CONTRACTOR: CHINT
BRIEF DESCRIPTION OF WORK / ACTIVITY: Air Aspiration in the transformer, Oil Filtration, Starting the Generator
Procedures: (SOP)
Training:
Code of Practice:
Inherent Risk
rating
List the
Associated Preventative Improvement Date for
List Activities of the task List hazards L C RR Controls Corrective controls actions completion
Risks
Page 10 of 15
Risk Assessment Format
KAMOA COPPER MINE – Document Number: SHER-RAS-FRM07-RA
Construction Department (Rev1)
Revision: 01
KCSA Risk Assessment Template Date Implemented: 08/03/2022
Page 4 of
Risk Assessment Format
KAMOA COPPER MINE – Document Number: SHER-RAS-FRM07-RA
Construction Department (Rev1)
Revision: 01
KCSA Risk Assessment Template Date Implemented: 08/03/2022
4 2 Barricading to be Daily
Uninformed inspected on a
people Working area to daily basis as Supervisor,
entering the be barricaded required by the employees & HSE
working area with solid DSTI and any Officer
Working area causing barricading in defects /
not barricaded / them to be 12 (M) the form of deviations to be
demarcated. exposed to standards and corrected
injuries to all ledgers that are immediately.
parts of the covered with Barricading to be
body snow-netting. tagged and
placed on
registers.
3 3 -Proper lights
to be provided
on site. -Additional light Site Supervisor, Daily
-Insufficient -Risk of slip, sources can be
- Regular employees & HSE
light trip and fall brought in to
breaks Officer
-Electricity due to poor increase the
visibility. 13(M) - Adjust the
- Unsafe overall level of
2. Light plant light plant to a
scaffolding or lighting in the
installation - Eye Strain comfortable
ladders area.
level.
-Exposure to -fatigue due - Brighter light
the bright light -Adequate rest bulbs can be
to over and sleep to
exposure of installed in the
help reduce existing light
bright light the effects of fixtures
-Electrical fatigue
shock from -Turn off
wires or faulty electrical
equipment system
-Insulated
- Falling from gloves
scaffolding or
- Inspecting
ladders
the scaffolding
-Eye damage prior to use to
from exposure ensure that it
to the bright is safe for use
light
Risk Assessment Format Page 5 of 15
KAMOA COPPER MINE – Document Number: SHER-RAS-FRM07-RA
Construction Department (Rev1)
Revision: 01
KCSA Risk Assessment Template Date Implemented: 08/03/2022
- Fire or 2 5 -Proper - Installation of Site Supervisor, Daily
Explosion - Damage of a breather employees & HSE
ventilation and
- Moisture transformer valve in the Officer
cooling
into systems to transformer
3. Air Aspiration in transformer - People - Monitor
working keep the
the transformer - Excessive temperature of temperature
vibration around will be of the
burnt the
transformer transformer
-Corrosion within safe - - Fire
and damage limits extinguisher
to the in place
- Regular
insulation inspections
and
- Fatigue and maintenance
failure of the to prevent any
transformer’s damage
components
Page 6 of
Risk Assessment Format
KAMOA COPPER MINE – Document Number: SHER-RAS-FRM07-RA
Construction Department (Rev1)
Revision: 01
KCSA Risk Assessment Template Date Implemented: 08/03/2022
-
5. Starting the -Defectives -Contact (both 1 5 Always refer to All work should only Supervisor, Daily
Generator equipment, direct or the operator’s be carried out by a employees & HSE
oblique) with operational/drivin
-Electrocution competent, qualified, Officer
“Live” g manual for
more information and licensed diesel
-Pinching, electrical
Crushing, or componentry if needed. mechanic.
