AAS DS Guide Step by Step

Uploaded by

juan carlos LP
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
79 views2 pages

AAS DS Guide Step by Step

Uploaded by

juan carlos LP
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
You are on page 1/ 2

AAS DS with ECI file

1.-Waiting for MW starts.


2.-Download scripts from script release and verify if ECI file is available on ESI
portal.
3.-Perform and send Pre-checks to the market.
4.-When MW starts lock the cells on AAS node using "bls" command to lock the cells
corerctly.
5.-Once AAS is locked please load the ECI file to the AAS node using "cvput
$nodename_ECI_File.zip"
6.-Verify with "cvls" command if the ECI has been uploaded to the AAS node.
7.-Restart the AAS node with the new ECI file "acc+ backup + restore".
8.-When the AAS node came back again, please verify all the information with CIQ
"CLI part" and check if all match according to it.
9.-Enroll, set the Uri, check supervisions and Sync the AAS node.
10.Run interDU scrip on Legacy node.
11.-Lock the cells on Legacy node and perform a restart.
12.-Some times you also have InterDu scripts for anchors if this is the case please
also run it.
13.-According to the market you would have Call Test or not, if you have CT send
AAS to CT and FE must confirm if CT passed.
14.-After CT passed, each market decide if new Digital sectors must be leave locked
or unlocked.
15.-Perform integration charts.
16.-Check VSWR supervision on AAS node and NR or MMBB node.
17.-Perform and Send Post checks.
18.- Close the site.

AAS DS Manually.
1.-Waiting for MW starts.
2.-Download scripts from script release.
3.-Perform and send Pre-checks to the market.
4.-When MW starts lock the cells on AAS node using "bls" command to lock the cells
corerctly.
5.-Run the next script on AAS node
-00_$nodename_Feature_activation.mos
-01_$nodename_Add_L21_2nd_Cell.mos
-02_$nodename_1C2C_relation_noanr_create.mos
-03_$nodename_Cell_Parameter_preservation.mos
-05_$nodename_External_Neighbours.mos.
6.-Perform a restart on AAS node.
7.-When the AAS node came back again, please verify all the information with CIQ
"CLI part" and check if all match according to it.
8.-Run interDU scrip on Legacy node.
9.-Lock the cells on Legacy node and perform a restart.
10.-Some times you also have InterDu scripts for anchors if this is the case please
also run it.
11.-According to the market you would have Call Test or not, if you have CT send
AAS to CT and FE must confirm if CT passed.
12.-After CT passed, each market decide if new Digital sectors must be leave locked
or unlocked.
13.-Perform integration charts.
14.-Check VSWR supervision on AAS node and NR or MMBB node.
15.-Perform and Send Post checks.
16.- Close the site.

Pleaste take a note:


Perform CV before/after activity starts.