DB436 - DB437 - DB438 Directional Antennas
DB436 - DB437 - DB438 Directional Antennas
DB436 - DB437 - DB438 Directional Antennas
(Continued on page 2)
Figure 3 Figure 2
Mounting Clamp Detail Side-by-Side Mounting Detail
SAFETY NOTICE
The installation, maintenance, or removal of an antenna
requires qualified, experienced personnel. CommScope Figure 4 - DB436
installation instructions are written for such installation
personnel. Antenna systems should be inspected once a
year by qualified personnel to verify proper installation,
maintenance, and condition of equipment.
www.commscope.com
© 2016 CommScope, Inc. All rights reserved.
Visit our website at www.commscope.com or contact your local CommScope representative or BusinessPartner for more information.
All trademarks identified by ® or ™ are registered trademarks or trademarks, respectively, of CommScope, Inc. 095028-000 P (05/16) Page 1 of 2
095028-000
(Continued from page 1)
DB436 INSTALLATION PROCEDURE
units together. Antennas mounted collinearly with all elements dir-
ectly in line down the tower obtain the best performance. In the ca- The DB436-4 antenna consist of four multi-element yagi DB436 an-
se of side-byside mounting, antennas oriented parallel to each oth- tenna with a phasing harness to connect the four units together. Re-
er obtain the best performance. Refer to Figure 5 when performing fer to Figure 6 when performing this procedure.
this procedure. 1. Proceed with steps 1 through 3 in the DB436 Installation Proce-
1. Proceed with steps 1 through 3 of the DB436 Installation Proce- dure for each of the four yagi antennas (see page 1).
dure for both units (see page 1). Determine the direction of the 2. Mount Antenna number 1 using the V-bolts and straps furnished.
desired maximum range and the tower leg on which the anten-
nas will be mounted. Mount Antenna number 1 using V-bolts and 3. Measure length “A” (refer to Table 1) down the tower (or the sa-
straps furnished. me distance from side-to-side) from the center of Antenna num-
ber 1 to determine the location for mounting the center of Ante-
2. Measure length “A” (refer to Table 1) down the tower from the nna number 2. Mount Antenna number 2 as in step 2 above.
center of Antenna number 1 to determine the location for mou-
nting the center of Antenna number 2. Mount Antenna number 2 4. Measure length “A” from the center of Antenna number 2 to det-
as in step 1 above. In the case of side-by-side mounting, make ermine the location for Antenna number 3. Mount Antenna num-
sure that distance “A” separates the two yagi antennas. Deter- ber 3 as in step 2 above.
mine that the “UP” arrow on the feed dipole is properly 5. Measure length “A” from the center of Antenna number 3 to det-
positioned. ermine the location for mounting the center of Antenna number
3. Connect the two units together with the transformer. Make con- 4. Mount Antenna number 4 as in step 2 above.
nection snug but do not apply heavy force with pliers. This sh- 6. At this point, the four individual antennas should be mounted. C-
ould leave the phasing harness transformer open for connection onnect the four units together with the DB436-4 phasing harness
to the station transmission line. (see Figure 6) matching the color code.
4. Follow steps 5 through 7 in the DB436 Installation Procedure 7. Follow steps 5 through 7 in the DB436 Installation Procedure
(see page 1) to assure proper operation of the Antenna System. (see page 1) to assure proper operation of the Antenna System.
Figure 5 - DB436
www.commscope.com
© 2016 CommScope, Inc. All rights reserved.
Visit our website at www.commscope.com or contact your local CommScope representative or BusinessPartner for more information.
All trademarks identified by ® or ™ are registered trademarks or trademarks, respectively, of CommScope, Inc. 095028-000 P (05/16) Page 2 of 2