The document contains a checklist of legal compliance requirements for a project site. It lists 51 items across various acts related to labor laws, occupational health and safety, electricity safety, gas cylinder rules, and road transport safety. Requirements include licenses, registrations, policies, training, equipment, and documentation that must be in place and maintained.
The document contains a checklist of legal compliance requirements for a project site. It lists 51 items across various acts related to labor laws, occupational health and safety, electricity safety, gas cylinder rules, and road transport safety. Requirements include licenses, registrations, policies, training, equipment, and documentation that must be in place and maintained.
The document contains a checklist of legal compliance requirements for a project site. It lists 51 items across various acts related to labor laws, occupational health and safety, electricity safety, gas cylinder rules, and road transport safety. Requirements include licenses, registrations, policies, training, equipment, and documentation that must be in place and maintained.
The document contains a checklist of legal compliance requirements for a project site. It lists 51 items across various acts related to labor laws, occupational health and safety, electricity safety, gas cylinder rules, and road transport safety. Requirements include licenses, registrations, policies, training, equipment, and documentation that must be in place and maintained.
Yes No Legal & statutory requirement ( legal compliance grp responsible ) Contract Labor (R & A) Act,1970 1 Labour License if manpower >= 20 persons 2 Form No.16 Attendance Register 3 Form No.17 Wages Register 4 Form No.20 Fines Register 5 Notice mentioning working hours, wage Period and dates of Payment of Wages 6 Details of concerned Labour Officer(in English/Local Language) 7 Workmen Compensation Act ( For the Areas not covered by ESI ) 8 Copy of WC Policy 9 Minimum Wages Act,1948 10 Rate of Wages 11 Hours of Work 12 Wage period 13 Date pf payment of wages 14 Name and addresses of Labour Officer 15 Provident Fund & Misc. Provisions Act,1952 16 Copy of PF Code Allotment Letter 17 Copy of PF Challans duly deposited 18 Copy of PF Inspection Reports if any. 19 Employment State Insurance Act ( if applicable) 20 Copy of the ESI Code allotment letter 21 Copy of ESI Nomination Form 22 Copy of ESI Challans to be submitted every month 23 Payment of Bonus Act 24 Details of Bonus paid to employees OHS Related requirement ( OHS group Responsible ) 25 Building and Other Construction Workers Act 26 Safety Policy displayed/communicated 27 Fire protection provided 28 Safety shoes and helmets provided 29 Other PPEs required for ongoing activities provided 30 Copy of driving License of drivers at project site 31 Proper illumination available at site 32 Site material stored and stacked in Safe and orderly manner 33 All Lifting appliances are in good working condition 34 Test Certificates available for lifting appliances 35 Safe working load is marked for derrick, pulley and other lifting gears 36 Medical check up for operators of Lifting appliances done and declared fit 37 Every earth moving vehicle is fitted with: - Silencers - Tail Lights - Power and hand brakes - Reversing alarm - Search Light for forward and backward movement 38 Ladder - Made of good construction/sound material - Secured to prevent swaying - An inclination of four in one is maintained - Has no missing rungs 39 Scaffold - Every component is made of sound material, free from any detects - Conforms to national standard - Erected/altered under supervision of responsible person -Inspected and identified with “Green” or “ Red” Tags 40 Medial check up carried out 41 Emergency contact nos displayed 42 First Aid box provided 43 Stretcher provided Indian Electricity Act 2003 44 Safety working clearances displayed/maintained 45 Proper earthling is provided 46 Danger/caution boards provided near Live switch boards/apparatus Gas Cylinder Rules 47 Only industrial grade gas cylinder used 48 Cylinders are provide with valves and security nut of good working quality 49 LPG cylinder are kept in upright position -Gas cylinders are stored in cool dry and well ventilated place -Marking on cylinders to be verified while receiving including mark for “hydrostatic test “ dates Road and Transport safety 50 Vehicles have seat belts Vehicles are insured Be fitted with Fire Extinguisher Driver/operator has valid licence Vehicles are Fit for use