0% found this document useful (0 votes)
158 views

CND Solved Manual

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
158 views

CND Solved Manual

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 47
Computer Newvorking and Data Communication (2264) {b) Actual Network used in laboratory ‘Maharashira Sate Board of Technical Education Computer Networking snd Tata Commimication (2264) NIL Resources used ] Ste. | tastrwment ‘Components | Specification [ ouantity | 1 Deskter Gmpwters | Computers in heh Min.3 ness} = NG werking_devices | Available in ate bb || NO-Cach *_Kemmecting Gbles and nshielled 4 — Comme hors Pair Cable XT Actual procedure followed F POMCK Ae. Cenfi quaadion...04...2h..Gampuress. being \Aserk i” th€ lab «by Bseng, RE... fellewing.... pamcecua€:.2.SMitch...CN. Abe, Corn paeee WAghd.Clich..Oo..My... ecm pad. SLCC... PEO PEIES..tii) Tht #Eilewing.. SC2LEN....Apy Nere..clowien...the... specifi Cations of ARS, Comp uadtior. dim. o— z XIV Precautions followed (use blank sheet provided if space not sufficient) 1. Do not change other settings in IP addresses without intimating subject teacher. 2. Use proper cables wherever applicable (Cross-over , Straight). XV Observations (use blank sheet provided if space not sufficient) ‘Computer Configuration ‘Component / Part ‘Name of Manufacturer Processor inte sed_im lab _| jab | pier Diss Ta Shibo used jm | Operating System A ep le Se, in a b MO Sam $e i mponent / Part [Name of Manufacturer | Specification ork Components a Component Name of Manufacturer | Specification a Number of Pons: 3 | Switeh/Hub D-link [Speed tou obs | [Cable _| Real anactecholody _| Speed | 5.5 melas ‘Connector _|anetex Type: [Router | t-bolf payan [Any Other — L — Note: Refer instruction manual for above observation ud Recommendations to be taken based on the interpretation of results). Thus. Se, have "Sladied. the... can past Rex. EWR Ig. Sagtem” Fhod... developed... the... GamyMbeere dab. Qirthen ANO..AYRE.OF TnSAveed...ea vlog yonis Cord dnb AUN, 28 pet a LOOINIC AL... PCL NY cad: OM A DX nud Rsinrsnesnese “Maharashtra State Board of Technical Pducation Computer Networking and Data Communication (22634) . Bn XVUL_ Practical Related Questions: Note: Below given are few sample questions for reference. Teacher must design more such questions so as to ensure the achievement of identified CO. 1 he different ports available on the computer, Give their functions. 2 the position of the Switch in the connected Network 3. State the number of computers and network control devices connected in network, {Space for Answers} DD sevialPaxk i=... A. Seni... Park... “aharashira State Board of Technical Educati {Cover Netyeork ing and Data Communication 22684). tag Resourees required | Instrument Specification ‘Components 1.] Desktop ‘Computers in the lab 3 |__| computers - | Connecting Cables and connectors, Connectors with one end BNC and other end RJ 45 Connectors,(Or a linker between BNC connector and RJ 45), co axial cable, BNC connectors, BNC-T Connector and Terminator Network toolkit | Standard OL Precautions to be Followed ‘* Handle computers with care, * Use the network tools with care XI Procedure Physical formation of Bus Topology 1. Take a coaxial Cable of length 1.5 m. Take a terminator connector and connect to. One end of the cable, Fig 2.4 BNC terminator ‘al eable connect a BNC-T connector. (One end) BNC T wet 2. To the other end of coax Fig2.5 BNC-T Connector Maharashira State Board of Teck Computer Networking ant Data Communication 22614) 3 Take Pthemet cables and connect one end of the cable te port-RJ 45 to conneet to the NIC of the Computer The other end is connected to FINC connector whieh in thirn is connected te th Fig 2.6 BNC Connector Fig 2.7 One end of cable connected to BNC connector and the other end to RJ 45 4. The compter! is now connected one end of the BNC- T connector and then to the terminator. Repeat step 3 to connect more computers! networking devices. 5. Afier connecting 3 computers, connect BNC terminator to the BNC-T open end. 6. Now switch “ON” the computers, The computers are connected in Bus topology 7. Share file or folder between two computers, XIL Resources used RE Instrument ‘Components Specification a Jape [ComPuteTs in je ab | [Dskiop Compurers |COmPAters im dhe fab Po Jeeniechng Guiles and] Comm CQoTS With one er } {éun€ciors BNC ~yid other evel RIF5! [NetWork -teolpit | Standard Maharashirs State Board of Technusal F ducation | i 4 Data Communication (22634) ee Computer Newworki XULA dure followed. . take a Coatal. Cable,.0¢ Length. i6an.-Take. 0. Acetate ae amt... Conene. Be. Fome....Cond..0cb he. Cable. Gs 8. BAC XV__ Observations (use blank sheet provided if space not sufficient) Remove the BNC connection and the RJ 45 connection and re connect to check the Faidiy of he connection esas. MIE... BANE... TREMAINE He 0 Ge. DDE G...ANE. Bon ouder. wi Sf. Lea8i0A...abl®.. WE... NOME... Comoe... te NC..Comaleder.. OthEH.. end... Conneaee ke. Ae, EMT ane Ae t..ccach, fas... this. Aep ele. CaN. &. fea O44. 