The document provides a detailed estimate for the construction of approaches road for a major bridge across Amarja River in Kalburgi taluk, Kalburgi district. It includes 10 items with descriptions, units, quantities, rates, and amounts for earthwork, subgrade work, granular sub-base, wet mix macadam base, dense bituminous macadam and stone matrix asphalt courses, revetment work, filter material, drain construction, and highmast lighting.

Uploaded by

AKELLA RAMPRASAD
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
62 views3 pages

Approach Ramp - Bridge-3

The document provides a detailed estimate for the construction of approaches road for a major bridge across Amarja River in Kalburgi taluk, Kalburgi district. It includes 10 items with descriptions, units, quantities, rates, and amounts for earthwork, subgrade work, granular sub-base, wet mix macadam base, dense bituminous macadam and stone matrix asphalt courses, revetment work, filter material, drain construction, and highmast lighting.

Uploaded by

AKELLA RAMPRASAD
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Project: Construction of Bridge across Amarja River,Kalburgi taluk,Kalbugi district

Subject: Estimation
Detailed estimate
of MajorofBridge
Approaches road for Major Bridge Bridge - 3

Item
Description Unit No L B D Quantity Rate Amount
No.
1 Construction of embankment with
approved material obtained from
approved borrow areas complete with
all leads and lifts as per Technical
Specification Clause 305.
Approach ramp Cu.m. 1 Volume = 12639.7 12640
Straight Portion Cu.m. 1 Volume = 627.0 627
Total Quantity = 13267 200 2653333
2 Construction of Sub grade & earthen /
un paved shoulders satisfying the
requirements of minimum 10% CBR
value as indicated in the drawings and
specification with approved material
with all leads & lifts all complete as per
Technical Specification Clause No 305.

Subgrade layer
Approach ramp Cum 1 307.06 Area = 6.96 2137
Straight Portion Cum 2 50.00 Area = 6.96 696
Between pavement layers
Approach ramp Cum 2 307.06 Area = 0.8 491
Straight Portion Cum 4 50.00 Area = 0.8 160
Total Quantity = 3484 250 871007
3 Providing and laying coarse graded
granular sub-base (GSB) Grading-I
complete as per MoRT&H Technical
Specification Clause 401.
Approach ramp Cum 1 307.06 Area = 2.085 640
Straight Portion Cum 2 50.00 Area = 2.085 209
Total Quantity = 849 1400 1188208
4 Providing and laying wet mix macadam
(WMM) base complete as per MoRT&H
Technical Specification Clause 406.

Approach ramp Cum 1 307.06 Area = 1.969 605


Straight Portion Cum 2 50.00 Area = 1.969 197
Total Quantity = 802 1530 1226297
5 Providing and laying dense bituminous
macadam (BM) course in profile
corrective course/ new pavement road
layers complete as per MoRT&H
Technical Specification Clause 507.

Approach ramp Cum 1 307.06 7.50 0.05 115


Straight Portion Cum 2 50.00 7.50 0.05 38
Total Quantity = 153 6000 915885
6 Providing and laying Bituminous
concrete (SDBC) with VG-30 new
pavement road layers complete as per
MoRT&H Technical Specification Clause
509.
Project: Construction of Bridge across Amarja River,Kalburgi taluk,Kalbugi district

Subject: Estimation
Detailed estimate
of MajorofBridge
Approaches road for Major Bridge Bridge - 3

Item
Description Unit No L B D Quantity Rate Amount
No.
Approach ramp Cum 1 307.06 7.50 0.04 92
Straight Portion Cum 2 50.00 7.50 0.04 30
Total Quantity = 122 6800 830402
7 Providing Grouted Revetment with
rough stone (HBG) of not less than 300
mm size grouted with 0.20 cum of CC
(1:4:8) including cost, seigniorage
charges and conveyance of materials to
site and including labour charges for
packing the stones for revetment etc.,
complete for finished item of work as
per MoRT&H specification 2504 ( 4th
revision ) for Embankment Revetment
& Toe walls (600x600mm)
a) For Embankment Revetment Cum 2 307.06 Area = 1.955 1201
b) For Toe walls along Embankment Cum 2 307.06 0.6 0.6 221
Total Quantity = 1422 1060 1506989
8 Providing and laying filter material with
Gravel underneath pitching in slopes
including cost, seigniorage charges and
conveyance of materials to site including
labour charges etc., complete for
finished item of work as per MoRT&H
Specification 2504 (4th Revision) for
Cum 2 307.06 Area = 0.9775 600
Embankment.
Total Quantity = 600 1390 834420
9 Construction of Earthen drain as per
drawing and Technical specifications
Cum 2 357.06 Area = 1.125 803
Total Quantity = 803 150 120508
10 Provision of Highmast Lightening as per
drawing and technical specifications
Cum 9 9
Total Quantity = 9 50000 450000

Total Cost = 10597049


Backup for earthwork quantities Bridge - 3

Maximim Height 4.65 m


Earth work area at Maximum Height 76.057 Sq.m Audto cad
Earth work area at Minimum Height 6.27 Sq.m Audto cad
Average Area 41.16 Sq.m
Length of Ramp 307.06 m
Earth work quantity for Approach Ramp 12639.66 Cu.m
Length of Ramp of in Straight portion 100 m
Earth work quantity for Straignt Portion 627 Cu.m

Rivetment area at Maximum Height 2.998 Sq.m


Rivetment area at Mnimum Height 0.912 Sq.m
Average Area 1.955 Sq.m

Area of Filter media 0.9775 Sq.m