0% found this document useful (0 votes)
8 views9 pages

Combined Footing

Uploaded by

ChinuMahi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views9 pages

Combined Footing

Uploaded by

ChinuMahi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 9

BGR ENERGY SYSTEMS LTD

ELECTRICAL PROJECTS DIVISION


PROJECT TITLE
KUDANKULAM NUCLEAR POWER PROJECT - 3 & 4
DOCUMENT NO
REV
GID-379-CV-UAD-CA-2203
DESIGN OF FOUNDATION FOR 230kV OUTDOOR GIBD SUPPORT STRUCTURE R0

6.0 DESIGN OF FOUNDATION Designation of Footing - CF1


6.2.1 CHECK FOR SOIL BEARING PRESSURE FOR COMBINED FOOTING Designation of Footing - CF1
Design Data Geotechnical Data Characteristic Strength of Materials
Length of the footing along X, Lx = 2150 mm Unit weight of soil, gs = 18 kN/m3 Grade of Concrete, fck = 30 N/mm2
Length of the footing along Y, Ly = 1350 mm Allowable Net SBC of Soil, g n, sbc = 250 kN/m2 Grade of Reinf.steel, fy = 500 N/mm2
Thickness of the footing, D = 450 mm Depth of footing from NGL, FD = 6.200 m (16.2-10) Sketch
Length of C1 along X, C1x = 450 mm Overburden Pressure, OP = 18 x 6.2 = 111.6 kN/m 2
X
Length of C1 along Y, C1y = 450 mm Allowable Gross SBC of Soil, g g, sbc = g n, sbc + OP = 250 + 111.6

675
Length of C2 along X, C2x = 450 mm = 361.6 kN/m2 (Long Term)
Length of C2 along Y, C2y = 450 mm C2
Finished Floor Level, FFL (+) RL = 13.41 m For Short Term Load Combination,
Finished ground Level, FGL (+) RL = 12.85 m Allowable Net SBC of Soil, g n, sbc = 1.25 (g n, sbc) = 1.25 x 250

800
M

2150
Founding Level, (+) RL = 10.00 m = 312.5 kN/m2 Y Y o
Surcharge = 20.00 kN/m2 Allowable Gross SBC of Soil, g g, sbc = g n, sbc + OP = 312.5 + 111.6 d
i
Avg. Height of Soil above Footing, TOF = 2.40 m = 424.1 kN/m2 (Short Term) f
[12.85 -(10 )- (0.45) ] . C1 i
e

675
Section Modulus about X, Zx = Lx Ly2 / 6 = 0.65 m3 d
Self weight of footing,Wf = 25 x 2.15 x 1.35 x (0.45 ) = 32.65 kN Section Modulus about Y, Zy = Ly Lx2 / 6 = 1.04 m3
b
Avg. Height of Soil above Footing, Hs = 2.400 m Max. Pr Fx Fy Fz Mx My Mz X
Joint L/C e
Weight of Soil above footing, Ws = 107.89 kN (kN/m2) (kN) (kN) (kN) (kN-m) (kN-m) (kN-m) 675 675 a
r
Surcharge = 49.95 kN
135.56 - 129 8.400 0.400 8.600 2.764 65.244 0.000 i
Total Load Wt = 190.5 kN 1350 n
g

p
Loads from Design Force / Moment Maximum base Pressure at four edges of the footing Loss of contact
r
Case Load Combination SBC Check e
Fx (kN) Fy (kN) Fz (kN) Mx (kNm) My (kNm) Mz (kNm) P (kN) Mx (kNm) My (kNm) P1 (kN/m2) P2 (kN/m2) P3 (kN/m2) P4 (kN/m2) % Check s
### s
u
Max Fx 129 8.40 0.40 8.60 2.76 65.24 0.00 199.1 2.8 65.2 135.56 10.10 127.09 1.63 SAFE 0.00 SAFE ### r
e
Min Fx 141 -8.40 -0.40 7.40 -2.76 -65.24 0.00 197.9 2.8 65.2 135.14 9.68 126.68 1.22 SAFE 0.00 SAFE ###
(
Max Fy 108 -1.00 2.00 7.00 7.82 -6.41 0.00 197.5 7.8 6.4 86.18 73.85 62.23 49.90 SAFE 0.00 SAFE ### k
N
/
Min Fy 106 -1.00 -2.00 9.00 -9.82 -6.41 0.00 199.5 9.8 6.4 89.93 77.61 59.86 47.53 SAFE 0.00 SAFE ### m
2

