M-0072-01 Check List For Pipe Insulation

The document is a checklist for HVAC piping insulation for an aircraft maintenance hangars project. It has sections for document submittal, site delivery and storage, and construction. Each section includes items to check to ensure proper installation and compliance with specifications, standards, and approved documents.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views2 pages

M-0072-01 Check List For Pipe Insulation

The document is a checklist for HVAC piping insulation for an aircraft maintenance hangars project. It has sections for document submittal, site delivery and storage, and construction. Each section includes items to check to ensure proper installation and compliance with specifications, standards, and approved documents.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

THE ENGINEER: THE OWNER: THE CONTRACTOR:

THE SUB CONTRACTOR:


AIRCRAFT MAINTENANCE HANGARS PROJECT
KING ABDULAZIZ INTERNATIONAL AIRPORT - JEDDAH

Contractor: TAL JV (TAV - AL RAJHI-HLG) Checklist No.: 433-DAR-TAL-M-CL-0008-01


Contract No: 4600000433 Date of Inspection:
Contract Title: SAEI Aircraft Maintenance Hangars Project Jeddah/KSA RIW Ref. No.:

Checklist for HVAC Piping Insulation


Work Location:
Subcontractor TAL JV Engineer
DESCRIPTION QC Representative Inspector / Engineer Inspector / Engineer Remark(s)
Pass Fail Pass Fail Pass Fail

I. Document submittal
HVAC piping insulation material including pipe
1 insulation, adhesives, sealants, paints, securements
and identifications, is approved by the Engineer

2 Method of statement is approved by the Engineer

Shop drawings are available with approval from the


3
Engineer
II. SITE DELIVERY AND STORAGE
Delivered insulation material including pipe insulation,
adhesives, sealants, paints, securements and
1
identifications are QC inspected and approved from the
Engineer.

Insulation material is handled and stored properly


2
according to the manufacturer's recommendation.

III. Construction

Insulation type is as per the approved schedule (cellular


1
glass or elastomeric)

The insulation thickness, facing, model and density are


2
in accordance with the specification

3 Surface preparation is done properly

Adhesive application is done according to method of


4
statement

5 Sealants are applied properly

6 Gaps and protursions are filled properly with sealant

The insulation is properly fitted and secured to the


7
pipes and all joints are closely butted and sealed

The insulation is done properly at all hangers, suppots,


8
valvesand specialties

All vapor barriers are the correct type, thickness,


9
continuous and complete

Insulation finish (paint) is applied properly, uniform and


10
free of defects

11 Pipe labels are installed properly as required

Page 1 of 2
THE ENGINEER: THE OWNER: THE CONTRACTOR:

THE SUB CONTRACTOR:


AIRCRAFT MAINTENANCE HANGARS PROJECT
KING ABDULAZIZ INTERNATIONAL AIRPORT - JEDDAH

Contractor: TAL JV (TAV - AL RAJHI-HLG) Checklist No.: 433-DAR-TAL-M-CL-0008-01


Contract No: 4600000433 Date of Inspection:
Contract Title: SAEI Aircraft Maintenance Hangars Project Jeddah/KSA RIW Ref. No.:

Checklist for HVAC Piping Insulation


Work Location:
Subcontractor TAL JV Engineer
DESCRIPTION QC Representative Inspector / Engineer Inspector / Engineer Remark(s)
Pass Fail Pass Fail Pass Fail
Comments: Comments:

Subcontractor Representative TAL JV QC Engineer / Inspector


Name: Name:
Position: Position:
Signature: Signature:
Date: Date:
Comments:

THE ENGINEER's Representative


Name:
Position:
Signature:
Date: