Software Processes
1
Topics covered
• Software process models
• Process iteration
• Process activities
• The Rational Unified Process
• Computer-aided software engineering
• Coping with change
• Process improvement
2
The software process
• A structured set of activities required to develop a
software system
– Specification;
– Design;
– Validation;
– Evolution.
• A software process model is an abstract
representation of a process.
– A description of a process from some particular
perspective.
3
Software process descriptions
• the activities in the process: specifying a data
model, designing a user interface, etc.
• the ordering of these activities
• products (artifacts): outcomes of activities
• roles: the responsibilities of the people
• pre- and postconditions of the activity
• other meta-concepts to describe the process
model
4
Plan-driven and agile processes
• Plan-driven processes:
– activities are planned in advance
– progress is measured against this plan
• agile processes:
– planning is incremental
– easier to change the process to reflect changing
customer requirements
• most practical processes include elements of
both plan-driven and agile approaches
• no right or wrong software processes
5
Generic software process models
• The waterfall model (plan-driven)
– Separate and distinct phases of specification and
development.
• Incremental development (plan-driven & agile)
– Specification, development and validation are
interleaved. (evolutionary development)
• Integration and configuration (plan-driven & agile)
– The system is assembled from existing components.
• There are many variants of these models
6
Waterfall model
Requirements
definition
System and
software
design
Implementation
and unit testing
Integration and
system testing
Operation and
maintenance
7
Waterfall model problems
• Difficult to respond to changing customer
requirements.
– Because of the partitioning of the project into
distinct stages
• Only appropriate when the requirements are
well-understood and changes will be fairly limited
during the development process.
– Few business systems have stable requirements.
– Mostly used for large systems engineering projects
where a system is developed at several sites.
8
Incremental development
• Exploratory development
– Objective is to work with customers and to evolve a
final system from an initial outline specification.
• Start with well-understood requirements and
• Add new features as proposed by the customer.
• Throw-away prototyping
– Objective is to understand the system requirements.
• Should start with poorly understood requirements to
clarify what is really needed.
9
Incremental development
Concurrent
activities
Outline Intermediate
Intermediate
description Development Intermediate
version
version
version
Final version
Validation
10
Incremental development benefits
11
Incremental development problems
• Lack of process visibility
• Systems are often poorly structured
• Require special skills
▪ Eg. Rapid prototyping language
• Applicability
– For small or medium-size interactive systems
– For parts of large systems (e.g. the user interface)
– For short-lifetime systems
12
Integration and configuration
(component-based SE)
• Based on systematic reuse
– Systems are integrated from existing components or
COTS (Commercial-off-the-shelf) systems.
• Process stages
– Component analysis
– Requirements modification
– System design with reuse
– Development and integration
• This approach is becoming increasingly used as
component standards have emerged.
13
Types of reusable software
• Stand-alone application systems (COTS): configured
for use in a particular environment
• Collections of objects (as a package): integrated
with a component framework such as .NET or J2EE
• Web services: service standards and available for
remote invocation
14
Reuse-oriented development
15
Advantages and disadvantages
• Reduced costs and risks as less software is
developed from scratch
• Faster delivery and deployment of system
• But requirements compromises are inevitable so
system may not meet real needs of users
• Loss of control over evolution of reused system
elements
16
Process activities
Specification
Design and implementation
Validation
Evolution
17
The requirements engineering process
Requirements
elicitation &
analysis
Requirements
specification
Requirements
validation
User and
System
system
descriptions
requirements
Requirements
documents
18
Software specification
• The process of establishing what services are
required and the constraints on the system’s
operation and development.
• Requirements engineering process
– Requirements elicitation and analysis;
– Requirements specification;
– Requirements validation.
19
Software design and implementation
• The process of converting the system
specification into an executable system.
• Software design
– Design a software structure that realises the
specification;
• Implementation
– Translate this structure into an executable program;
• The activities of design and implementation are
closely related and may be inter-leaved.
20
A general model of the design process
21
Design process activities
• Architectural design
• Database design
• Interface design: interaction between components
• Component selection and design
22
System implementation
• Implementation: either by developing a program or
programs or by configuring an application system.
• Design and implementation are interleaved activities
for most types of software system.
• Programming is a personal activity - there is no
generic programming process.
• Debugging: finding program faults and correcting
them
23
Software validation
• Verification and validation (V&V) is intended to
show that a system
– conforms to its specification and Verification
– meets the requirements
of the system customer. Validation
• Involves checking and review processes and
system testing.
– Testing involves executing the system with test cases
that are derived from the specification.
24
Stages of testing
25
Testing stages
• Component or unit testing
– Individual components are tested independently;
– Components: functions or objects or coherent
groupings of these entities.
• System testing
– Testing of the system as a whole.
– Checking emergent properties
• Acceptance testing (customer testing)
– Testing with customer data to check that the system
meets the customer’s needs.
26
Testing phases in a plan-driven process
System Sybsystem
Acceptance
integration integration
test
test test
Service
27
Software evolution
• Software is inherently flexible and can change.