Max Fz 124 1.40 -0.40 14.40 -2.76 8.77 0.00 204.9 2.8 8.8 83.26 66.39 74.80 57.92 SAFE 0.00 SAFE ### )

Min Fz 148 -3.80 0.40 1.60 1.16 -26.76 0.00 192.1 1.2 26.8 93.69 42.24 90.13 38.67 SAFE 0.00 SAFE ###

Max Mx 109 1.00 2.00 7.00 9.82 6.41 0.00 197.5 9.8 6.4 89.24 76.92 59.17 46.84 SAFE 0.00 SAFE ###

Min Mx 106 -1.00 -2.00 9.00 -9.82 -6.41 0.00 199.5 9.8 6.4 89.93 77.61 59.86 47.53 SAFE 0.00 SAFE ###

Max My 129 8.40 0.40 8.60 2.76 65.24 0.00 199.1 2.8 65.2 135.56 10.10 127.09 1.63 SAFE 0.00 SAFE ###

Min My 141 -8.40 -0.40 7.40 -2.76 -65.24 0.00 197.9 2.8 65.2 135.14 9.68 126.68 1.22 SAFE 0.00 SAFE

Note:
As per NPCIL soil report vide page no: 16 of 21 - BH-08, natural ground level is at RL +16.285 m level. Hence to consider the overburden effect on the Net SBC, the height difference for calculating gross SBC from net SBC is considered
as RL +16.2 to founding depth of RL +10.00 m level - i.e 6.20 m
BGR ENERGY SYSTEMS LTD
ELECTRICAL PROJECTS DIVISION
PROJECT TITLE
KUDANKULAM NUCLEAR POWER PROJECT - 3 & 4
DOCUMENT NO
REV
GID-379-CV-UAD-CA-2203
DESIGN OF FOUNDATION FOR 230kV OUTDOOR GIBD SUPPORT STRUCTURE R0

6.2.2 DESIGN OF COMBINED FOOTING Footing ID - CF1

Design Data: Characteristic Strength of Materials:

Length along X direction, lx = 2150 mm Grade of Concrete, fck = 30 N/mm2


Length along Y direction, ly = 1350 mm Grade of Reinf.steel, fy = 500 N/mm2
Thickness of the footing, D = 450 mm Density of Soil, gs = 18 kN/m3
Finished Floor Level, FFL = 13.41 m (+) RL
Finished ground Level, FGL = 12.85 m (+) RL x
Depth of footing from FGL D = 2.85 m (12.85-10)

675
l2
Net Safe Bearing Capacity, gnet = 250 kN/m2 C2
C1 Size along X dir. lx1' = 450 mm
C1 Size along Y dir. ly1' = 450 mm y y lx

800
C2 Size along X dir. lx2' = 450 mm
C2 Size along Y dir. ly2' = 450 mm

l3
Calculations:
C1

675
l1
Design data from SBC Check,
x

Max. Pr Mx My Mz ly
(kN/m2) Jt L/C Fx (kN) Fy (kN) Fz (kN) (kN-m) (kN-m) (kN-m)

135.56 - 129 8.40 0.40 8.60 2.76 65.24 0.00

Force in X dir, Fx = 13.440 kN


Force in Y dir, Fy = 0.640 kN
Force in Z dir, Fz = 13.760 kN
Moment about X dir, Mx = 4.420 kNm
Moment about Y dir, My = 104.390 kNm
Moment about Z dir, Mz = 0.000 kNm
(Forces and Moments considered for design are taken from above table with a factor of 1.6 for the conservative side)

