Formworks Checklist

Uploaded by

Ninyasumergido
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

FORMWORKS (Installation)

< CHECKLIST >


PROJECT NAME : Inspection Date :
LOCATION : Attached Drawing Reference:
CLIENT : Drawing Number:
CONTRACTOR : Total Pages:

Pre-Inspection Final-inspection
Checked
Item # CHECKLIST DESCRIPTION Checked Method Contractor o Pre - Acceptance o Final - Acceptance
Submittals
Corrective Action
Pass Fail Pass Fail DUE DATE
Plan | Remarks

A. COMPONENTS

A.1 Form designs are adequate Review/ Comments o o o o o

A.2 Forms are constructed as designed Review/ Comments o o o o o

Survey/
A.3 Forms in place meet shape, form, line and grade o o o o o
Measurement

Form ties are properly spaced, arranged, installed and Visual/


A.4 o o o o o
secured Measurement

A.5 Forms are properly coated Visual/ Verify

A.6 Joints and seams are tight, and watertight Visual/ Verify o o o o o

Visual/
A.7 Allowances are made for camber, deflection or settlement o o o o o
Measurement

Blockouts are installed as shown on drawings and properly Visual/


A.8 o o o o o
braced, with access for placing and vibrating concrete Measurement

Visual/
A.9 Cleanouts are provided as required o o o o o
Measurement

A.10 Forms are adequately braced and supported Visual/ Verify

Visual/
A.11 Contraction / Expansion joints are shown on drawing o o o o o
Measurement
Visual/
A.12 Control joints are located as shown on drawing o o o o o
Measurement

A.13 Shoring is set on firm level base Visual/ Verify o o o o o

A.14 Shoring is adequately braced Visual/ Verify o o o o o

A.15 Screw jacks are not over extended Visual/ Verify o o o o o

A.16 Concrete inserts, grade strips, shear bar & key joint Visual/ Verify o o o o o

A.17 Waterstops are properly installed Visual/ Verify o o o o o

Survey/
A.18 Check forms are in the same level and elevation o o o o o
Measurement

B. OTHERS

Review/ Verify/
Check Approved attached i.e. Sketches, MS, Materials,
B.1 Record o o o o o
FCD's, Standard Codes, & Specs, Shop drawings, etc..
Measurement
Reason if not accepted: 'Solution for rectification | General Notes, Comments and

o Pre- Inspection: o Final Inspection: o Approved o Disapproved with Comments

Requested by: Contractor Inspected by: Approved by:

QA/QC Engineer
Signature: Signature: Signature:
Date: Date: Date: