This document outlines the quality assurance plan for final inspection of cables. It details the types of tests to be conducted, including electrical, physical and chemical tests. It specifies sampling plans and defines acceptance criteria with references to standards and specifications. Test reports will be furnished and some inspections must be witnessed.

Uploaded by

sriram.5230
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
194 views2 pages

L&T Qap

This document outlines the quality assurance plan for final inspection of cables. It details the types of tests to be conducted, including electrical, physical and chemical tests. It specifies sampling plans and defines acceptance criteria with references to standards and specifications. Test reports will be furnished and some inspections must be witnessed.

Uploaded by

sriram.5230
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Customer : IWS Triveni Turbine Limited.

A/C : M/S LARSEN AND TOUBRO LIMITED, C-4253


SBEE Cables (NDIA) Limited
GENERAL OUALITY ASSURANCE PLAN Doc. No. : QAP/I0/03
As per IS 694, 1554 - Part I, 7098 - Part I & 14255 Rev. No. : 00
FIANL INSPECTION Date i 02.05.2013
No.:lof2
sl Component & Class Type of Reference / Format of Testing
Description of Test Sampling Plan Acceptance Agency Remarks
No. Operation ## Check norns Records P
., FINAL INSEPCTION Test Reports will be
a) Routire Test Conductor Resistance (C R) & c Electrical
1000/0
rs r30
8 lntemal Test
2 I
fumished at the
High Voltagc (H V) Tcst @room temp C Electrical Mfe. Spec./ADS Reports time of Inspection
b) Acceptrtrce Test Cu Conductor - Elongation * c Physical As per Sampling Mfg. Spec. / Inspection Test To be witnesed by
AI Conductor - Wrapping * C Physical
Customer Inspection AI Conductor - Tensile Strength * C Physical
Conductor Resistance (C R) C Electrical
plan specified in
H V Test @ room temperature c Elect.ical
or No. of Conductors, Dimensions, c Physical
Third Party Inspection Area, Laying up, Construction c Visual
& Armouring c Visual the above Approved data 2 I the Inspection
Thickness of Insulation, lnner sheath, C Phvsical
Outer Sheath and Overall Diameter C Physical
Before Ageing of Insulation and Sheath C Physical
specifications /
Tensile Sbength Test c Phvsical
Elongation at Break Test C Physical
Volume Resistivity Test, c Electrical
Flammability Test C Physical Standards sheet (ADS) Reports person

Note I : * Before stranding Note 2 P - Agency which performs the test I - Purchaser - Third Party lnspection Agency
Class ## W - Witness of test 2 - SBEE Cables (INIDA) Limited
A: Minor, B: Major, C: Critical V- Verification of records

,)
.A EBEE
"+ (lNDlAf LlIlllD

or.lltv Conuol [dtJ,


SBEE Cables (INDIA) Limited
GENERAL OUALITY ASSURANCE PLAN Doc. No. : QAP/I0/03
AsperIS 694,1554 - Part 1,7098 -Partl & 14255 Rev. No. : 00
Date :02.05.2013
P No.:2of2
sl. Component & Class Type of Reference / Format of Testing
Description of Test Sampling Plan Acceptance Agency Remarks
No Operation ## Check NOITNS Records P
3 FTNAL INSEPCTTON FR Cable = Orygen lndex Test (OIT), C Physical As per Sampling Mfg. Spec. / Inspection Test To be witnesed by
b) Acceptance Test Temperaturc Index Test & c Physical
Customer Inspection Flame Retardance test on single cable c Phvsical plan specified in
FR LSH cable = OIT, c Physical
the above Approved data 2 I the Inspection
Temperature Index Test, C Physical
or Flame Retardance test on single cable C Physical specifications /
Third Party Inspection Smoke densitv and C Physical
Halogen acid gas evolution test. C Chemical Standards sheet (ADS) Reports person
FINAL INSEPCTION After Ageing oflnsulation and Sheath B Physical As per Sampling Intemal Test To be done as per
c) Othcr Tests Tensile Strength Test and B Physical
Elongation at Break Test B Physical plan specified in
H V (Water Immersion ) Test (PVC) C Electrical
Insulation and Sheath - Shrinkage Test C Physical the aboYe Mfg. Spec. 2 I
PVC Insulation and PVC Sheath -
Hot Deformation Test C Physical specifications /
Heat Shock Test B Physical
Loss of Mass Test B Thermal Standards Reports Sampling

Class ,# Note 2 : P - Agency which performs the test I - Purchaser - Third Party Inspection Agency
A: Minor, B: Major, C: Critical W - Witness of test 2 - SBEE Cables (NIDA) Limited
V- Verification of records

.a BSEE
".#, (tNDtA, rtlttD
Ar.[rY Conrol hdUD

You might also like