800 2018 2022 3,000 0 3,000
standards of Government Namateketa, June July
people by Mahuluka,
providing Thaziwa,
alternative Bwamusi,
energy source Kamela

12 Establishment of Police Unit Reduce Home Affairs Mateketa and 86 176 2018 2019 45,000 Bricks, 30,000
Incidence of Likhomo Aug Mar Sand and
Crime Muliya Stones

13 Construction of Boreholes and To increase Water All Villages 86 176 2018 2022 150,000 Bricks, 125,000
Installation of Piped Water access to June June Sand and
portable water Stones

14 Construction of Victim To reduce Social TA M'biza 46 800 2018 20,000 Bricks, 10,000
Supporting Unit Infrastructure GBV by 95% Welfare HQs June Sand and
at T/A Mb'biza by 2022 Stones

15 Campaign and Training on Land To reduce Lands All VDCs 86 176 2018 2022 100,000 Venues 85,000
Issues and Administration incidences of June July
land disputes
and
encroachment
into protected
areas in TA
M'biza

126
8. Nkagula ADC

A. Profile

Name of Villages Mlambe, Nambaiko, Matunduzi, Kachere, M’bawa, Mlira, nkhwazi, Mphero, Pondiya, Mphetembe 1&2, Chakalamba, Kachere,
Milepa, Makungula Muluwira

Population Age Group Male Female Total

0 - 59 Months 1114 1207 2321


6 - 14 Years 4010 4344 8354
15 - 64
65 + 10693 11584 22277

6460 6998 13457

Grand Total 46 409

Governance Traditional Leader: T/A Nkagula with 11 GVHs Political Leadership: The area has one counselor (Limbani Machilika)
and one MP (Abu Naliwa)

Social Economic Available Services


Characteristics

Health The area have 1 Heath Centre, 1 Clinical Officer, 5 Nurses and 26 HSA

Education The area has 14 Primary Schools and 1Private Secondary School

Water Nkagula has 207 boreholes and 92 taps of water from Water Users Association. Out of 207
boreholes ,48 are not functioning

Roads

Environment Rainfall Statistics This area normally experiences adequate rainfall which results into bumper yields

127
Soils

Vegetation

Rivers

Livelihood Employment Opportunity People in this area have no access in employment opportunity

Markets The area has no market

Food Security

Year Total Farm Families Families without Food % Farm Families Without Food

2012/13 24,608 718 3

2013/14 24,608 321 1

2014/15 24,569 634 3

2015/16 23,261 3424 15

2016/17 25,196 252 1

B. Village Action Plans

128
Rank Name of Initiative Initiative Sector Location Beneficiaries Initiative Initiative Estimated Own Funding
Objectives Start End Date Cost Resources Gap
Date ('000) ('000)

1 Afforestation Project To reduce Forest All VDCs 46409 18-Jan 18-Dec 1,400 Hoes, Seeds,
environmental Nurseries and
degradation Land

2 Construction of School Blocks To improve Education Nkagula School Going 2018 2022 Bricks and
and Teachers Houses access to quality ADC Children and 3,000,000 Sand
and equitable Teachers
education

3 Construction of Health Centre To increase Health Nkagula All Villages 2018 2022 Bricks and
access to health ADC 2,000,000 Sand
care services

4 Construction of Agricultural Improve access STA All Villages


Markets to agriculture Nkagula
markets

5 Capacity Building on Manure To increase crop All VDCs 46 409 2018 2022 Own Labour
Making yields

6 Child Protection Awareness To reduce Gender Nkagula Children, 2018 2022 Participation
Campaigns incidence of ADC Women and
Child abuse; To boys
reduce
incidences of
ender based
violence

7 Establishment of Police Unit To reduce crime Police STA All villages 2018 2022 Sand, Labour
rate Nkagula and Bricks

8 Construction of Bridges and To improve Public Works All 2018 2020 Sand, Trees,
Culverts transportation Villages and stones

