Coordination Meeting
Coordination Meeting
Coordination Meeting
1 st Coordination Meeting
with the Ser vice Support
Brigade Neighborhood
Association Inc. (SSBNAI)
Project Background:
Metro Manila Subway
Project
Stations in Taguig City
Senate-DepEd Station
Options for SSBNAI’s
access
Open Discussion
2
PROJECT BACKGROUND
5
TECHNICAL PARAMETERS
Route Length 33.105km
Headway 5 minutes
2/1/2023 6
CONSTRUCTION
METHODOLOGIES
Significant goals:
• Increase ridership of MMSP.
• Mitigate traffic congestion within
the project-affected areas.
• Provide better access to and
from MMSP Stations by
providing facilities suc h as
Station Plazas or PUV Bays at
Stations, Footbridges, and
sidewalks.
8
CP108 STATIONS IN
TAGUIG CITY
Lawton Avenue
Senate-DepEd
Lawton to Senate-
DepEd Interstation
Tunnels
9
LAWTON AVENUE
STATION
Located in McKinley
West area, inside the
NAMRIA property and
a portion of
Megaworld
Corporation’s property
PRESENTATION TITLE 11
SENATE -DEPED
STATION
Located in Bonifacio
South Pointe, inside the
Philippine Navy and a
portion of the DepEd
property
PRESENTATION TITLE 12
CP108 AND BSMB
ALIGNMENT INTERFACE
SSBNAI
SSBNAI
▪ Lawton – Senate-DepEd Interstation Tunnels: 653 m will not be affected by cut and
cover and will be constructed by Tunnel Boring Machine. However, 70 m of which
will be used for the construction yard above the ground.
▪ In view of this interface, it has been agreed that the Main Blvd. will be constructed
as part of the MMSP scope after the MMSP construction has been completed
14
CP108 AND SSBNAI
INTERFACE
PRESENTATION TITLE 17
OPTION 1
PRESENTATION TITLE 18
OPTION 2
PRESENTATION TITLE 19
OPTION 3
PRESENTATION TITLE 20
CONSTRAINTS
OPTION CONSTRAINTS
1 Access road leading to Lawton Ave. will encroach SMPHI Phase 1; Subject for SMPHI and
BCDA’s approval
2 Access road leading to Pasong Tamo will encroach SMPHI Phase 3 and Navy Village;
Subject for Philippine Navy, BCDA and SMPHI’s approval
3 Access road leading to Pasong Tamo will encroach Navy Village and the New Senate
Building’s Access Road; Subject for Philippine Navy, BCDA and the Senate’s approval.
PROJECT TIMELINE
4 th Quarter 2019 4 th Quarter of 2028
Commencement of Works for Target Completion for Partial
Partial Operability Section Operability Section
22
REQUEST FOR CONFIRMATION
1. Brief History of SSBNAI
2. History of Coordination with SMPHI and BCDA
3. Inputs on the access road options
23
THANK YOU