9946Z - 0657-SP-SL-PL-C-G20-002 (P3) - Proposed Levels Plan (Sheet 2 of 2)
9946Z - 0657-SP-SL-PL-C-G20-002 (P3) - Proposed Levels Plan (Sheet 2 of 2)
9946Z - 0657-SP-SL-PL-C-G20-002 (P3) - Proposed Levels Plan (Sheet 2 of 2)
072
1. All dimensions are in metres unless otherwise stated.
In accordance
withthe Construction(DesignandManagement) Regulations 31.
2. All levels are in metres. 2015,the designsand detailson this drawinghavebeenthe subjectof a 0
.00
DesignersRisk Assessment,to identifyrisks in the construction,
use, or 31
7 27m Appropriate damp proofing
3. This drawing is to be read in conjunction with all relevant Engineers and Architect's drawings, demolition of the scheme. .90
0 30. required for corner of Building 4
Specifications, Reports and Engineering Details. 30 00 due to surrounding topography
.8
It is not considered necessary for Designers to highlight obvious and/or 30 00 m
968
1:5
.7
4. Handrail to be provided where level difference is 600mm or greater common risks (such as deep excavations, manual handling and working 30 00 30.
around heavy plant) which Contractors should be familiar with, and be able .6
Drawing Key to control by good management and site practice. 6 80
30 00
.5
30 00
1 :5
3018 301
.4
30 00
Sofaras is reasonablypracticable,
therisksinherentin thedesignhavebeen 3018
0
.3
30 00
5
Indicative site boundary eliminated. Whereit hasbeenconsidered thatelimination of a risk(or part BUIL
DIN
G 04
3007
3018
0
.2 m
of a risk) is not reasonably practicable, it has been reduced. 30 109 6m
TER
SHEL
30.30.18
40 6
282
m
3018
Area where levels are amended for proposed works. Levels to remain as existing outside of this area. TER
694 1
SHEL 90
BIKE 297 0
2993
m
Significantunusualresidualrisksare identifiedon the drawingby use of a 30. :5 730
30.
30
297
3
00
1:
4
0 0 2806 2914
1:15 Gradient
2656 2806
2978
5
3011
0
10
294
90
E
RAG
0 295 STO
0 2806 BIN
2806
OUSE
This drawing has been based/developed using the following external items W/D MIL
L HO
USE
0 0
m
690
40 2915 40 2905
291 291
m
Company Drawing Date 186
60
280 0
Type 2915
30.
0
date
0
m
152
2590
29.000 Proposed contour (0.1m increments) 2806
0 0
30.
2900
0
m
562
2731 0
2749
Plan
Steps (fully in accordance with Building Regulations Part M and architect's details) Topographical Laser Jan Topographical 18.06.18 -
2 Steps survey (2D Surveys 2017 Survey 7820/1 1:5
m
use only) 405
30.
1:3
Area of no dig construction (Cell Web or similar approved) required. due to tree presence Please m
186
refer to referenced Tree Survey for details. Topographical Anthony April Topographical 17.05.18 - Site Extents 30.
survey (3D) Brooks 2018 Survey 10401-1 m
(Scale 1:1000) 6m 195
Handrails where level difference exceeds 600mm Surveys 0.1
23m
8 30.
30 .10 1 86m
DO NOT SCALE FROM THIS DRAWING Tree Survey Keen
Tree Protection17.09.18 A
July 30.
Consultants 2018
Plan
30.
3 09m
0 0 nta
l
1:5
1055-KC-XX-YTRE
.2
6m izo m
E-TPP01 86m .18 Hor 204
30 30.
30.
1
m
0
=3
Site Crossfield Sept Site Investigation08.06.18 - 186 393
m
Investigation Consulting 2017 Report 30. m 30.
FL
169
Report CCL02998.CE90
86m 30.
Flood Risk Peter Brett Aug Flood Risk 16.08.18 A
30.
1
30.
1 86m F 1:32
Assessment Associates 2018 Assessment m
43797/4001 122 6
30. 1:
0 74m
132
m 30.
30. m
DRAWINGS HAVE NOT BEEN 30.
186
3 0
1:2
.0m7
6
0m 7
m 30.
303
m
18
APPROVED, UNTIL THE DRAWINGS 30.
186
m
30. 30.
078
1:9
DETAILS SHOWN ON THIS DRAWING 30.
1:23
m
047
ARE SUBJECT TO CHANGE 86m 30.
1
30.10
0 30.
928
m 91m 1:35 m
29. 3 0.0 177
1:23
30.
1:22
003m
6m 30.
.18 1:36
30 86m m
977
m 30.
1 955
30.000
29. 29.
1:6
4
1:41
1:1 1:3
86m 9
1:6
6m 30.
1
m 30 .18
859 907
m
29. 29.
m
29.900 023
30.
1:22
1:1
1:17 6m 6m 4
.18
1:41
m 30 30 .18
4
829
1:3
29. 28m
8
29.
Minor remodelling of local levels 29.800
m m 45m
186 068 29.
8
8
:11 30. 30.
1:1
required 1 m
1:19
m 986
17m 975 843
m
29.