Section modulus of footing, Zx = lx ly2 / 6 = 0.65 m3


Zy = ly lx2 / 6 = 1.04 m3
Area of Footing, A = 2.15 x 1.35 = 2.9025 m2
kN
Selfweight of Footing = 25 x 2.15 x 1.35 x (0.45) = 32.65 kN
Ave. Height of soil on footing projection = 2.40 m
Weight of soil on footing projection = 18 x ( (2.15 x 1.35)-((0.45 x 0.45 )+(0.45x0.45 ) x 2.4 = 107.89 kN
Surcharge load = 20 kN/m2
= 20 x ( (2.15 x 1.35)-((0.45 x 0.45 )+(0.45x0.45 ) = 49.95 kN

Total weight = 32.65 + 107.89 + 49.95 = 190.49 kN

Eccentricity along X-axis = 0.000 m


Eccentricity along Y-axis = = 0.000 m
Additional moment about X-axis = 0x318.54 = 0.000 kN-m
Additional moment about Y-axis = 0x318.54 = 0.000 kN-m

Design Force of Footing in vertical dir., P = 13.76 + 1.6x32.65 +1.6x(107.89+49.95) = 318.54 kN


Design moment about X-axis, Mx = (4.42) + (0) = 4.42 kN-m
Design moment about Y-axis, My = (104.39) + (0) = 104.39 kN-m
On the conservative side, the footing is designed for the maximum net soil pressure acting as uniform throughout the foundation.
Design soil pressure for footing, w = (318.54 / 2.9025) + (4.42 / 0.65) + (104.39 / 1.04) = 216.92 kN/m2
(P/A)+(Mx/Zx)+(My/Zy)

Design of footing along Y direction;


Cantilever length of footing along Y direction, lyy = ( ly - ly' ) / 2 Clear cover = 50 mm
BGR ENERGY SYSTEMS LTD
ELECTRICAL PROJECTS DIVISION
PROJECT TITLE
KUDANKULAM NUCLEAR POWER PROJECT - 3 & 4
DOCUMENT NO
REV
GID-379-CV-UAD-CA-2203
DESIGN OF FOUNDATION FOR 230kV OUTDOOR GIBD SUPPORT STRUCTURE R0

= 450 mm Effective depth of footing at


Max Bending Moment at face of column,/L Muy = ( w lyy2 ) / 2 column face,
= 21.963 kNm d = 450 - 50 - (16/2)
Therefore, Muy / bd2 = 0.140 pt = 0.032 % = 392 mm
Design steel reinforcement, Ast = 125 mm2 pt, min = 0.18 %

Ast required along Y direction Ast req. = 810 mm2 Ast, min = 810 mm2

Provide Y 16 @ 200 c/c along Y direction at bottom Ast provided = 1005 mm2 OK

Top Reinforcement
pt, min = 0.12 %
Ast, min = 540 mm2

Ast required along Y direction Ast req. = 540 mm2

Provide Y 12 @ 200 c/c along Y direction at top Ast provided = 565 mm2 OK

Design of footing along X direction:


Cantilever length of footing along X direction, lxx' = Max( l1-lx1'/2),(l2-lx2'/2) Clear cover = 66 mm
= 450 mm Effective depth of footing at
Max Bending Moment at face of column, Mux = ( w lxx2 ) / 2 column face,
= 21.963 kNm d = 450 - 66 - (16/2)
Therefore, Mux / bd2 = 0.16 pt = 0.037 % = 376 mm
Design steel reinforcement, Ast = 139 mm2 pt, min = 0.18 %

