The document discusses the method statement for stone pitching work at bridges. It details the procedures for preparing the slope, laying backing material, placing stones, filling voids with mortar, and curing. It also mentions conducting a sample work and maintaining quality records.

Uploaded by

biranchimohanty
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
67% found this document useful (3 votes)
3K views9 pages

Stone Pitching Work

The document discusses the method statement for stone pitching work at bridges. It details the procedures for preparing the slope, laying backing material, placing stones, filling voids with mortar, and curing. It also mentions conducting a sample work and maintaining quality records.

Uploaded by

biranchimohanty
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

1/8/24, 4:50 PM Mail - Biranchi Mohanty - Outlook

Re: Method Statement for Stone Pitching Work at Bridges


Durga Pattanaik <[email protected]>
Tue 1/2/2024 7:47 PM
To:​Biranchi Mohanty <[email protected]>​
Cc:​S Sundarrajan <[email protected]>;​Ashutosh Kumar <[email protected]>;​Manas
Mohapatra <[email protected]>​
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you
recognize the sender and know the content is safe.

Dear Sir,
Please go ahead for pitching as sample.

Thanks & Regards,


Durga Prasad Pattanaik

Get Outlook for Android

From: Biranchi Mohanty <[email protected]>


Sent: Tuesday, January 2, 2024 11:43:38 am
To: Durga Pattanaik <[email protected]>
Cc: Ashutosh Kumar <[email protected]>; Manas Mohapatra
<[email protected]>
Subject: Re: Method Statement for Stone Pitching Work at Bridges

Dear Sir,
Submitting you the revised MS of Stone Pitching work along with approved JSA for your kind
approval. We have incorporated the following comments in the revised MS. Please approve the same
to start the work.

Biranchi Mohanty
Assistant Manager-Quality (BU-Railways)

+91 8017999318 | [email protected]


Project Office: At-Mangalpur, Po-Kamaria, PS-Tihidi, Dist-Bhadrak,Odisha-756130

From: Durga Pattanaik <[email protected]>


Sent: Sunday, December 31, 2023 9:46 AM
To: Biranchi Mohanty <[email protected]>; Manas Mohapatra <[email protected]>
Cc: Ashutosh Kumar <[email protected]>
Subject: Re: Method Statement for Stone Pitching Work at Bridges

CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you
recognize the sender and know the content is safe.

Dear Sir,
Please add a few points such as

https://outlook.office.com/mail/inbox/id/AAQkAGNkOTkwNjA1LTcwZDUtNDA5ZC1hNjA5LThiYzgyMWIyY2FmZAAQACjtqKYkKxxJvZw9%2FVafd… 1/3
1/8/24, 4:50 PM Mail - Biranchi Mohanty - Outlook

reference drawings, IS codes, site engineer/supervisor is the responsible person, required


basic tools and equipment, disposal of excess materials, batter trimmings and compaction,
curing of mortar by water sprinkling.
Instead of stone dust it should be mixed with 10 mm or 6mm for flirtation and minimum
thickness as in drawing.
JSA shall be approved.

You can proceed for a sample slope pitching demonstrating in any one of the bridges for
approval.

This is for your information and necessary action please.

Thanks & Regards,


Durga Prasad Pattanaik

Get Outlook for Android

From: Biranchi Mohanty <[email protected]>


Sent: Thursday, December 28, 2023 1:30:16 PM
To: Manas Mohapatra <[email protected]>
Cc: Ashutosh Kumar <[email protected]>; Durga Pattanaik
<[email protected]>
Subject: Method Statement for Stone Pitching Work at Bridges

Dear Sir,
Refers to the above, please find attached MS, checklist & JSA for your review and approval. Kindly
approve the same to start the activity at site.

Biranchi Mohanty
Assistant Manager-Quality (BU-Railways)

+91 8017999318 | [email protected]


Project Office: At-Mangalpur, Po-Kamaria, PS-Tihidi, Dist-Bhadrak,Odisha-756130

This Email and any attachments therewith are for the sole use of the intended recipient(s) and may
contain confidential and privileged information. If you are not the intended recipient, please notify
the sender immediately and destroy / delete this message or copies thereof and any attachments
therewith. Any unauthorized use, disclosure or copying of this message and the attachments
thereto (in whole or part), in any manner is strictly prohibited and may constitute unlawful act.
While KEC takes reasonable precautions to protect its IT Systems, the recipient acknowledges that
emails could be illegally intercepted, corrupted, lost, destroyed, arrive late or incomplete or contain
viruses and in such an event KEC will not be liable for any errors, omissions, viruses, damages in the
contents of such message and attachments therewith.
This Email and any attachments therewith are for the sole use of the intended recipient(s) and may
contain confidential and privileged information. If you are not the intended recipient, please notify
the sender immediately and destroy / delete this message or copies thereof and any attachments
therewith. Any unauthorized use, disclosure or copying of this message and the attachments
thereto (in whole or part), in any manner is strictly prohibited and may constitute unlawful act.
While KEC takes reasonable precautions to protect its IT Systems, the recipient acknowledges that
emails could be illegally intercepted, corrupted, lost, destroyed, arrive late or incomplete or contain