129
Rank Name of Initiative Initiative Sector Location Beneficiaries Initiative Initiative Estimated Own Funding
Objectives Start End Date Cost Resources Gap
Date ('000) ('000)

9 Capacity Building for To increase Local STA All structures 2018 2020 Participation
Governance structures (ADCs, efficiency and Government Nkagula
VDCs, AECs) effectiveness in
delivery of
development

10 Gender Mainstreaming and To increase Social All Women and 2018 2020 Participation
Capacity Building Project women and welfare & Villages Youths
youth Youth
participation in
development

9. Mlumbe ADC

A. Profile

Name of GroupVillages Sitima, Issa II, Mkanda, Kutambala, Issa I, Sikamu

Population Age Group Male Female Total

0-59 Months 9154 13172


6-14 Years
15-64 Years 15636 21684
65+ Years
14111 17759 Grand Total 103264
4112 7636

130
Governance Traditional Leader: Senior Chief Mlumbe Political Leadership: The area has 2 MPs and 4 Councilors

Social Economic Available Services


Characteristics

Health The following are the Health Facilities: Zomba Forest, Thondwe H/C, Namikango Maternity
Wing, Zomba Mental Hospital, Zomba Central Hospital; Cobbe Barracks H/C, Zomba Prison
Dispensary, Zilindo H/C, Mwandama H/C and Namadidi Health Post

Education

Water

Roads

Environment Rainfall Statistics: The area has been registering an erratic and unreliable rainfall some years

Year Average Amount Rainfall Average Rain Days


(mm) from October- April

2012/13 1074 44

2013/14 859.8 51

2014/15 1275.8 47

2015/16 595.38 22

2016/17 855.6 36

Soils The area has poor clay soils

Vegetation The area has a number of forests reserves. Some belong to the community while others are
private. The area has also a number of hills.

Rivers The area has a number of rivers. Some are perennial and suitable for irrigation while others and
are seasonal. The following are the rivers found in the area; Naiwale, Nsamba, Thondwe, Mwisa,

131
Gandawale, Lidowe, Mbedza, Namikhate, Lisanjala, Naziwale, Ntembwe, Namalindiwa,
Mnamadzi, ThondweMwanuka,Nalilanje, Nambande, Naziwale, Maera, Linjizi 1,2, Nailubi,
Katete, Chingale, Sanjira, Chigumukire, Likangala, Nankhunda and Njelenjembedza.

Livelihood Employment Opportunity A small number of people (in GVH Sitima, Issa 1, 2, Kutambala) are employed in the
surrounding estates, while others are involved in self-employment including small scale business
and buying and selling charcoal.

Markets The following are the marets available in the area: Thondwe, Namadidi, Nswaswa, Nankhunda,
Nachikwangwala, Six Miles and Three Miles.

Food Security Situation for


ADC

Year Total Farm Families Families without Food % Farm Families without
Food

2012/13 44,773 568 1

2013/14 44,773 448 1

2014/15 47,263 943 2

2015/16 44,012 5722 13

2016/17 44,372 621 1

B. Consolidated Village Action Plans

132
Rank Name of Initiative Initiative Sector Location Beneficiaries Initiative Initiative Estimated Own Funding
Objectives Start End Date Cost Resources Gap ('000)
Date ('000)

1 Soil and Water Conservation To increase Agriculture Mkanda, 20,934 January, June, 1,000,000 Land, 500,000
Project agriculture Sikamu, 2018 2022 Hoes,
productivity Issa, Sitima Pangas
and
Kutambala

2 Afforestation Project To reduce Forest Mkanda, 36,110 June, June, 2,000,000 Land, 650,000
environmental Sikamu, 2018 2022 Hoes,
degradation Issa, Sitima Pangas,
and Slashes
Kutambala

3 Construction and To improve Public VDCs: 51,471 May, June, 15,000,000 Sand, 12,000,000
Maintenance of Road transport and Works Mkanda, 2018 2022 Bricks,
Network communication Sikamu, Quarry
Issa, Sitima stone
and
Kutambala