Ast required along X direction Ast req. = 810 mm2 Ast, min = 810 mm2

Provide Y 16 @ 200 c/c along X direction at bottom Ast provided = 1005 mm2 OK

Top Reinforcement
Distance between supports along X direction, l3' = 350 mm Clear cover = 66 mm
Effective depth of footing at
Max Bending Moment at face of column, Mux = 𝑤/2 column face,
( 〖𝑙 3′ 〗 ^2/4−
〖𝑙𝑧𝑧〗 ^2 )
= -18.642 kNm d = 450 - 66 - (12/2)
Therefore, Mux / bd2 = 0 pt = 0% = 378 mm
Design steel reinforcement, Ast = 0 mm2 pt, min = 0.12 %

Ast required along X direction Ast req. = 540 mm2 Ast, min = 540 mm2

Provide Y 12 @ 200 c/c along X direction at top Ast provided = 565 mm2 OK

Check for One Way Shear at a distance 'd' (effective depth) from face of column:

Along X direction: 392


Effective depth at critical section, d = 392 mm CXn 58

AERB/SS/CSE-1 - Cl. 3.6.2


Shear strength of concrete, tc = (1/gc) R(fk) = 0.657 N/mm2
R(fk) = [0.18 d (fck) ]
1/2
0.18 x 1 x ^0.5 = 0.986 N/mm2
tc(max) = (1/gc) 0.88((fck)1/2 (1/1.5)x0.88x30^0.5 = 3.213 N/mm2
CXn
Bending moment @ section, M (216.92 x (0.058) ^ 2) / 2 = 0.365 kNm
tan b = 0
Shear force acting along CXn / metre, Vux = 216.92 x 0.058
= 12.581 kN
Shear stress developed / metre, tv = (Vux - (M/d) tan b ) / bd
= 0.032 N/mm2 < 0.657 Hence OK
< 3.213
BGR ENERGY SYSTEMS LTD
ELECTRICAL PROJECTS DIVISION
PROJECT TITLE
KUDANKULAM NUCLEAR POWER PROJECT - 3 & 4
DOCUMENT NO
REV
GID-379-CV-UAD-CA-2203
DESIGN OF FOUNDATION FOR 230kV OUTDOOR GIBD SUPPORT STRUCTURE R0

Along Y direction: 376


Effective depth at critical section, d = 376 mm CXn 74.00

AERB/SS/CSE-1 - Cl. 3.6.2


Shear strength of concrete, tc = (1/gc) R(fk) = 0.657 N/mm2
R(fk) = [0.18 d (fck) ]
1/2
0.18 x 1 x 30^0.5 = 0.986 N/mm2
tc(max) = (1/gc) 0.88((fck)1/2 (1/1.5)x0.88x30^0.5 = 3.213 N/mm2
CXn
Bending moment @ section, M (216.92 x (0.074) ^ 2) / 2 = 0.594 kNm
tan b = 0

Shear force acting along CXn / metre, Vuy = 216.92 x 0.074


= 16.052 kN
Shear stress developed / metre, tv = (Vuy - (M/d) tanb ) / bd
= 0.043 N/mm2 < 0.657 Hence OK
< 3.213

Check for Two way Shear


Critical section lies at a distance d/2 from the periphery of the column where d is the effective depth of slab
Permissible shear stress, ks tc where, ks = (0.5 + bc), but not greater than 1. tc = 0.25 fck
bc = Ratio of short side to long side of column = 450 / 450 = 1
ks = 1 tc = 1.37 N/mm2
Permissible shear stress = 1.37 N/mm2
Punching force, Vtws =(Fz) = 13.76 kN
Effective depth of slab , = 392 mm
Perimeter of critical section, bo = (2 x (450 + 392)) + (2*(450 + 392)) = 3368 mm
Punching shear stress, tv, tws = Vtws / (bod) = 0.01 N/mm2 < 1.37 N/mm2 Hence OK

Check for Overturning

About X axis
Overturning Moment about X axis, Mxo = = 2.76 kNm
Restoring Moment about X axis, Mxr = (0.9xP ly)/2 = 120.95 kNm
Factor of safety = Mxr / Mxo = 43.78 > 1.5 ; Hence OK