29.
1:6
29.
1:21
30.10 3 0.0
13m
1:6
0 1:88
9m 7
.66
29.7
00 29. 00 m
29 46m
30.00
17 29.9 988
1:
9.5
0
766
m
1: 93m m 29.
1:7
5
2 m 29. 29.
9 941
690 0m 29.
15
29.90
29. 0
29.
68
1:
:15 0 0
m 29.800 1 30.0
660
1:14
1:38
29.
04m m m
R/W 3.10m-3.40m 6 004 892
29. 30.
3
29.
1:3
1:1
m
760
m
022
m
50 0m 6 31m 0. 069 115
m
24. 25. 25. 29. 23m 3 30.
1 :40 576
m 29.
6 .00
0
29.
24.800
30
67m
24.900
25.000
25.100
25.200
9.4
25.300
25.400
25.500
2 89m
25.600
25.700
5
29.
0
25.800
.90
95m
25.900
0 1:2 29
26.000
1:12 4 1:4
29.
1:34
26.100
3
EXISTING 784
26.200
1:1
29.
26.300
1:33
1:6
26.400
00
26.500
.8
26.600
1m 8m 29
FFL=30.120
26.700
79m 59 60
1:6 29. 29.
26.800
m
799 9.5
26.900
28. 6 4 4 m
27.000
m
. 55m 599 910 0
27.200
8 4 29
2 29.
27.400
m
760
27.500
0m-0.33m
24.
27.600
m 68.1781m
760 1:6
1:14
27.700
.
27.800
24. 9
27.900
2 29
R/W 0m-0.33m
28.100
.100
0
28.200
28.300
R /W .60
28.400
28.500
R/W 3.3m 2.76 Levels to tie back as per existing, required to achieve Part M access 3m 29
43
1:11
m m
R/W
29.
28
0m/W
2 98 m 2
R/W 0.80m-0.91m 2 100
4m
0 6 29. 974
Horizontal
28. 0
28. m 28.10m 29.
7
1.0 -
30.
Horizontal
29. m
Horizontal
R/W 0m-0.86m
R
R/W 0m-0.10m 60m 60m 8
28. 0m 29. 0 590
m 414
060
m
28.
0
28.
0 060 29. 29.
28. 28. 6 R/W 0.33m-0.85m R/W 0m-0.85m
8.3
98
060
m
060
m m
060 m 60m .06
0m 2
28. 8.060m 28. 28. 8.060 28.0 28 82m
2m m-
2 2 3
m 28. 29.15
1.0/W 0
0m 060 0
29.070
28.
Horizontal
06
28.
R
m
060
28.
1:12
32
m
29.0
150
29.
29.029
060m
1:15
28.
m m m
060 060 060
28. 28. 28. 1:13
260
m
060
m
m 28.
28.
R/W 0.84m
060 m
060 60m
R/W 0.39m
28.100
28.200
28. 28. 28.
0 R/W 0.26m 1:27 78m
29.034
0
m 29.
R/W 0-0.20m
585
28.
1:67
28.984
1:2 m
048
9 29. Levels to tie back as per existing,
excavation required for
0 68m construction of permeable paving
29.
28.900
.800
1:35
1:15
28.984 28
m m
060 0m 026
28.060m 29.
15 29.
W/D 28. 1:67
29.000
28.900
28.800
28.500
28.700
28.600
28.400
28.300
28.200
28.100
28.966
1:
0 13m .109mm 68 023m
29. 29 .115 1:15
29 EXISTING 29.
29.000
28.900
8 m
060
28. R/W 0m-0.76m
m m
060 060
28. 28.
EXISTING
2 8.060
m
FFL=28.060
m
060
28. m
0m m 60m 60m 060 6 existing steps to remain
28.
06 060 8.0 8.0 28.
28. 2 2
m
060
28. m m
060 60m 060
28. 28.
0
060
m m 28.
m 28. m 060
060 60 28.
28. 2 8.0 m
060
Elev 60m 28. R/W 0m-0.35m
0 m ck
s ated 28. Elev 8.0
60 dec
k
v a ted de
ep deck at ed d 2 at ed E l e
st eck Elev
4 0
27.1000
Cellweb
Cellw
eb
27.0
26.900
26.800
DESIGN IN ABEYANCE FOR
26.7000
26.6000
26.5 00
26.4 00
FOOTPATH LINK DUE TO
26.3 00
26.2 00
26.1 00
26.0 00
PRESENCE OF FREE ZONE
25.9 00
25.8 (WHICH REQUIRES LIFTING
Bank to Hogsmill River to remain as
existing. Retaining wall to tie into LEVELS) AND PRESENCE OF
top of bank levels
FLOOD PLAIN (WHICH REQUIRES
MAINTAINING LEVELS)
METRES 2 0 2 5 15 20 25 30 35 40 45 50 General Arrangement
(Scale 1:100) Rev P3 Drawing status changed to TENDER and scale bar added. By SWF Checked TH 10.07.2019
SCALE 1:100 Rev P2 Drawing revised to suit updated levels By RF Checked GL 11.04.2019