• As requirements change through changing
business circumstances, the software that
supports the business must also evolve and
change.
• Although there has been a demarcation between
development and evolution (maintenance) this is
increasingly irrelevant as fewer and fewer
systems are completely new.
28
System evolution
Propose
Define system Assess existing Modify
system
requirements systems systems
changes
Existing New
systems system
29
The Rational Unified Process
• A modern process model derived from the work
on the UML and associated process.
• Normally described from 3 perspectives
– A dynamic perspective that shows phases over time;
– A static perspective that shows process activities;
– A practive perspective that suggests good practice.
30
RUP phase model
31
RUP phases
• Inception
– Establish the business case
for the system.
• Elaboration
– Develop an understanding of
the problem domain and the
system architecture.
• Construction
– System design, programming
and testing.
• Transition
– Deploy the system in its
operating environment.
32
RUP good practice
• Develop software iteratively
• Manage requirements
• Use component-based architectures
• Visually model software
• Verify software quality
• Control changes to software
33
Static workflows
Workflow Description
Business modelling The business processes are modelled using business use cases.
Requirements Actors who interact with the system are identified and use cases are developed to
model the system requirements.
Analysis and design A design model is created and documented using architectural models, component
models, object models and sequence models.
Implementation The components in the system are implemented and structured into
implementation sub-systems. Automatic code generation from design models helps
accelerate this process.
Test Testing is an iterative process that is carried out in conjunction with
implementation. System testing follows the completion of the implementation.
Deployment A product release is created, distributed to users and installed in their workplace.
Configuration and This supporting workflow managed changes to the system (see Chapter 29).
change mgnt
Project This supporting workflow manages the system development (see Chapter 5).
management
Environment This workflow is concerned with making appropriate software tools available to the
software development team. 34
Computer-aided software engineering
37
Functional tool classification
Tool type Examples
Planning tools PERT tools, estimation tools, spreadsheets
Editing tools Text editors, diagram editors, word processors
Change management tools Requirements traceability tools, change control systems
Configuration management Version management systems, system building tools
tools
Prototyping tools Very high-level languages, user interface generators
Method-support tools Design editors, data dictionaries, code generators
Language-processing tools Compilers, interpreters
Program analysis tools Cross reference generators, static analysers, dynamic
analysers
Testing tools Test data generators, file comparators
Debugging tools Interactive debugging systems
Documentation tools Page layout programs, image editors
Re-engineering tools Cross-reference systems, program re-structuring systems
38
Activity-based tool classification
Re-eng in eering to ols
Testin g too ls
Debugg in g too ls
Co nfiguratio n
management too ls
Do cumentatio n to ols
Editing to ols
39
CASE integration
• Tools
– Support individual process tasks such as design
consistency checking, text editing, etc.
• Workbenches
– Support a process phase such as specification or design,
Normally include a number of integrated tools.
• Environments
– Support all or a substantial part of an entire software
process. Normally include several integrated
workbenches.
40
Tools, workbenches, environments
CASE
techn olo g y
M ulti-meth od Sin gle-metho d Gen er al-p urp ose Lan gua ge-specific
wo rk ben ch es wo rk ben ch es wo rk ben ch es wo rk ben ch es
41
Coping with change
42
Coping with change
• Change is inevitable in all large software projects.
– Business changes lead to new and changed system
requirements
– New technologies open up new possibilities for
improving implementations
– Changing platforms require application changes
• Change leads to rework so the costs of change
include both rework (e.g. re-analysing
requirements) as well as the costs of
implementing new functionality
43
Reducing the costs of rework
• Change anticipation, where the software process
includes activities that can anticipate possible changes
before significant rework is required.
– For example, a prototype system may be developed to show
some key features of the system to customers.
• Change tolerance, where the process is designed so that
changes can be accommodated at relatively low cost.
– This normally involves some form of incremental
development. Proposed changes may be implemented in
increments that have not yet been developed. If this is
impossible, then only a single increment (a small part of the
system) may have be altered to incorporate the change.
44
Coping with changing requirements
• System prototyping, where a version of the
system or part of the system is developed quickly
to check the customer’s requirements and the
feasibility of design decisions. This approach
supports change anticipation.
• Incremental delivery, where system increments
are delivered to the customer for comment and
experimentation. This supports both change
avoidance and change tolerance.
45
Software prototyping
• A prototype is an initial version of a system used
to demonstrate concepts and try out design
options.
• A prototype can be used in:
– The requirements engineering process to help with
requirements elicitation and validation;
– In design processes to explore options and develop
a UI design;
– In the testing process to run back-to-back tests.
46
Benefits of prototyping
• Improved system usability.
• A closer match to users’ real needs.
• Improved design quality.
• Improved maintainability.
• Reduced development effort.