About Y axis
Overturning Moment about Y axis, Myo = = 65.2 kNm
Restoring Moment about Y axis, Myr = (0.9xP lx)/2 = 192.62 kNm
Factor of safety = Myr / Myo = 2.95 > 1.5 ; Hence OK

Check for Uplift

Uplift force (9.81x2.15x1.35x2.85) = 81.1 kN


Resisting force (0.9xP) = 0.9 x 318.54 / 1.6 = 179.2 kN
Factor of safety against uplift = 2.2 > 1.2 Hence OK
BGR ENERGY SYSTEMS LTD
ELECTRICAL PROJECTS DIVISION
PROJECT TITLE
KUDANKULAM NUCLEAR POWER PROJECT - 3 & 4
DOCUMENT NO
REV
GID-379-CV-UAD-CA-2203
DESIGN OF FOUNDATION FOR 230kV OUTDOOR GIBD SUPPORT STRUCTURE R0
BGR ENERGY SYSTEMS LTD
ELECTRICAL PROJECTS DIVISION
PROJECT TITLE
KUDANKULAM NUCLEAR POWER PROJECT - 3 & 4
DOCUMENT NO
REV
GID-379-CV-UAD-CA-2203
DESIGN OF FOUNDATION FOR 230kV OUTDOOR GIBD SUPPORT STRUCTURE R0

6.2 a COMBINED FOOTING- FORCES & SUMMARY (AT BOTTOM OF RAFT C.G)

Design forces for frame elements - Refer Annexure 1a for force extraction

a). For Load Point LP-711

Case L/C Fx Fy Fz Mx My Mz
Max Fx 128 8.00 -0.40 10.40 -0.76 58.28 0.00
Min Fx 140 -8.00 0.40 5.60 0.76 -58.28 0.00
Max Fy 108 -1.00 2.00 7.00 7.82 -6.41 0.00
Min Fy 106 -1.00 -2.00 9.00 -9.82 -6.41 0.00
Max Fz 124 1.80 -0.40 13.40 -2.76 14.34 0.00
Min Fz 148 -3.80 0.40 2.60 0.76 -27.16 0.00
Max Mx 109 1.00 2.00 7.00 9.82 6.41 0.00
Min Mx 106 -1.00 -2.00 9.00 -9.82 -6.41 0.00
Max My 128 8.00 -0.40 10.40 -0.76 58.28 0.00
Min My 140 -8.00 0.40 5.60 0.76 -58.28 0.00

b). For Load Point LP-710

Case L/C Fx Fy Fz Mx My Mz
Max Fx 128 8.00 -0.40 10.40 -0.76 57.28 0.00
Min Fx 140 -8.00 0.40 5.60 0.76 -57.28 0.00
Max Fy 108 -1.00 2.00 7.00 7.82 -6.41 0.00
Min Fy 106 -1.00 -2.00 9.00 -9.82 -6.41 0.00
Max Fz 124 1.80 -0.40 13.40 -2.76 13.94 0.00
Min Fz 148 -3.80 0.40 2.60 0.76 -26.76 0.00
Max Mx 109 1.00 2.00 7.00 9.82 6.41 0.00
Min Mx 106 -1.00 -2.00 9.00 -9.82 -6.41 0.00
Max My 128 8.00 -0.40 10.40 -0.76 57.28 0.00
Min My 140 -8.00 0.40 5.60 0.76 -57.28 0.00

c). For Load Point LP-709

Case L/C Fx Fy Fz Mx My Mz
Max Fx 128 8.00 -0.40 9.40 -1.16 57.28 0.00
Min Fx 140 -8.00 0.40 4.60 1.16 -57.28 0.00
Max Fy 108 -1.00 2.00 6.00 7.82 -7.41 0.00
Min Fy 106 -1.00 -2.00 8.00 -9.82 -5.41 0.00
Max Fz 124 1.80 -0.40 12.40 -3.16 13.94 0.00
Min Fz 148 -3.80 0.40 1.60 1.16 -26.76 0.00
Max Mx 109 1.00 2.00 6.00 9.82 5.41 0.00
Min Mx 106 -1.00 -2.00 8.00 -9.82 -5.41 0.00
Max My 128 8.00 -0.40 9.40 -1.16 57.28 0.00
Min My 140 -8.00 0.40 4.60 1.16 -57.28 0.00