Severe -Direct contact No smoking or Only qualified,
Laceration with rotating ignition sources. experienced,
-Potential For components Always make licensed, and
inside the sure that the unit equipped folks shall
Severe Burns machinery is turned off and adopt paintings at
-Respiratory cupboard. allowed to cool
aggravation before refueling. the Genset and
-burns due of
touch with hot simplest after a
-Explosion and Users read and
& pressurized understand threat evaluation
or burns as a
radiator diesel fuel SDS. relevant to the
result of
incorrect
coolant and/or
Always use assignment at hand
hot engine & is undertaken
refueling appropriate PPE.
or exhaust 15(H)
strategies. additives or Make sure
-A person fluids. adequate
ventilation.
breathing in or -Possible
getting into respiration
direct contact aggravation
from breathing Page 8 of
Risk Assessment Format
KAMOA COPPER MINE – Document Number: SHER-RAS-FRM07-RA
Construction Department (Rev1)
Revision: 01
KCSA Risk Assessment Template Date Implemented: 08/03/2022
with diesel gas. in excessive
exhaust
fumes and/or
dirt.
-Fire/ burns/
explosion
could result if
the best
refueling
techniques
are not
accompanied.
Persons
turning into
triumph over
fumes from
diesel gas and
or getting into
direct contact
with diesel
fuel.
Page 10 of
Risk Assessment Format
KAMOA COPPER MINE – Document Number: SHER-RAS-FRM07-RA
Construction Department (Rev1)
Revision: 01
KCSA Risk Assessment Template Date Implemented: 08/03/2022
15(H)
Page 12 of
Risk Assessment Format
KAMOA COPPER MINE – Document Number: SHER-RAS-FRM07-RA
Construction Department (Rev1)
Revision: 01
KCSA Risk Assessment Template Date Implemented: 08/03/2022
4 2 Safety officer and Supervisor, Daily
Responsible
supervision to sign employees & HSE
Moderate supervisor /
Failure to close- off on the DSTI Officer
injuries to foreman to
out relevant 12 (M) after shift has been
all ensure that all
documentation completed.
employees relevant
such as DSTI
. documentation is
signed off by the
relevant parties
before leaving the
working area.
Examples
Likelihood Risk Rating
(Consider near-hits as well as actual events)
5
Almost Certain The unwanted event has occurred frequently; occurs in order of
one or more times per year & is likely to reoccur within 1 year 11 (M) 16 (H) 20 (H) 24 (Ex) 25 (Ex)
4
Likely The unwanted event has occurred infrequently; occurs in order
of less than once per year & is likely to re-occur within 5 years 7 (M) 12 (M) 17 (H) 22 (Ex) 23 (Ex)
3
Possible The unwanted event could well have occurred in the business at
some point within 10 years 4 (L) 8 (M) 13 (H) 18 (H) 21 (Ex)
2
Unlikely The unwanted event has happened in the business at some
time; or could happen within 20 years 2 (L) 5 (L) 9 (M) 14 (H) 19 (H)
Risk Rating
Risk Level Guidelines for Risk Matrix
21 (Ex) – to Medium
to Extreme 12 (B)
25 (AA)
13 (H) –
to High
20 (A)
6 (M) –
Risk Assessment Format
KAMOA COPPER MINE – Document Number: SHER-RAS-FRM07-RA
Construction Department (Rev1)
Revision: 01
KCSA Risk Assessment Template Date Implemented: 08/03/2022
age & monitor
E
l Proactively manage via appropriate management system
i
m
i
Actively manage via appropriate management system
n
a
t
e
,
a
v
o
i
d
,
i
m
p
l
e
m
e
n
t
s
p
e
c
i
f
i
c
a
c
t
i
o
n
p
l
a
n
s
p
r
o
c
e
d
u
r
e
s
t
o
m
a
n
Risk Assessment Format Page 13 of 15
RISK ASSESSMENT ACKOWLEDGEMENT
I, the undersigned, hereby acknowledge that the relevant hazards as identified on the Risk Assessment, was communicated to me and I understand and acknowledge the safety
instructions and control measures relevant to my activities.
I furthermore undertake to ensure compliance with the safety regulations and instructions noted. I hereby commit myself to create and maintain a safe work environment.
Date Company
2 16
3 17
4 18
5 19
6 20
7 21
8 22
9 23
10 24
11 25
12 26
13 27
14 28
Page 14 of 15