Module E Engine Mechanical
Module E Engine Mechanical
Competitor Instructions
Marking Summary
1. Prepare all necessary tools and equipment for measuring engine components.
B Engine Mechanical
Report Sheet
ENGINE MECHANICAL
i)
ii)
Cylinder Bore iii)
B1:
i)
ii)
iii)
Oil Clearance
( 1 Cylinder)
No.1 -
INTAKE VALVE STEM No.2 -
DIAMETER
No.1 -
EXHAUST VALVE No.2 -
STEM DIAMETER
No.1 -
Intake
Valve spring No.2 -
height No.1 -
Exhaust
No.2 -
g) Camshaft