MTP132-Daily Report 14 July 2023
MTP132-Daily Report 14 July 2023
MTP132-Daily Report 14 July 2023
Day Shift Overtime Night Shift Day Shift Overtime Night Shift Day Shift Overtime Night Shift Start End Total Hours Remarks
Rebarman 25 23 253
Mason 20 18 198
Carpenter 25 24 264
Fitter 12 8 88
Boilermaker 8 4 44
Pipe Fitter 6 2 22
Indirect * 68 51 537
HR Staff/Administration 2 1 11
HR/Administration 1 1 11
GA & Supporting 1 1 11
Administration 1 1 11
Civil Foreman 2 2 22
Civil QC Engineer 2 1 11
Operator Trailer 1 1 11
PERI UP Supervisor 2
DAILY CUMULATIVE
BALANCE %
ACTIVITY UNIT QTY Variance REMARKS
ACT. COMPLETE
Plan Actual Plan Actual
Construction
Civil Work Percent 100.00% 0.32% 0.05% 22.43% 10.02% 12.41% 89.98% 10.02%
Piping Work Percent 100.00% 0.02% 0.002% 0.96% 0.50% 0.46% 99.50% 0.50%
2. MAJOR HIGHLIGHT
A. Civil A. Civil
Install EMB footing rebar & Plan pouring 17 July 2023 m3 172 Continue Install EMB footing rebar & Plan pouring 17 July 2023 m3 172
B. Structure : B. Structure :
C. Mechanical : C. Mechanical :
D. Piping : D. Piping :
Joint pipe HDPE Field Pipeng & Fitting Ø OSU 400 PN10 Joint 70 Continue Joint pipe HDPE Field Pipe & Fitting Ø OSU 400 PN10
Joint pipe HDPE Field Pipeng & Fitting Ø PSL 400 PN25 Joint 37 Continue Joint pipe HDPE Field Pipe & Fitting Ø PSL 400 PN25
Joint pipe HDPE Field Piping Ø 160 PN10 Joint 68 Continue Joint pipe HDPE Field Pipe & Fitting Ø 160 PN10
Joint pipe HDPE Field Piping Ø 90 PN10 Joint 68 Continue Joint pipe HDPE Field Pipe & Fitting Ø 90 PN10
Joint pipe HDPE Field Piping Ø 63 PN10 Joint 62 Continue Joint pipe HDPE Field Pipe & Fitting Ø 63 PN10
Joint pipe HDPE Field Piping Ø 355 PN16 Joint 24 Continue Joint pipe HDPE Field Pipe & Fitting Ø 355 PN16
E. Logistic : E. Logistic :
Unloading Rebar, tools & equipment to TMF area Continue Unloading Rebar, tools & equipment to TMF area
F. Scaffold : F. Scaffold :
Hold PERI UP installation GL 15-11 from 4m & above Hold PERI UP installation GL 15-11 from 4m & above
G. Others G. Others
Concern :
DAILY PHOTOGRAPH
PHOTOGRAPH
GENERAL ACTIVITIES
Cleaning EMB footing from waste Continue install EMB footing horizontal rebar
TAILING MINE FILTRATION PROJECT
Site Installation Civil, Structural, Mechanical & Piping (CSMP)
PT. Agincourt Resources
DAILY PHOTOGRAPH
PHOTOGRAPH
Repair formwork for Switch Room pedestal Cleaning EMB footing rebar
Continue install EMB footing horizontal rebar Continue install EMB footing ties rebar
Project Control