Compilation of Plates - 2
Compilation of Plates - 2
10150 10150
10000 10000
4000 3000 3000 4000 3000 3000
W W W D
W W
3 3 3 2
5
2 2
D
4
5
SONY
D
2
3000
3000
MAID'S
3000
3000
KITCHEN LAUNDRY GAMING ROOM
ROOM
ROOM
D
2
BEDROOM 1
4 D
4
2
1500
W
1500
W
3
3
D
D
3
T&B1 3
T&B2
PLAY ROOM
DINING
4000
4000
AREA
2500
2500
3 3
15150
15000
15000
15150
15150
15000
15000
15150
D
W
LIVING ROOM 2
W
1 1 BEDROOM 2
4000
4000
4000
4000
ENTRY HALL
W
2
FAMILY ROOM D
2
D D
2 2
2 2
D
2
MASTER'S
BEDROOM
4000
4000
4000
4000
BALCONY
T&B3
D
GARAGE 3
1 D
1
1 W
3
10000
4000 3000 3000
W W
2 1
5 A B C D
3000
3000
10000
150
4 TOP OF TRUSS
1650
1500
W
3
D
3
T&B4
TOP OF ROOF BEAM
4000
W
2
GUEST ROOM
2500
3000
3 D
15150
15000
15000
15150
2 THIRD FLOOR FFL
D
2
BEDROOM 4
3000
4000
4000
LIBRARY
W TOP OF RAILING
2
1000
SECOND FLOOR FFL
D D BALCONY FFL
2 2
3000
D
2
4000
GROUND FLOOR FFL
200
NATURAL GRADE LINE
T&B5
D
3
1 W
2
W
3
W
1
10000 15000
3000 3000 4000 3000 4000 4000 4000
ROOF APEX
ROOF APEX
150
150
TOP OF TRUSS
TOP OF TRUSS
1650
1650
TOP OF ROOF BEAM
TOP OF ROOF BEAM
3000
3000
THIRD FLOOR FFL
THIRD FLOOR FFL
3000
3000
SECOND FLOOR FFL
SECOND FLOOR FFL
3000
3000
GROUND FLOOR FFL
GROUND FLOOR FFL
200
200
NATURAL GRADE LINE
NATURAL GRADE LINE
LEFT ELEVATION
REAR ELEVATION SCALE 1:100
SCALE 1:100
1 2 3 4 5
2100
2100
2100
2100
15000
4000 4000 4000 3000 1800 x 2100 mm WOODEN DOOR 900 x 2100 mm FLUSH DOOR 800 x 2100 mm PVC DOOR 900 x 2100 mm PANEL DOOR
D D D D
1 W/ GLASS PANEL 2 LOCATION: ROOMS 3 LOCATION: T&B 4
LOCATION: BACK DOOR
LOCATION: MAIN DOOR 15 SETS 5 SETS 1 SET
ROOF APEX
150
1 SET
TOP OF TRUSS
1650
SCHEDULE OF DOORS
3000
SCALE 1:100
1000
3000
600 500
500
1200
800
SECOND FLOOR FFL
1500
1200
1000
1000 x 1200 mm SLIDING DOOR 600 x 800 mm FIXED WINDOW 500 x 500 mm AWNING WINDOW
W/ 6 mm THK COLORED GLASS
3000
RIGHT ELEVATION
SCALE 1:100 SCHEDULE OF WINDOWS
SCALE 1:100
FTB
FTB
3000
3000
FTB
FTB
3000
3000
B1
B1
B1
B1
C1F1 C1F1 C1F1 C1F1
1500
1500
WF B1
4000
FTB
FTB
FTB
FTB
4000
B1
B1
B1
B1
2500
2500
C1F1 C1F1 C1F1 C1F1
15000
15150
15150
15000
15000
15150
FTB
175mm THK FTB
4000
4000
FTB
FTB
4000
4000
B1
B1
B1
B1
SLAB-ON-FILL
10mm ∅ TEMP. BARS
@ 300mm O.C. B.W.
C1F1 (TYPICAL) C1F1 C1F1 C1F1
4000
4000
4000
FTB
FTB
B1
B1
B1
B1
B1
FTB B1 B1 B1
1 1
4000 3000 3000 4000 3000 3000
10000 10000
10150 10150
3000
3000
3000
3000
B1
B1
B1
RB
RB
B1
RB
RB
B1 B1 B1 RB RB RB
4 4
1500
1500
4000 B1
4000
B1
B1
B1
B1
RB
RB
RB
RB
2500
2500
B1 B1 B1 RB RB RB
3 3
15150
15000
15000
15150
15150
15000
15000
15150
4000
4000
4000
4000
B1
B1
B1
B1
RB
RB
RB
RB
B1 B1 B1 RB RB RB
2 2
4000
4000
4000
4000
B1
B1
B1
RB
B1
RB
RB
RB
B1
B1 B1 B1 RB RB RB
1 1
4000 3000 3000 4000 3000 3000
10000 10000
10150 10150
3PCS EQUALLY
SPACED
SCHEDULE OF R. C. COLUMNS
MARK C1
PLAN
3PCS EQUALLY
SPACED
ELEVATION
PLAN
DETAILS OF COLUMN
SCALE 1:20
A B A A B A
A B A A
A B
10mm Ø STIRRUPS [email protected], 10mm Ø STIRRUPS [email protected],
[email protected],[email protected] O.C. [email protected],[email protected] O.C.
Ø Ø
Ø Ø
Ø Ø
ELEVATION
Ø Ø Ø Ø
Ø
DETAILS OF FOOTING Ø
SCALE 1:20
A B A
DETAILS OF FOOTING TIE BEAM DETAILS OF ROOF BEAM
SCALE 1:20 SCALE 1:20
A B A
10mm Ø STIRRUPS [email protected],
SCHEDULE OF FOOTING [email protected],[email protected] O.C.
Ø
Ø
Ø
SIZE REINFORCEMENT
DEPTH
MARK REMARKS
(H)
THK (D) Lx Ly X Y Ø Ø
SCHEDULE OF R. C. BEAMS
TWO WAY SLAB DETAILS
SCALE 1:25
REINFORCEMENTS STIRRUPS