Env Manag Plan For Construction
Env Manag Plan For Construction
Env Manag Plan For Construction
Environmental Management
Plan
for
Construction of Green Park at Stanley
Bay
Contract No. : CV/2006/EMP-01
Revision No. : 1
Date : 1 – 1 – 2006
Revision History
Revision Sections Revised Approved
Description
Date Affected By By
1-1-2006 First issue - - KT Wong
Form Number : EF-EI01-01
Environmental Management Plan Revision Number : 1
WBC
Construction of Green Park at Stanley Bay Date : 1-1-2006
Contents
Section Title Page No.
1.0 Background ............................................................................................................. 1
1.1 Project Description .............................................................................................................. 1
1.2 Requirements for an Environmental Management Plan (EMP) .......................................... 1
1.3 Objectives of the EMP ......................................................................................................... 1
2.0 Policy Statement ..................................................................................................... 2
3.0 Organisation Structure and Responsibilities ........................................................ 3
3.1 Site Organisation Diagram .................................................................................................. 3
3.2 Environmental Team Structure ........................................................................................... 3
4.0 Promoting Environmental Awareness ................................................................... 3
4.1 Reporting and Communication Procedures ........................................................................ 4
5.0 List of Legal and Other Requirements .................................................................. 5
6.0 List of Significant Environmental Aspects ............................................................ 5
7.0 Environmental Control Procedures and Mitigation Measures ............................. 5
8.0 Environmental Emergency Procedures ................................................................. 6
9.0 Environmental Inspection, Monitoring, Auditing and Corrective Actions ........... 6
10.0 Environmental Records .......................................................................................... 6
List of Tables
Table 1 An Outline of Training Requirement for all Relevant Staff(s)
Table 2 Summary of Communication Means & Actions
Table 3 A list of environmental procedure(s) / instruction(s) for site staff and
subcontractors’ staff
Table 4 Example of Environmental Records
List of Appendices
Appendix A Site Maps
Appendix B List of Sensitive Receivers
1.0 Background
1.1 Project Description
One of the Government Departments of the Hong Kong Special Administrative Region (hereafter referred
as ‘the Client’) intends to construct a Green Park in Stanley Bay of South Hong Kong Island and its
essential associated infrastructure (hereafter referred as the Project). Proposed facilities will include the
Green Park, entertainment, retail and dining outlets, resort hotel with 100 rooms, and essential supporting
services. New roads, public transport interchange, vehicle parking areas, and associated stations will
provide direct transport links to the proposed park.
Wan Bao Construction Limited (WBC) has been awarded the Contract CV/2006/EMP-01 for Stanley
Bay’s Development Contract by Client. The construction work is scheduled to commence in Jan 2006 and
will be completed tentatively by Dec 2008. The contract include the following designated projects:
Western Storm water Drainage Channel at Stanley Bay;
• Construction and operation of drainage channel which discharges into an area, where is 800 m away
from the St. Stephen’s Beach;
Chung Hom Kok Link Road;
• Construction of the site formation for about 1.5 km of a road, which is an expressway.
A site-map showing the site boundary is shown in Appendix A.
Endorsed by
____________________
K. T. Wong
General Manager of
Wan Bao Construction Limited
1/1/2006
The Client
The Engineer
CC Chow
TM Kok
Foremen
In general, the training sessions will be conducted by the EM / Project Environmental Engineer (PEE) on
a regular basis or where it is deemed necessary. In order to establish a better community relationship, EM /
PEE is responsible to organise meetings and establish communicate channels to convey WBC’s
environmental commitment and performance to the nearby community.
N 4
6
1
7
NSR - Local school and
shopping arcade 2
NSR - Stanley
Estate
(population of
300 residents)
Noise barrier
provided by Client
On-site
Site Entrance Security
guard room
24 hours on-
duty
Air
Air Sensitive Horizontal Distance to
Fig. No. Description Sensitive
Receivers No. Worksite (m)
Receivers
1 Appendix A Stanley Bay Estate – Block 1 x 60
2 As above Stanley Bay Estate – Block 2 x 70
3 As above Stanley Bay Estate – Block 3 x 80
4 As above Stanley Bay Estate – Block 4 x 120
5 As above Stanley Bay Estate – Block 5 x 130
6 As above Stanley Bay Estate – Block 6 x 85
7 As above Stanley Bay Estate – Block 7 x 90
5 As above Local school x 65
6 As above Local shopping arcade x 65
Water Sensitive
Water Sensitive Horizontal Distance to
Fig. No. Description Receivers (Stream,
Receivers No. Worksite (m)
River and Sea)
N/A N/A N/A N/A N/A