0% found this document useful (0 votes)
102 views4 pages

Plastering Production Rates

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
102 views4 pages

Plastering Production Rates

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

4/15/24, 1:03 AM Plastering Production Rates

Products Examples Pricing Production Rates Contact Us

Capabilities Services About Us Sign In Get Started

D&C Portal Takeoff tool Estimating Gantt Scheduler

Plastering Production Rates


Category: Masonry Hits: 31309

Customer
Construction Man-hour Norms feedback
Tradesman Labourer
Description Unit counts
Hours Hours
Solid Plaster
The
Render for wall m2 0.2 0.1
Experts
tiling, cement and
Client
sand in one coat
Reviews
13mm thick

Cement

render, one

coat 13mm
Estimating
Production
thick on Rates
Walls m2 0.25 0.11
Building
Soffits m2 0.28 0.11
Constants

Columns m2 0.42 0.18 Carpen

Beams m2 0.42 0.18 Interior


Finishin
Hardwall
Joinery
plaster, two
Lifts
coats 16mm
and
thick on Escalat

Walls m2 0.42 0.18 Masonr

https://methvin.org/estimating-production-rates/building-constants/masonry/plastering-production-rates 1/4
4/15/24, 1:03 AM Plastering Production Rates

Soffits m2 0.5 0.2 Bloc

Bric
Products Columns
Examples Pricing m2 0.55
Production0.25
Rates Contact Us
Plas
Beams m2 0.55 0.25
Plas
Skim coat hardwall m2 0.22 0.08
Capabilities Services About Us Pro
plaster on soffits Rat

Plaster cove m 0.15 Res


Wo
Plaster nosing m 0.15
Sto

Precast

Plastering Production Rates wall

Task / Description Slow Ave Fast Units panels

Browning (undercoat), Internal Walls 2.2 2.8 3.1 m2/hr Painting


&
under 2.5m high
Wallpap
Browning (undercoat), Internal Walls 2.1 2.6 2.8 m2/hr
Plumbin
over 2.5m high
Roof,
Browning (undercoat), Reveals and 9.9 10.0 10.1 m2/hr Ceiling

Columns less than 100mm wide and


Framing
Browning (undercoat), Reveals and 5.2 5.4 6.4 m2/hr
Suspen
Columns 100-200mm wide
Ceilings
Browning (undercoat), Reveals and 3.3 3.6 3.9 m2/hr
Tiling
Columns 200-300mm wide
Tower
Covings - 5.0 - m/hr Cranes

Concrete
Skimming (topcoat), Internal Walls 6.1 6.7 7.3 m2/hr
Work
under 2.5m high Demolition
Mechanical
Skimming (topcoat), Internal Walls 5.5 6.1 6.7 m2/hr &
Electrical
over 2.5m high
Structural
Skimming (topcoat), Reveals and 12.6 13.8 15.4 m2/hr
Steel
Excavation
Columns less than 100mm wide Foundation
Skimming (topcoat), Reveals and 7.7 8.3 9.8 m2/hr Plant
Productions
Columns 100-200mm wide Road
and
Skimming (topcoat), Reveals and 4.5 5.0 5.5 m2/hr Rail
Tunneling
Columns 200-300mm wide
&
Mining
Plaster Board to Ceilings 3.2 4.5 5.5 m2/hr
Retaining
structures

https://methvin.org/estimating-production-rates/building-constants/masonry/plastering-production-rates 2/4
4/15/24, 1:03 AM Plastering Production Rates

Plastering Ceilings, 1 Bonding, 1 1.1 1.7 2.4 m2/hr

ProductsSkimmingExamples Pricing Production Rates Contact Us


Plastering Ceilings, Topcoat Skimming 2.7 3.2 5.4 m2/hr

Capabilities Services About Us

You are here: Home Estimating Production Rates


Building Constants Masonry
Plastering Production Rates

Customer feedback counts

The Experts

Client Reviews

Estimating Manual

https://methvin.org/estimating-production-rates/building-constants/masonry/plastering-production-rates 3/4
4/15/24, 1:03 AM Plastering Production Rates

Takeoff Manual

Products Examples PricingGantt Manual


Production Rates Contact Us
Project Proverbs

Student Portal
Capabilities Services About Us
Estimating Software

Contact Us

Training Courses

Company Policies

Glossary

Methvin's Advantage

Support Ticket

Methvin is a leading provider of online applications for the construction industry and our
evolution is rooted in our commitment to offer only the most functional, flexible and easy to use
cloud-based estimating and tendering solution since 2018.

Contact Us
Login to the server

331 Rosedale Rd, Albany Auckland, New Zealand


[email protected]

Support and Knowledge Base


+1 347 759 6200

Copyright © 2024. methvin. | Privacy Policy | Terms of Use

https://methvin.org/estimating-production-rates/building-constants/masonry/plastering-production-rates 4/4

You might also like