0% found this document useful (0 votes)
193 views1 page

Step by Step Traceability For The RM

Uploaded by

SQF Practitioner
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
193 views1 page

Step by Step Traceability For The RM

Uploaded by

SQF Practitioner
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Step by Step Traceability for the RM/PM

A. RECEIVING
1. Receiving of RM /PM: Upon receiving RM/PM, the lot numbers are entered by
warehouse team in Netsuite & Receiving log.

2. Receiving log & NetSuite entries for the Lot numbers are verified by QA
(Gaganpreet; back up Raghuveer) against the COA’s.

B. DURING MATERIAL ISSUANCE (To be implemented)


Plan for RM/PM Issuance Traceability (100% Real):
1. Column for Bin No. needs to be included in “Material Issuance and Material
Replenishment Requirement” after Quantity issued column – report sent by Fahad.
2. Warehouse needs to be trained on mentioning the Bin No. in above mentioned
report whiles issuing the RM/PM on the lines for set production.

C. DURING PRODUCTION (To be implemented)


1. This completed sheet (Material Issuance and Material Replenishment
Requirement) needs to be shared with Production & QA so that while tracking these
bins are selected.