https://outlook.office.com/mail/inbox/id/AAQkAGNkOTkwNjA1LTcwZDUtNDA5ZC1hNjA5LThiYzgyMWIyY2FmZAAQACjtqKYkKxxJvZw9%2FVafd… 2/3
1/8/24, 4:50 PM Mail - Biranchi Mohanty - Outlook

viruses and in such an event KEC will not be liable for any errors, omissions, viruses, damages in the
contents of such message and attachments therewith.

https://outlook.office.com/mail/inbox/id/AAQkAGNkOTkwNjA1LTcwZDUtNDA5ZC1hNjA5LThiYzgyMWIyY2FmZAAQACjtqKYkKxxJvZw9%2FVafd… 3/3
METHOD STATEMENT FOR STONE PITCHING WORK AT BRIDGES

Objective

The method describes about the stone pitching work at Bridge approach slopes beside the
curtain wall on both end.

Document Reference

Approved Drawing of respective Bridges


IRC: 56-2011

Responsible Person

Site Engineer
Site Supervisor

Material
Boulder 300mm size
Crusher dust (10mm & 6mm mixed) as backing material
Mortar 1:6
Concrete of M15 grade Leveling Course

Machinery
Excavator
Dumper
Wooden Rammer

Procedure
1. Boulders of regular size of 300mm & Stone dust shall be ready at site. Before stone
pitching, the formation behind the return wall to curtain wall shall be dressed to
maintaining at a slope 1:1.5 as mentioned in the drawing. The slope shall be
compacted by manual ramming.
2. In order to prevent escape of the embankment material through the voids of the stone
pitching a layer of 100 to 150mm thick 10mm & 6mm mixed crusher dust as backing
material shall be laid over the embankment material. In addition, this layer enables
greater stability and friction for settlement of boulders firmly without rolling off from top.

3. Boulders shall be shifted manually by labours. It shall be meticulously placed by skilled


labours. For stone pitching also slope 1:1.5 is maintained with lines and levels as per
the drawing. The sizes of spalls shall be a minimum of 25 mm and shall be suitable
to fill the voids in the pitching.
4. Voids of stone pitching shall be filled with 1:6 cement mortars for better interlocking.
The outer edge Strip throughout the slope shall be sealed with M15 grade Leveling
Course.

5. Strip PCC with M20 grade PCC shall be done from sides to confine and to prevent
Boulder sliding. Curing of strip PCC and mortar shall be done by water sprinkling for
7days.
We shall make a sample stone pitching at any of the bridges.
6. FQP vide document no. Doc no- H-W020-600-E-QC-GN-037 & attached Checklist shall be
maintained for records.

7. Approved JSA shall be followed at site.


DHAMRA RAILWAY DOUBLING PROJECT
OPERATIONAL RECORDS FOR SITE
Format No. -KEC/DHAMRA-RLY/SPW/35

CHECK LIST FOR STONE PITCHING WORK AT BRIDGES


Project - Engineering, Procurement & Construction (EPC) Contract for Dhamra Railway Doubling – Phase 2 from Manthai River
(including) to Bhatatira and Track linking and OHE works for Phase-1B for new main line from DTY to Manthai River with new Loop
lines at Bansara & DTY and Upgradation of existing loop line to Main Line at Gurdaspur yard on Bhadrak- Dhamra Port Non-
Government Railway System of Dhamra Port Company Ltd. at Dhamra, Odisha.

Client - Howe Engineering Projects (I) Ltd.

Contractor - KEC International Ltd.

Package:- Phase-2

RFI No.: Document No.:

Bridge No.: Date:

Drawing No.:

Sl. No. Description Ok / Not Ok Remarks

1 Materials availability

2 Materials testing complete

3 Formation slope checked

4 Backing Material Laid as per slope

5 Stone placing as per gradient

6 Mortar filling as per specification

7 Strip PCC as per line and level

8 Adequate Curing done

KEC Representative HOWE Representative

Sign Sign Sign

Date Date Date

Name Name Name