4 Installation of Piped Increase access Water Mkanda and 65,446 August, June, 500,000 sand, 400,000
Water(Gravity-fed) to portable water Sikamu 2018 2022 Bricks,
Quarry
stone, land

5 Construction and Water Mkanda and 34,271 June, June, 5,000,000 sand, 4,000,000
Maintenance of Boreholes Sikamu, 2018 2022 Bricks,
Mankanda, Quarry
Issa, Sitima stone, land
and
Kutambala

133
Rank Name of Initiative Initiative Sector Location Beneficiaries Initiative Initiative Estimated Own Funding
Objectives Start End Date Cost Resources Gap ('000)
Date ('000)

6 Rural electrification Project To increase Energy Mkanda and 99,415 June, June, 20,000,000 Land 18,000,000
household Sikamu, 2019 2022
income Issa, Sitima
and
Kutambala

7 Construction of Clinics Improve access Health Mkanda and 36,758 May, June, 10,000,000 Quarry 8,000,000
to Health care Sikamu, 2018 2022 stone,
Issa, Sitima Bricks,
and Sand
Kutambala

8 Land Resettlement Increase access Lands Kutambala 1,560 May, June, 100,000 60,000
to farm lands VDC 2018 2022

9 Construction of School To improve Education Sikamu, 30,300 May, June, 10,000,000 Quarry 8,000,000
Blocks and Teachers Houses access to quality Mkanda, 2018 2022 stone,
Plus Desks and equitable Issa, Sitima, Bricks,
education Kutambala Sand

10 Construction and To improve Agriculture Sikamu, 5,750 May, June, 600,000 Quarry 500,000
Rehabilitation of Irrigation Food Security Mkanda, 2018 2022 stone,
Schemes Issa, Sitima, Bricks,
Kutambala Sand

11 Construction of Council To increase Trade Sikamu, 75,921 June, June, 500,000 Quarry 300,000
Markets business Mkanda, 2018 2022 stone,
opportunities Issa, Sitima, Bricks,
Kutambala Sand

12 Construction of Youth Centre To increase Gender Sikamu and 1,000 June, June, 200,000 Quarry 150,000
access to HIV Mkanda 2018 2022 stone,
prevention and Bricks,
Sand

134
Rank Name of Initiative Initiative Sector Location Beneficiaries Initiative Initiative Estimated Own Funding
Objectives Start End Date Cost Resources Gap ('000)
Date ('000)

Gender
Information

13 Construction of CBCC To improve Education Sikamu, 13,660 June, June, 150,000 Quarry 100,000
access to quality Kutambala, 2018 2022 stone,
and equitable Issa, Sitima Bricks,
education and Mkanda Sand

14 Construction of Agriculture To improve Agriculture Kutambala 18,500 June, June, 100,000 Quarry 80,000
Market access markets VDC 2018 2022 stone,
for agricultural Bricks,
produce and Sand
inputs

15 Construction of Police Unit To reduce crime Home Kutambala 9,000 May, June, 50,000 Quarry 40,000
rate Affairs VDC 2018 2022 stone,
Bricks,
Sand

10. Nkapita ADC

A. Profile

Name of GroupVillages Mbukwite , Chibwana, Balamanja, Kapalasa, Mwangata, Masaula A, Masaula B, Mlooka

Population Age Group Male Female Total

0-59 Months 6614 7972


6-14 Years
15-64 Years 9157 11157
65+ Years

135
15205 19579 Grand Total 77, 550

3427 4439

Governance Traditional Leader: STA Nkapita Political Leadership: The area has 3 MPs and 4 Councilors

Social Economic Available Services


Characteristics

Health The area has the follwong; Chingale Health Centre; Chipini Parish Mission Hospital, Nkasala
Health Centre, M’Mambo Health Centre, Chilipa Health Centre; Changalume Barracks