d). For Load Point LP-308

Case L/C Fx Fy Fz Mx My Mz
Max Fx 128 8.00 -0.40 10.40 -0.76 57.88 0.00
Min Fx 140 -8.00 0.40 5.60 0.76 -57.88 0.00
Max Fy 108 -1.00 2.00 7.00 7.82 -7.41 0.00
Min Fy 106 -1.00 -2.00 9.00 -9.82 -5.41 0.00
Max Fz 124 1.80 -0.40 13.40 -2.76 13.94 0.00
Min Fz 148 -3.80 0.40 2.60 0.76 -26.76 0.00
Max Mx 109 1.00 2.00 7.00 9.82 5.41 0.00
Min Mx 106 -1.00 -2.00 9.00 -9.82 -5.41 0.00
Max My 129 8.00 0.40 9.60 2.76 58.68 0.00
Min My 141 -8.00 -0.40 6.40 -2.76 -58.68 0.00
BGR ENERGY SYSTEMS LTD
ELECTRICAL PROJECTS DIVISION
PROJECT TITLE
KUDANKULAM NUCLEAR POWER PROJECT - 3 & 4
DOCUMENT NO
REV
GID-379-CV-UAD-CA-2203
DESIGN OF FOUNDATION FOR 230kV OUTDOOR GIBD SUPPORT STRUCTURE R0

e). For Load Point LP-306

Case L/C Fx Fy Fz Mx My Mz
Max Fx 129 8.40 0.40 8.60 2.76 65.24 0.00
Min Fx 141 -8.40 -0.40 7.40 -2.76 -65.24 0.00
Max Fy 108 -1.00 2.00 8.00 7.82 -10.41 0.00
Min Fy 106 -1.00 -2.00 10.00 -9.82 -8.41 0.00
Max Fz 124 1.40 -0.40 14.40 -2.76 8.77 0.00
Min Fz 160 -1.40 0.40 1.60 2.76 -8.77 0.00
Max Mx 109 1.00 2.00 6.00 9.82 8.41 0.00
Min Mx 106 -1.00 -2.00 10.00 -9.82 -8.41 0.00
Max My 129 8.40 0.40 8.60 2.76 65.24 0.00
Min My 141 -8.40 -0.40 7.40 -2.76 -65.24 0.00

f). For Load Point LP-304

Case L/C Fx Fy Fz Mx My Mz
Max Fx 116 8.00 -0.40 10.40 -2.76 61.08 0.00
Min Fx 152 -8.00 0.40 5.60 2.76 -61.08 0.00
Max Fy 108 1.00 2.00 7.00 7.82 9.41 0.00
Min Fy 106 1.00 -2.00 9.00 -9.82 7.41 0.00
Max Fz 124 3.80 -0.40 13.40 -2.76 29.96 0.00
Min Fz 148 -1.80 0.40 2.60 0.76 -13.14 0.00
Max Mx 109 -1.00 2.00 7.00 9.82 -7.41 0.00
Min Mx 106 1.00 -2.00 9.00 -9.82 7.41 0.00
Max My 116 8.00 -0.40 10.40 -2.76 61.08 0.00
Min My 152 -8.00 0.40 5.60 2.76 -61.08 0.00