47
The process of prototype development
48
Prototype development
• May be based on rapid prototyping languages or
tools
• May involve leaving out functionality
– Prototype should focus on areas of the product that
are not well-understood;
– Error checking and recovery may not be included in
the prototype;
– Focus on functional rather than non-functional
requirements such as reliability and security
49
Throw-away prototypes
• Prototypes should be discarded after
development as they are not a good basis for a
production system:
– It may be impossible to tune the system to meet
non-functional requirements;
– Prototypes are normally undocumented;
– The prototype structure is usually degraded through
rapid change;
– The prototype probably will not meet normal
organisational quality standards.
50
Incremental delivery
• Rather than deliver the system as a single delivery,
the development and delivery is broken down into
increments with each increment delivering part of
the required functionality.
• User requirements are prioritised and the highest
priority requirements are included in early
increments.
• Once the development of an increment is started,
the requirements are frozen though requirements for
later increments can continue to evolve.
51
Incremental development and delivery
• Incremental development
– Develop the system in increments and evaluate each
increment before proceeding to the development of the next
increment;
– Normal approach used in agile methods;
– Evaluation done by user/customer proxy.
• Incremental delivery
– Deploy an increment for use by end-users;
– More realistic evaluation about practical use of software;
– Difficult to implement for replacement systems as increments
have less functionality than the system being replaced.
52
Incremental delivery
53
Incremental delivery advantages
• Customer value can be delivered with each
increment so system functionality is available
earlier.
• Early increments act as a prototype to help elicit
requirements for later increments.
• Lower risk of overall project failure.
• The highest priority system services tend to
receive the most testing.
54
Incremental delivery problems
• Most systems require a set of basic facilities that are
used by different parts of the system.
– As requirements are not defined in detail until an
increment is to be implemented, it can be hard to
identify common facilities that are needed by all
increments.
• The essence of iterative processes is that the
specification is developed in conjunction with the
software.
– However, this conflicts with the procurement model of
many organizations, where the complete system
specification is part of the system development contract.
55
Process improvement
56
Process improvement
• Many software companies have turned to
software process improvement as a way of
enhancing the quality of their software, reducing
costs or accelerating their development
processes.
• Process improvement means understanding
existing processes and changing these processes
to increase product quality and/or reduce costs
and development time.
57
Approaches to improvement
• The process maturity approach, which focuses on
improving process and project management and
introducing good software engineering practice.
– The level of process maturity reflects the extent to
which good technical and management practice has
been adopted in organizational software development
processes.
• The agile approach, which focuses on iterative
development and the reduction of overheads in the
software process.
– The primary characteristics of agile methods are rapid
delivery of functionality and responsiveness to changing
customer requirements.
58
The process improvement cycle
59
Process improvement activities
• Process measurement
– You measure one or more attributes of the software process
or product. These measurements forms a baseline that helps
you decide if process improvements have been effective.
• Process analysis
– The current process is assessed, and process weaknesses and
bottlenecks are identified. Process models (sometimes called
process maps) that describe the process may be developed.
• Process change
– Process changes are proposed to address some of the
identified process weaknesses. These are introduced and the
cycle resumes to collect data about the effectiveness of the
changes.
60
Process measurement
• Wherever possible, quantitative process data
should be collected
– However, where organisations do not have clearly defined process
standards this is very difficult as you don’t know what to measure. A
process may have to be defined before any measurement is possible.
• Process measurements should be used to
assess process improvements
– But this does not mean that measurements should drive the
improvements. The improvement driver should be the organizational
objectives.
61
Process metrics
• Time taken for process activities to be
completed
– E.g. Calendar time or effort to complete an activity
or process.
• Resources required for processes or activities
– E.g. Total effort in person-days.
• Number of occurrences of a particular event
– E.g. Number of defects discovered.
62
Capability maturity levels
63
The SEI capability maturity model
• Initial
– Essentially uncontrolled
• Repeatable
– Product management procedures defined and used
• Defined
– Process management procedures and strategies defined
and used
• Managed
– Quality management strategies defined and used
• Optimising
– Process improvement strategies defined and used
64
Key points
• Software processes are the activities involved in
producing and evolving a software system.
• Software process models are abstract
representations of these processes.
• Generic process models describe the organisation
of software processes.
o waterfall model, incremental development and
reuse-oriented software engineering.
65
Key points
• Requirements engineering is the process of developing a
software specification.
• Design and implementation processes transform the
specification to an executable program.
• Validation involves checking that the system meets to its
specification and user needs.
• Evolution is concerned with modifying the system after it
is in use.
• The Rational Unified Process is a generic process model
that separates activities from phases.
• CASE technology supports software process activities.
66
Key points
• Processes should include activities such as prototyping
and incremental delivery to cope with change.
• Processes may be structured for iterative development
and delivery so that changes may be made without
disrupting the system as a whole.
• The principal approaches to process improvement are
agile approaches, geared to reducing process overheads,
and maturity-based approaches based on better process
management and the use of good software engineering
practice.
• The SEI process maturity framework identifies maturity
levels that essentially correspond to the use of good
software engineering practice.
67