Education The area has 22 primary schools including Chipini, Nthemba, Chinyaza, Nansambo, Masala,
Matoponi, Kalira, Kapako, Chikungwa, Zobwe and Matipa. The area also has Chingale Day
Secondary School, Namitembo CDSS, Balamanja CDSS and St Bridget CDSS

Water The area has about 125 boreholes and 10 well. About 35 of the boreholes are not functional

Roads The following comprise the road network in the area: Matipa- Namatuni, Kalalichi- Makanjira,
Mwinje II- Matipa School, Kalalichi- Kapalasa, Mwanga – Chia, Kalalichi – Ndasaliranji, Dip
Tank – Nyaka Via Chia, Balamanja – Kalalichi, Mpalume – Nyaka, Chiswe – Kapalasa, Gwaza –
Dip Tank, Kalaliki – Dagalasi, Mitawa – Chiswe, Kalaliche – Belom’doka, Zangala –Namsambo,
Kapitapa – Sinosi, Palanda – Gwaza, Dagalasi – Mkwate, Zangala – Mkwate, Kika – Chipini,
Waliyala – Masaula, Namatuni – Mitawa and Gwaza – Nyaka

Environment Rainfall Statistics: The area has been registering an erratic and unreliable rainfall for the past years

Year Average Amount Rainfall Average Rain Days


(mm) from October- April

2012/13 233.6 12

2013/14 233.6 11

2014/15 1244.8 55

136
2015/16 396.13 20

2016/17 637.58 56

Soils Gravel soils and and sandy loam soils

Vegetation The area has a number of forests reserves. Some belong to the community while others are
private. The hills in this area are bare due to deforestation

Rivers The area has 0ver 23 rivers some of which are perennial. The rivers include Linthipe, Namitembo,
Namsambo, Mauzi, Thebvute, Mangombo, Masala, Kapako, Rozi, Chanthemba, Chimbwinda,
Mtungulutsi, Misenjere, Kalira, Msinjiri, Nanungu, Magomero, Malowa, Msambankhalamba,
Mkwakwazi Naphembere, Lisanjala and Shire.

Livelihood Employment Opportunity Some few people are employed in government sectors of Health, Education and Agriculture
while others are involved in self-employment including charcoal selling, fishing in Shire River,
Irrigation in Perennial Rivers like Shire Others are employed in Private Sectors like; World
Vision, Mission Hospital like Chipini Parish, Namitembo Parish Mission.

Markets The following are the markets available in the area: Chipini, Chingale, Masaula, Chimsewu,
M’mambo and Msosa

Food Security Situation for The area has been experiencing food insecurity for some years.
ADC

Year Total Farm Families Families without Food % Farm Families without
Food

2012/13 33923 3163 19

2013/14 33923 3468 21

2014/15 33923 757 5

137
2015/16 35185 5745 33

2016/17 37379 718 4

B. Consolidated Village Action Plans

Rank Name of Initiative Initiative Sector Location Beneficiaries Initiative Initiative Estimated Own Funding
Objectives Start End Cost Resources Gap ('000)
Date Date ('000)

1 Construction and Increase access Water Mbukwite, 72,993 March, April, 1,120,000 River 840,000
Maintenance of Boreholes portable Water Fikira, Nkasala, 2018 2022 sand,
Masaula, Quarry
Kapalasa, stone,
Mwangata and Bricks
Balamanja

2 Maintenance of Piped Water Water Mbukwite, 72,993 March, April, 12,000,000 Sand, 12,000,000
System (Non- functional Fikira, Nkasala, 2018 2022 Bricks,
Tanks, Pipes and Taps) Masaula, Quary
Kapalasa, stone
Mwangata and
Balamanja

3 Construction of roads Improve Public Mbukwite, 72,993 June, July, 56,742,800 Sand, 55,892,300
(Secondary and tarmac) transportation Works Fikira, Nkasala, 2018 2022 Bricks,
Bridges and Culverts and Masaula, quarry
Communication Kapalasa, stone
Mwangata and
Balamanja

