1.SEDA - General Info EACG RMK-12 For MAREEM
1.SEDA - General Info EACG RMK-12 For MAREEM
1.SEDA - General Info EACG RMK-12 For MAREEM
Executing
ESCO
Ministry Building
Coordinator or Energy Service Company
Installation Owner Must be registered with
Implementing ST (Peninsular & Sabah)
Agency EIU (Sarawak)
ELECTRICITY NOT A PREVIOUS
USAGE EACG APPLICANT
ELIGIBILITY Open to any commercial AGREED TO
and industrial Not eligible for any
installation with installation which has APPOINT PERSON
minimum monthly received a grant from IN CHARGE
consumption the previous Energy
100,000 kWh/month Audit Conditional Grant
ENERGY AUDIT PHASE IMPLEMENTATION PHASE
(2 months) (3 years)
TERMS AND
CONDITIONS
Implementation > Grant
Energy
Audit
= 2 months Cost Applied
BENEFITS
RECOGNITION - GreenPASS Certification
Chaired by Chaired by Return in
SEDA NRECC 1 month
WHOLE
PROCESS Evaluation Technical Steering Offer Contract
20% Grant
Committee Committee Committee Letter Agreement
(1/2)
Invoice or Surat
Chaired by Return in Permohonan
ST 7 days Penyaluran Geran
ESCO
OWNER
SEDA
ESM Implementation
WHOLE
PROCESS Energy Monitoring Monitoring Monitoring Contract
80% Grant
Audit Report 1st Year 2nd Year 3rd Year Ended
(2/2)
ESCO appointment
ended here
Invoice or Surat
Permohonan 1. Investment > Grant
Penyaluran Geran 2. Achieved % savings
CASE STUDY (Industrial Sector)
Installation Review
Installation Name Factory A
Annual Electricity
Consumption (kWh) 2021 5,451,816.00 kWh
CASE STUDY Load Apportioning
Air-Cond/Process
Cooling
18% Lighting
1%
Fan & Blower
10%
ESM 3 – Leak test and repair leak for compressed air system 12,498.90 4,437.11 5.09 % 0.23 % 7.99
ESM 4 – Install new VFD to reduce speed for dust collector P3 40,789,84 14,480.39 7.63 % 0.75 % 26.06
ESM 5 – Replace existing AHU motor with higher 16,027.92 5,689.91 1.63 % 0.29 % 10.24
No Cost Measures
Building Review
Building Name Hotel A
Annual Electricity
Consumption (kWh) 2017 5,976,718.00 kWh
No Cost Measures
ESM 1 – Motor operation efficiency check for AHU 9,775.00 2,187.55 0.16 % 6.83
ESM 2 – Increase chilled water set point at Chiller 1 33,945.00 7,597.00 0.57 % 23.56
ESM 3 – Reschedule 3 nos of corridor AHU operating hours & install timer 67,871.00 15,189.49 1.14 % 47.1
ESM 4 - Retrofitting Fluo T8 18W to LED surface mounted 12W 21,304.00 4,767.91 0.36 % 14.78
ESM 5 - Retrofitting PAR38 Halogen 120W to PAR LED 17W 15,833.00 3,879.12 0.26 % 10.99
ESM 6 - Installation of VSD at Chilled Water Pumps (CHWP) 1 32,779.00 7,335.96 0.55 % 22.75
ESM 7 - Establish of Sustainability Energy Management Systems (SEMS) 107,581.00 30,476.91 1.80 % 74.66
ESM 8 - Retrofitting pf existing E14 Incandescent 25W to LED 2.3W 36,445.00 8,929.10 0.61 % 25.29
ESM 9 - Retrofitting of existing M16 Halogen 50W to M16 LED 5W 98,952.00 22,145.38 1.66 % 68.67
ESM 10 - Retrofitting of existing chiller 3 to Energy efficient chiller 554,543.00 124,106.73 9.28 % 384.85
No Cost Measures
176,260,012
136,607,374
86,412,291
24,949,972
59,878,655
33,527,944
17,169,012
5,955,026
FOR OR
INQUIRIES Contact us at:
Officer Email Number
Zulkhairee [email protected] 018-9485525