0% found this document useful (0 votes)
59 views2 pages

EICM MIDSEM 2 Syllabus and Assignment

Uploaded by

BeAst么 Ketan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views2 pages

EICM MIDSEM 2 Syllabus and Assignment

Uploaded by

BeAst么 Ketan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

GOVERNMENT POLYTECHNIC, HALOL

ELECTRICAL ENGINEERING DEPARTMENT


COURSE: ELECTRICAL INSTALLATION, COMMISSIONING AND MAINTENANCE
(4360901)
SEMESTER: 6 TERM: 232 DATE: 04/04/2024
MIDSEM-II Syllabus
CO’s covered:

CO2. Commission & Test various electrical equipments/machines


CO3. Carryout maintenance of different electrical equipments and machines.
CO5. Apply electrical earthing, safety rules and safety practices.

Unit – II Commissioning and Testing


2.1 Tests before commissioning of electrical equipment-Electrical and Mechanical
test, Preparations before commissioning of power transformer, Instruments
required for testing
2.2 Specific tests on -Transformer, Induction motor, alternator, synchronous motor
2.3 Commissioning of power transformer, three phase induction motor and
switchgear
2.4 Transformer insulation oil: Properties as per IS, sampling, testing and
filtering/purifying, standard tests as per IS, classification of insulation resistance
2.5 Measurement of insulation resistance and Polarization Index, Factors affecting the
insulation resistance of insulating materials
2.6 Drying the winding of electrical equipment and its record
2.7 Tests before and after commissioning of the Power transformer, Induction motor
and HV circuit breaker
2.8 Test report on commissioning and test certificate.

Unit – III Maintenance of Electrical Equipment


3.5 Maintenance schedule of transformer below and above 1000kVA
3.6 Maintenance schedule - Induction motor, Alternator used in TPP and SF6 circuit
Breaker
3.7 Probable faults due to poor maintenance in transformer, induction motor,
Alternator, circuit breaker, overhead lines, battery and solar plant inverter.
3.8 Advantages of conditioning and monitoring of equipments
3.9 Conditioning and monitoring of three phase Transformer and three phase
Induction Motor
3.10 Maintenance of domestic and industrial Solar plant and their core components
and wind plant

Unit – V Electrical Accidents & Safety


5.3 Necessity of earthing, various factors affecting on the earth resistance, advantages
and types of earth electrodes
5.4 Methods of earthing: plate earthing, pipe earthing
5.8 Fire Extinguishers-Fixed installation and portable devices
ASSIGNMENT

CO2: Commission & Test various electrical equipment/machines

Unit– II Commissioning and Testing

1. List the methods of drying out of winding. Explain blowing hot air in to the drying
chamber method.
2. Explain the terms regarding insulating oil:
a) Acidity
b) Sludge
c) Flash point
3. State and explain electrical tests to be performed before commissioning of electrical
equipment/machines.
4. List down the standard tests performed on insulating oil and explain any one in detail.
5. Explain causes of deterioration of insulating material.
6. Explain the commissioning tests on power transformer.
7. Discuss causes of deterioration of insulating oil.
8. Explain Polarization Index.
9. Give classification of insulation on the basis of working temperature.
10. Explain Centrifugal oil purifier method for purifying oil.

CO3: Carryout maintenance of different electrical equipment and machines

Unit– III Maintenance of Electrical Equipment

1 Prepare maintenance schedule for Storage Battery.


2. Explain hot line or live line maintenance for overhead lines..
3. Prepare Maintenance schedule for Overhead lines.
4. Discuss probable faults in Induction motor dur to poor maintenance.
5. Explain Premonsoon and post monsoon maintenance of line.
6. Prepare maintenance schedule for transformer having capacity below 1000KVA.
7. Discuss routine maintenance and periodic maintenance.
8. Explain advantages of Preventive maintenance

CO5: Apply electrical earthing, safety rules and safety practices.

Unit– V Electrical Accidents & Safety

1. State Fire Extinguishers and explain any one in detail.


2. Explain Plate type earthing with neat sketch. (7 marks)
3. Explain Pipe type earthing with neat sketch. (7 marks)

You might also like