4 Construction of Rural Improve access Health Mbukwite, 72,993 June, July, 10,000,000 sand, 8,000,000
Hospitals to Health care Chingale 2018 2022 Bricks,
Centre quarry
stone, land

138
Rank Name of Initiative Initiative Sector Location Beneficiaries Initiative Initiative Estimated Own Funding
Objectives Start End Cost Resources Gap ('000)
Date Date ('000)

5 Construction of Under Five Health Kapalasa, 72,993 July, June, 12,000 quarry 8,000
Clinics Mwangata, 2019 2021 stone,
Masaula, Bricks,
Balamanja, Sand
Mbukwite

6 Construction of Health Health Fikira Jusu, 72,993 June, July, 600,000 sand, 400,000
Centre Kapalasa, 2018 2022 Bricks,
Gwaza, quarry
Masaula stone, land

7 Rural Electrification Project To increase Energy Fikira Jusu, 72,993 March, June, 8,000,000 8,000,000
household Kapalasa, 2018 2022
income Mwangata,
Masaula

8 Construction of School To improve Education Balamanja, 72,993 March, June, 30,000,000 Quary 28,000,000
Blocks and Teachers Houses access to quality Mbukwite, 2018 2021 stone,
Plus CBCC and equitable Kapalasa, Bricks,
education Mwangata, Sand
Masaula

9 Construction of Secondary To improve Education Nkasala, 72,993 June, July, 840,000 Quary 800,000
Schools access to quality Kapalasa, 2018 2022 stone,
and equitable Mwangata, Bricks,
education Masaula, Fikira Sand

10 Construction of Police Unit To Reduce Home Fikira Jusu, 72,993 June, July, 30,000 quarry 25,000
Crime Rate Affairs Kapalasa, 2018 2021 stone,
Chingale Bricks,
Sand

139
Rank Name of Initiative Initiative Sector Location Beneficiaries Initiative Initiative Estimated Own Funding
Objectives Start End Cost Resources Gap ('000)
Date Date ('000)

11 Upgrading of Chingale and Increase Agriculture Chingale and 72,993 June, July, 4,000,000 quarry 3,800,000
Masaula EPA and Staff agricultural Masaula EPAs 2018 2022 stone,
Houses productivity Bricks,
Sand

12 Construction of ADMARC Improve access Agriculture VDCs: 72,993 June, July, 100,000 quarry 9,000
to Agricultural Fikira,Masaula, 2018 2021 stone,
Produce and Masaula, Bricks,
inputs Kapalasa, Sand
Mwangata and
Balamanja

13 Construction and Increasing Agriculture Masaula and 40,000 June, July, 4,000,000 Quary 3,900,000
Maintenance of Irrigation Production and Chingale EPAs 2018 2022 stone,
Schemes Enhancing Food Bricks,
Security Sand

14 Procurement of Ambulances Improve access Health Nkasala, 72,993 June, July, 80,000 80,000
to health care Masaula and 2018 2022
Chingale
Health Centres

15 Land Resources, Soil and To reduce food Agriculture All VDCs 72,993 June, July, 200,000 Hoes, 150,000
Water Conservation project insecurity 2018 2022 Land

16 Afforestation Project To mitigate the Forestry STA Nkapita 26,500 July, June, 350,000 Human 350,000
impact of 2018 2021 Capital,
Climate Change Land,
Pangas

140
11. Mwambo ADC

A. Profile

Name of Group Villages Kwindimbule, Jali, Chilunga, Nyanya, Nambes, Mindano, Mbalu, Kimu, Chingondo, Kadewere, Chaweza, Kathebwe, magoli,
Makawa.

