MV-Engrace Vista-PO-07-2024-25 Saniya Steel Corporation

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PURCHASE ORDER

To Date: 04-04-24
M/s. Saniya Steel Corporation
Sy No 8, Opp To East Point Collage Purchase order no: MV/ENGRACE VISTA/PO/2024-25/07

Bidharahalli Hobli, Banglore - 48.


Credit Period 45 Days

Contact Person : MS Contact Person :


Name : Mr. Fazal Name : Mr. Ravindra
Mob No. : +91 9986745912 Mob No. : +91 9731733833
Email Id. : [email protected] Email Id. : [email protected]

Billing Address Shipping Address

Modern Ventures Project - Engrace Vista


Survey No. 73/2, Near Asset Serene Sy.No. 38/1, Kadaagrahara Village, Kadaagrahara Main Road,
Apartment, Chambenahalli Village Sarjapura, Bangalore - 562125.
Dommasandra Post, Off Sarjapura Main
Road, Bangalore, Karnataka - 562125. Location : https://maps.app.goo.gl/xqWBn4wYCuHE3EVk7
GSTIN - 29ABTFM2651F1ZW Site Contact Person:
Mr. Nayaz
Mobile : 9880777848
Subject : Purchase Order for Supply of TMT Steel FE 550 (MTC) Indent No. : 3153 Date : 27/03/2024

Sl No. Description UOM Qty Rate Amount

1 08 mm TMT Steel FE 550 (MTC) KGS 15000 ₹ 50.00 ₹ 750,000.00


2 12 mm TMT Steel FE 550 (MTC) KGS 10000 ₹ 50.00 ₹ 500,000.00
3 16 mm TMT Steel FE 550 (MTC) KGS 10000 ₹ 50.00 ₹ 500,000.00
4 20 mm TMT Steel FE 550 (MTC) KGS 10000 ₹ 50.00 ₹ 500,000.00
TOTAL 45000
Terms and Conditions SUBTOTAL ₹ 2,250,000.00
1. The rate is inclusive of GST 18%, for the above materials. DISCOUNT ₹ 0.00
2. The Rate is inclusive of loading, Transportation, and unloading.
3. The Vendor shall supply Fe 550 grade steel : Brand: MTC TMT to the site address (TAX RATE) 18%
mentioned CGST ₹ 202,500.00
below.
SGST ₹ 202,500.00
4. The Vendor shall ensure damage-free transit to our site.

₹ 2,655,000.00
5. The number of rods will be counted before or during unloading at the site.
6. The Steel has to pass all parameters of IS 1786 tested in any laboratory to be accepted TOTAL
else has to be replaced.
7. All the rods should have a standard 12 mtr length of Straight Rods.
8. The Vendor representative has to be there during unloading and has to witness the Authorized Signature
counting of rods to acknowledge the same if there is any discrepancy against the billed
quantity.
9. In the absence of a vendor representative, the quantities derived post-counting of rods
after unloading will be deemed as final, and the same will be certified.
10. Payment Terms: 45 days from the date of supply.
11. The vendor shall attach a PO copy along with the Invoice.

Prepared By : Ravikiran R

#73/2, Chambenahalli Village, Dommasandra Post, Near Asset Serene Apartment Sarjapura Main Road, Bangalore-562 125

Tel: +91 90305 05501 | [email protected] | www.modernspaaces.com

You might also like