0% found this document useful (0 votes)
70 views2 pages

1 Method Statement For Canopy Assembling

Uploaded by

Dinesh Kanukollu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
70 views2 pages

1 Method Statement For Canopy Assembling

Uploaded by

Dinesh Kanukollu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Document No.

ASPIL/HSE/PRO/01
Date 01-01-2019
Revision No. 01
Page No. Page 1 of 2

Method Statement for Canopy Structure Assembling

Purpose and scope


 To assemble the Pre-fabricated canopy structure at workstations following all Health,
safety and environment standards and as per client requirement.

Method of work
 The roof truss should be carried to the column with the help of the crane.
 The roof truss is lifted and transferred near to the column and install into the column with
the help of M16 nuts and bolts.
 Tighten the bolts for eradicating any movement of truss.
 Likewise each column is installed with 2 roof trusses and bolts are tightened.

Risk assessment
 Improper material handling may cause serious injury.
 Slip, trip and fall of hand tool or roof truss may cause serious injury.
 Collision with vehicles like crane.

Control Measure
 Provide appropriate tools for material handling.
 Training for proper material handling, loading and unloading.
 Provide proper supervision near job location.
 Training to workman on adverse effects of lifting excessive weight.
 Shall provide appropriate PPEs for all (dust mask, shoes, and helmet).
 The provision, condition and use of hand tools shall be inclusive in the HSE Inspection /
Audit Program.
 Users shall be required to inspect hand tools before use.
 Line supervisors and HSE’s shall monitor the provision, condition and use of hand tools.
 The hazards associated with hand tool usage and condition shall be covered in toolbox
talks.

Documents required
 Work permit
 Hand tools checklist
 Risk assessment
 Lifting Plan
Document No. ASPIL/HSE/PRO/01
Date 01-01-2019
Revision No. 01
Page No. Page 2 of 2

 Driving License
 Vehicle Fitness certificate.
 Insurance certificate.
Personal Protective Equipment
 Safety helmet
 Safety shoes
 Hand gloves
 Reflective jacket