Population Age Group Male Female Total

0-59 Months 9154 13172 13411


6-14 Years
15-64 Years 15636 21684 22020
65+ Years
14111 17759 30825

4112 7636 -

Grand Total 66256

Governance Traditional Leader: T/A Mwambo Political Leadership: The area has 2 MPs and 4 Councilors

Social Economic Available Services


Characteristics

Health The area has health posts and health centres as follows: Chamba H/C, Pirimiti Mission Hospital,
Matawale Health Centre, Matiya Health Centre and Likangala Health Centre

Education

Water Major sources of portable water in the area are taps, boreholes and protected wells. However,
most boreholes are no longer functioning due to lack of maintenance.

Roads The road network is mostly composed of feeder and earth roads which connect the people to
different places and markets.

Environment Rainfall Statistics: The area has been registering an erratic and unreliable rainfall for the past 5 years

141
Year Average Amount Rainfall Average Rain Days
(mm) from October- April

2012/13 950.8 39

2013/14 885.1 53

2014/15 1164.6 48

2015/16 437.7 27

2016/17 691.02 40

Soils Due to water run-off there is a decline in soil fertility which results into low yield produce to
the Farmers

Vegetation The area has a number of forests reserves. Some belong to the community while others are
private such as estate owners. The area has also a number of some small hills but they are
almost bare or with no or little vegetation/trees due to deforestation

Rivers .

Livelihood Employment Opportunity Some few people who are employed in government sectors of Health, Education and
Agriculture while others are involved in self-employment including beer brewing, farming (e.g.
fish), kabadza and other small scale businesses.

Markets The following are the markets available in the area: Govala, Pyupyu, Kachulu, Jali, Sunuzi,
Gomani, Namikango, and Matiya.

Food Security Situation for ADC The area has been experiencing food insecurity for many years.

Year Total Farm Families Families without % Farm Families without


Food Food

2012/13 46,944 1680 7

2013/14 46,944 591 2

142
2014/15 48,575 1498 6

2015/16 47,010 7829 34

2016/17 48,298 970 4

B. Consolidated Village Action Plans

Rank Name of Initiative Sector Location Beneficiaries Initiative Initiative Estimated Own Funding Gap ('000)
Initiative Objectives Start End Cost Resources
Date Date ('000)

1 Construction To improve Health Jali VDC, 27,241 July, July, sand, Bricks, Iron Sheets, Nails,
of Health access to health Kwindimbule 2018 2022 quarry stone, Cement, Contractors,
Centres care and Chilunga land Plunks

2 Construction To improve Health Chaweza Communities July, June, quarry stone, Iron Sheets, Nails,
of ART Clinic access to health 2018 2022 Bricks, Sand Cement, Contractors,
care Plunks

3 Procurement of To improve Health Matawale 66,256 July, July,


Ambulances access to health Health Centre 2018 2022
and Bicycle care and Bicycle
Ambulances Ambulances
to all GVHs

4 Construction To improve Health Kimu and 16,832 July, June, quarry stone, Iron Sheets, Nails,
of Health access to health Mbalu 2018 2022 Bricks, Sand Cement, Contractors,
Centres Staff care Plunks
Houses

5 Construction To improve Education All GVHs in 35,431 July, June, quarry stone, Iron Sheets, Nails,
of School access to quality Mwambo 2018 2022 Bricks, Sand Cement, Contractors,
Blocks and and equitable Plunks
Teachers education

143
Rank Name of Initiative Sector Location Beneficiaries Initiative Initiative Estimated Own Funding Gap ('000)
Initiative Objectives Start End Cost Resources
Date Date ('000)

Houses Plus
CBCC

6 Construction To improve Education All GVHs in 35,431 July, June, quarry stone, Iron Sheets, Nails,
of Secondary access to quality Mwambo 2018 2022 Bricks, Sand Cement, Contractors,
Schools and equitable Plunks
education

7 School To improve Education All Schools in 22,020 July, June,


Feeding access to quality Mwambo 2018 2022
Programme and equitable
education

8 Rehabilitation To improve food Agriculture All Schemes 66,256 July, June, quarry stone, Treadle Pumps,
of Irrigation Security in Mwambo 2018 2022 Bricks, Sand Watering Canes and
Schemes Pipes