g). For Load Point LP-109

Case L/C Fx Fy Fz Mx My Mz
Max Fx 116 7.00 -0.40 10.40 -3.16 52.87 0.00
Min Fx 152 -7.00 0.40 5.60 3.16 -52.87 0.00
Max Fy 108 1.00 2.00 7.00 7.82 6.41 0.00
Min Fy 106 1.00 -2.00 9.00 -9.82 4.41 0.00
Max Fz 124 3.40 -0.40 13.40 -3.16 24.39 0.00
Min Fz 148 -1.40 0.40 2.60 1.16 -13.57 0.00
Max Mx 109 -1.00 2.00 7.00 9.82 -4.41 0.00
Min Mx 106 1.00 -2.00 9.00 -9.82 4.41 0.00
Max My 116 7.00 -0.40 10.40 -3.16 52.87 0.00
Min My 152 -7.00 0.40 5.60 3.16 -52.87 0.00

h). For Load Point LP-110

Case L/C Fx Fy Fz Mx My Mz
Max Fx 116 8.00 -0.40 10.40 -2.76 57.28 0.00
Min Fx 152 -8.00 0.40 5.60 2.76 -57.28 0.00
Max Fy 108 1.00 2.00 7.00 7.82 6.41 0.00
Min Fy 106 1.00 -2.00 9.00 -9.82 6.41 0.00
Max Fz 124 3.80 -0.40 13.40 -2.76 26.76 0.00
Min Fz 148 -1.80 0.40 2.60 0.76 -13.94 0.00
Max Mx 109 -1.00 2.00 7.00 9.82 -6.41 0.00
Min Mx 106 1.00 -2.00 9.00 -9.82 6.41 0.00
Max My 116 8.00 -0.40 10.40 -2.76 57.28 0.00
Min My 152 -8.00 0.40 5.60 2.76 -57.28 0.00
BGR ENERGY SYSTEMS LTD
ELECTRICAL PROJECTS DIVISION
PROJECT TITLE
KUDANKULAM NUCLEAR POWER PROJECT - 3 & 4
DOCUMENT NO
REV
GID-379-CV-UAD-CA-2203
DESIGN OF FOUNDATION FOR 230kV OUTDOOR GIBD SUPPORT STRUCTURE R0

i). For Load Point LP-111

Case L/C Fx Fy Fz Mx My Mz
Max Fx 116 8.00 -0.40 10.40 -2.76 58.28 0.00
Min Fx 152 -8.00 0.40 5.60 2.76 -58.28 0.00
Max Fy 108 1.00 2.00 7.00 7.82 6.41 0.00
Min Fy 106 1.00 -2.00 9.00 -9.82 6.41 0.00
Max Fz 124 3.80 -0.40 13.40 -2.76 27.16 0.00
Min Fz 148 -1.80 0.40 2.60 0.76 -14.34 0.00
Max Mx 109 -1.00 2.00 7.00 9.82 -6.41 0.00
Min Mx 106 1.00 -2.00 9.00 -9.82 6.41 0.00
Max My 116 8.00 -0.40 10.40 -2.76 58.28 0.00
Min My 152 -8.00 0.40 5.60 2.76 -58.28 0.00

SUMMARY OF FORCES FOR 9 LOAD POINTS

L/C Fx kN Fy kN Fz kN Mx kN-m My kN-m Mz kN-m


Max Fx 129 8.40 0.40 8.60 2.76 65.24 0.00
Min Fx 141 -8.40 -0.40 7.40 -2.76 -65.24 0.00
Max Fy 108 -1.00 2.00 7.00 7.82 -6.41 0.00
Min Fy 106 -1.00 -2.00 9.00 -9.82 -6.41 0.00
Max Fz 124 1.40 -0.40 14.40 -2.76 8.77 0.00
Min Fz 148 -3.80 0.40 1.60 1.16 -26.76 0.00
Max Mx 109 1.00 2.00 7.00 9.82 6.41 0.00
Min Mx 106 -1.00 -2.00 9.00 -9.82 -6.41 0.00
Max My 129 8.40 0.40 8.60 2.76 65.24 0.00
Min My 141 -8.40 -0.40 7.40 -2.76 -65.24 0.00