The document outlines the bill of materials for construction of a building including items for general requirements, site works, civil and structural works, architectural works, plumbing works, electrical works, and post-construction works. It provides line items with descriptions and units of measurement for materials, equipment, and labor needed for the project.

Uploaded by

tjbalagtas8
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views7 pages

Table Qs

The document outlines the bill of materials for construction of a building including items for general requirements, site works, civil and structural works, architectural works, plumbing works, electrical works, and post-construction works. It provides line items with descriptions and units of measurement for materials, equipment, and labor needed for the project.

Uploaded by

tjbalagtas8
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

HOLY ANGEL UNIVERSITY

SCHOOL OF ENGINEERING AND ARCHITECTURE


A.Y. 2023-2024

PLATE NO. 2

CREATION OF BOM FORMAT

Angeles, Carl Joshua S.


Umali, Martin Abram P.
CE - 301
ITEM DESCRIPTION UNIT
I. GENERAL REQUIREMENTS

A Mobilization

B Temfacil lot

1 Bankhouse lot

2 Temporary Enclosure lot

3 Utilities lot

C Safety lot

D Demobilization lot

II. SITE WORKS


A Site Clearing & Grubbing, Layout & Staking lot
B Excavation lot

III. CIVIL & STRUCTURAL WORKS

A GROUND FLOOW CONCRETING & MASONRY

1 GF Footing

1.1 3000 Psi Concrete cu.m

1.2 Gravel Bedding cu.m

1.3 Rebars G33 kl

1.4 Formworks & Scaffolds sqm

2 Tie Beam lm
2.1 3000 Psi concrete cu.m

2.2 Rebars kl

2.3 Formworks & Scaffolds sqm


3 Wall Footing (additional) lm

3.1 3000 Psi Concrete cu.m

3.2 Gravel Bedding cu.m

3.3 Rebars G33 Ig

4 GF Column

4.1 3000 Psi concrete cu.m

4.2 Rebars kl

4.3 Formworks & Scaffolds sqm

5 GF Slab (additional) sqm

5.1 3000 Psi Concrete cu.m

5.2 Gravel Bedding cu.m


5.3
Rebars G33 Ig

6 Stairs

6.1 3000 Psi concrete cu.m

6.2 Rebars kl

6.3 Formworks & Scaffolds sqm

7 GF 6’’ Base Wall sqm

7.1 6’’CHB plastered with 10mm DRB sqm

7.2 Backfill & Compaction cubm

8 GF 4’’ CHB Wall (additional)

8.1 6’’CHB plastered with 10mm DRB sqm

B SECOND FLOOR CONCRETING & MASONRY

1 Suspended Slab & Beam (additional) sqm


1.1 3000 Psi concrete cu.m

1.2 Rebars kl

1.3 0.7mmx5cm profilex95cm eff. Width steel deck lm

1.4 Formworks & Scaffolds sqm

2 2F Column

2.1 3000 Psi concrete cu.m

2.2 Rebars kl

2.3 Formworks & Scaffolds sqm

3 Roof Beam

3.1 3000 Psi concrete cu.m

3.2 Rebars kl

3.3 Formworks & Scaffolds sqm

4 2nd Storey 4’’ CHB Wall sqm

4.1 6’’CHB plastered with 10mm DRB sqm

C ROOF FRAME & ROOFING WORKS

1 1.5mmx2’’x6’’ C Purlins Ig

2 1.2mmx2’’x6’’ C Purlins Ig

3 2.5mmx2’’Steel Angle (Cut as cleat) Ig

4 RibType Roofing lm

5 GI Pre-painted Inside Gutter Ig

6 GI Pre-painted End Wall Flashing Ig

7 Consumables lot

IV ARCHITECTURAL WORKS

A Glass and Aluminum (additional) sqft

B Doors & Gates


800mm wide Wooden Panel Door w/ doorknob-
1 set
painted
2 700mm wide PVC Louver Door set

C Floor & Wall Finishes

1 400x400mm CR wall tiles pc

2 400x400mm CR floor tiles pc

3 600x600mm Floor Tiles pc


400x400mm Rustic Floor Tiles (stair steps, kitchen,
4 pc
balconies)
5 Granite Slab pc

6 60x60cm Black Tiles pc

7 2’’x10’ Aluminum Stair Nosing Ig

8 Portland Cement bg

9 Fine Sand cubm

10 ABC Grout bg

D Ceiling Works

1 PVC Ceiling-Ficem Board on light metal frames sqm


GI Spandrel Ceiling-Ficem Board on light metal
2 sqm
frames
E Railing

1 1 1.5mm thk-38 Square Tube lot

2 1.2mm thk-25 Square Tube lot

3 Consumables lot

F Concrete Canopies

1 Concrete Canopies sqm

G Cabinets

1 Kitchen Counter Cabinet lot

H Painting Works

1 Masonry Wall
1.1 Concrete Neutralizer gal

1.2 Primer gal

1.3 Reducer gal

1.4 Skim Coat bg

1.5 Marine Epoxy gal

1.6 Semi-Gloss Latex gal

1.7 Consumables lot

1.8 Metal

1.9 Red Oxide gal

2 Epoxy Primer gal

2.1 Body Filler gal

2.2 Automotive Paint gal

2.3 Paint Thinner gal

2.4 Epoxy Reducer gal

2.5 Lacquer Thinner gal

2.6 Consumables lot

V PLUMBING WORKS

A Fixtures

1 Water Closet Package set

2 Shower Set set

3 Kitchen Sink set

4 Goose Neck Faucet set

5 Hose Bib unit

6 SS Floor Drain unit

B Sewer & Drainage System lot

C Clean Water System lot


E Catch Basin

1 400x400 Catch Basin unit

VI ELECTRICAL WORKS

1 EMT lg

2 Wire Holder pc

3 Entrance Cap pc

4 #8 THHN Stranded Wire lm

5 #10 THHN Stranded Wire lm

6 #12 THHN Stranded Wire lm

7 #14 THHN Stranded Wire lm

8 Electrical Devices, Conduits, etc lot

9 6 branches Panel Board unit

10 Single -Gang Switch pc

11 2 -Gang Switch pc

12 Duplex Convenience Outlet pc

13 ACU Outlet pc

14 50A CB (Plug-in) pc

15 15A CB (Plug-in) pc

16 20A CB (Plug-in) pc

17 30A CB (Plug-in) pc

18 Recessed Light with housing set

VII OTHERS

A Water Proofing (CR & roof deck) lot


VIII POST-CONSTRUCTION

A Cleaning of Physical Job Site

B Reviewing the Project with Clients


C Finalizing Project Documents

D Returning of Equipment

E Punchlisting

F Transferring of Documents