9 Construction To improve food Agriculture/ Chilunga, 41,263 July, June, Quary stone, Labour, Cement
of Dykes Security Public Works Kathebwe, 2018 2022 Bricks, Sand
Chaweza,
Mbalu,
Kadewere,
Makawa,
Magoli

10 Construction To increase Water All GVHs in 66,256 July, June, River sand, Cement, Pipes, Spare
of Boreholes access to safe Mwambo 2018 2022 quarry stone, Parts, Contractors
and and clean Water Bricks
Maintenance

144
Rank Name of Initiative Sector Location Beneficiaries Initiative Initiative Estimated Own Funding Gap ('000)
Initiative Objectives Start End Cost Resources
Date Date ('000)

11 Afforestation To reduce the Forestry All GVHs in 66,256 July, June, seedling, Polythene Tubes
Project impact of climate Mwambo 2018 2022 Labour
change

12 Construction To improve Public Works All GVHs in 66,256 July, June, Sand, Contractor
of Secondary transportation Mwambo 2018 2022 Bricks,
Roads, Bridges and quarry stone,
and Culverts Communication Labour

13 Construction To reduce crime Home Affairs GVHs 18,899 July, June, quarry stone, Cement, Labour, Iron
of Police Unit rate Kadewere, 2018 2022 Bricks, Sand Sheets, Nails
Mindano and
Chaweza

14 Land To reduce food Agriculture All VDCs 49,311 July, June, Hoes, Land, Capacity Building
Resources, insecurity 2018 2022 Labour
Soil and Water
Conservation
Project

15 Rural To improve Energy Kimu GVH, 41,263 July, June, Electrical Electricians and
Electrification household Mindano, 2018 2022 wiring Transformers
Project income Chilunga, Equipment
Kwindimbule
and Makawa

16 Development To increase Community T/A Mwambo All July, June, Cash Box, Trainings
of VSLs access to credit Development including Communities 2018 2022 Basins
Groups facilities GVH Nyanya

145
12. Ngwelero ADC

A. Profile

Name of Group Villages Chimbalanga, Namakhuwa, Taulo, Dimusa, Ngwelero, Namalima and Mukiwa

Population Age Group Male Female Total

0-59 Months
6-14 Years
15-64 Years
65+ Years
Grand Total

Governance Traditional Leader: STA Ngwelero Political Leadership: The area has 2 MPs and 4 Councilors

Social Economic Available Services


Characteristics

Health The area has Ngwelero and Mayaka Health Centres

Education

Water

Roads

Environment Rainfall Statistics: The area has been registering an erratic and unreliable rainfall for the past years

Year Average Amount Rainfall Average Rain Days


(mm) from October- April

2012/13 1131.5 50

146
2013/14 784.5 54

2014/15 806.53 31

2015/16 536.4 26

2016/17 616.4 38

Soils Poor clay soils

Vegetation The area has a number of forests reserves. Some belong to the community while others are
private.

Rivers Many rivers are seasonal and not reliable for irrigation

Livelihood Employment Opportunity Some few people who are employed in government sectors of Health, Education and
Agriculture while others are involved in self-employment including charcoal selling

Markets

Food Security Situation for ADC The area has been experiencing food insecurity for many years.

Year Total Farm Families Families without % Farm Families without


Food Food

2012/13 22560 1109 5

2013/14 22,560 534 2

2014/15 24,370 731 3

2015/16 23,242 4416 19

2016/17 24,384 488 2

B. Consolidated Village Action Plans

147
Ran Name of Initiative Sector Location Beneficiarie Initiative Initiative Estimate Own Funding Gap ('000)
k Initiative Objectives s Start Date End Date d Cost Resource
('000) s

1 Construction To increase Water Taulo, Chimbalanga, 22,200 August, November 356,000 River Cement, Pipes,
and access to safe Namalima, Dimusa, 2018 , 2022 sand, Contractor
Maintenance and clean Ngwelero, Mukiwa quarry
of Boreholes Water stone,
Bricks

2 Establishmen To improve Agriculture Taulo, Chimbalanga, 19500 April, December, 745,000 Bricks, Solar Panel, Pumps,
t of food security Namalima, Dimusa, 2018 2022 River Trainings, Pipes and
Irrigation Ngwelero, Mukiwa Sand and Cement
Schemes Quarry
Stone and
Labour
force

3 Capacity To improve Agriculture GVHs: Taulo, 19500 May, 2018 November Sand, Trainings
Building of food security Chimbalanga, , 2022 Bricks,
Construction Namalima, Ngwelero quarry
of Marker stone
Ridges

4 Construction To improve Education Taulo, Chimbalanga, 14,000 June, 2018 November 500,000 quarry Cement, Iron Sheets,
of School access to Namalima, Ngwelero, , 2022 stone, Contractor
Blocks and quality and Mukiwa, Sunuzi, Bricks,
Teachers equitable Chikomwe and Sand
Houses Plus education Kasimu
CBCC

5 Construction To improve Education GVH Ngwelero 4,500 April, June, 2020 150,000 sand, Cement, Paints,
of Technical access to 2019 Bricks, Doors, Teaching
Community quality and quarry Materials, Tutors,
Colleges equitable stone, Contractor
education land

148
Ran Name of Initiative Sector Location Beneficiarie Initiative Initiative Estimate Own Funding Gap ('000)
k Initiative Objectives s Start Date End Date d Cost Resource
('000) s

6 Establishmen To reduce that Forestry Taulo, Chimbalanga, 17,000 May, 2018 February, 900 Land, Polythene Tubes,
t of Tree impact of Namalima, Ngwelero, 2019 Hoes, Seedlings, Water
Nurseries and climate change Mukiwa, Namakhuwe, Poles canes, Wheel
Afforestation Dimussa Barrows, Trainings
Project

7 Construction Improve access Public VDCs: Mbukwite, 60,000 May, 2018 October, 200,000 Sand, Cement, Gravel,
of Secondary to Works Fikira, Nkasala, 2022 Bricks, Wheelbarrows,
Roads, transportation Masaula, Masaula, quarry Shovels, Timber,
Bridges, and and Kapalasa, Mwangata stone
Culverts Communicatio and Balamanja
n

8 Installation Improve access Informatio Chikomwe Hill, 40,000 January, May, 2018 Land
of Telephone to n Sunuzi 2018
Transmitters transportation
and
Communicatio
n

9 Capacity To increase Local Govt ADC, Village Heads 1,500 January, December, 113,400 113,400
Building for efficiency and 2018 2022
Governance effectiveness in
structures delivery of
(ADCs, development
VDCs,
AECs)

10 Construction To increase Health GVHs: Mukiwa, 9,000 May, 2018 May, 2019 40,000 sand, Cement, Gravel,
of Health access to health Sunuzi, Namakhuwa, Bricks, Wheelbarrows,
Centre care Dimusa, Mulima quarry Shovels, Timber,
stone, Contractor,
land Technicians and
Nurses, Iron sheets.

149
Ran Name of Initiative Sector Location Beneficiarie Initiative Initiative Estimate Own Funding Gap ('000)
k Initiative Objectives s Start Date End Date d Cost Resource
('000) s

11 Construction To improve Agriculture GVHs: Sunuzi, 20,000 September, May, 2019 25,000 quarry Cement, Contractor,
of ADMARC marketing to Ngwelero, 2018 stone, Iron Sheets
agricultural Namalima,Namakhuw Bricks,
Produce and a Sand
inputs

12 Construction To reduce Home Sunuzi and Ngwelero 11,000 June, 2018 June, 2019 10,000 quarry Cement, Contractor,
of Police crime rate Affairs stone, Iron Sheets
Unit Bricks,
Sand

150

You might also like