226...Ad. ANS, Gennecdon sSwitich,..0.9...2hE..Cean puke. UE... -bucs dotdagy, Phen. shewatedesthe L1%6d ted cr oo ane Com Purer XVI Result The number of Cables required to connect 4 computers in Bus topology is ‘The number of BNC-T connectors required for connecting 3 computers is ‘The number of BNC connectors required for connecting 3 computers is 4 XVII Interpretation of Results Tan. AS. amp 2s ewe... leg. BNC. Genmecter. es. Jam pasclenh.rel€. baf.a. NES. delagy.. USCek...00- OF..BNS, aac, RES xvi Manarashira Slate Board of Technical Education 3 Computer Netoarking and Data Communication (226M) a NIX Practical Related Questions Note: Below given are few sample questions for reference. Teacher must design more sutch questions so as to ensure the achievement of identified CO. ate the limitations of the bus topology late one situation where bus topology can be implemented . Name the different tools available in the tool kit [Space for Answers] LadionS..AKe..Comne.ched,.the.garteenance D.ANCAY..008 6 GEARION...000.. AD. MED RED lll aa..ckben....denn pottery... NCW. cS. Rede. oad des Mel cD... MEN. chiG bh. MAK. BOO SAOE... LEAL TR fn BAN ac bO nh CE LM ed CO KOUS. SUD LS Ard LO UBS... EGG. Maharashira Siate Board of Technical Education Comptes Netsorking and Data Cimnmunication (22644) Star Topology Fig 3.3 Star Topology physical connections (b) Actual Network used in laboratory i Computer Neworking nd Data Communication 22634) oe button until the ICMP ping is completed, 1), ing Capture/Forward sr awteh, The PDU Last Seats ‘move between the hosts, thu Continue eli ICMP mg shows as Successful XIL_ Resources used Sr. No. | Instrument ‘Components Specification Quantity [Desk te? ComPuleds [ComPutors im Heleb| 14 ad AS Pec TBP 2. [Commecting cables onl | Umehiclded Bwistel |B Per Nese RI4S Connerors Pas, aale Neaweth alan LAN Pre 3 |Netvorking devices 9 or Cer 27 Fert | tig, acy Switch XIII Actual procedure followed (use blank sheet provided if space not sufficient) . Stak... Pabkek.. Tx alex. :.Cheasing... DEVICES. .Candk.. CAME MONS. i. Hosts, Comnmecding, the. Hass. do ane ..dnch, Cer figuaity Mealy... ' XIV Precautions followed (use blank sheet provided if space not sufficient) f tlamdele.... Compusens...Anith.... Cart i HSE...cAhE.... MEbwa.k.. Beals... \aGbh... Cate | XV Observations (use blank sheet provided if space nt sufficient) ‘Name of Computer Computer A / Computer 2 t MAC address compute x A: Bo-oc “29'Lau~SSe0-o5 | ier 6: 86 — eI ~o9 Seg 1 hare computes aos ' ss fompader f(y eR. | ‘Name of Workgroup Port number of Witch? ‘hub pMekkG@Roup where one end of the 4 computer's” NIC por is connected Total number of computers connected in tr topology Gi, ao rrlr,r—”—CU|_ XVI Result The number of Ps A The arrangement of components in above net : i Logical) EWS, CMPaNENS in shove network topology is done in (physical atch Cables required to connect 4 computers in Star topology is ‘Maharashira State Board of Technical Education = Computer Networking and Data Commun XVU_ Interpretation of Results XVIU Conclusions and Recommendations (Actions/decisions to be taken based on the interpretation of results). Thus. DAV. SEAT Ca. CENCE. GEO UYEAS, i MAB, xh... the... jacetectmaain: é XIX Practical Related Questions Note: Below given are few sample questions for reference. Teacher must design more such questions so as to ensure the achievement of identified CO. I. Give the method to check whether the physical formation of star topology is completed or not? 2. State the difference between Hub and Switch 3. State the number of ports in the switch/ Hub that is used in the lab [Space for Answers] Du. MPLA. A. Se OGUMEE. 4.58. ghee bite Add S... KACO Aub, ate. ach. as nepentext Sich. Gm be used... re ped Yat 15 denexare oviginal | that 16 denevate the ov, bit Patiewn bit Pater a ae Board of State Board of Technical Education Computer Networking and Data Communication (266) irk used in laboratory IX Resources required Sr. Instrument i . yuantity No._| /Components _| SPetification Quantity 1, || pessoal Standard computers with NIC card 2 computers Connecting UTP CATS Cable (crossover cable) with 2. Cables and RUS connectors 4 connectors att X Precautions to be Followed * Locate the various ports on the computer before making connections ‘+ Make the connections with care Handle equipment with care * Configure settings carefully to avoid conflict. XI Procedure 1 The lio computers are connected to each other using UTP eables as shown in the block schematic. Name the two computers as Computer-A & Computer-B. ‘Check the computer name settings for each PC and make adjustments as necessary. For each Computer/PC, select Start and Control Panel, Double-click the System icon, and then click the Computer Name tab, * Write the name of the computers as Compute-A. Computer-B on respective machines Maharashua State Bourd of Tech 3 Computer Networking and Bata Conumnnieat a confirm the d ween ComputerA and Computer-B and con ta ang we file bet imong the computers, recess ccpunien «Share prinr een both eomputers and ry 10 gl 2 XML Resources used Specification Slendecd. Compress with NIC Conk, 2 \GumeAing [UTP CATS GLIE with RI- 4S GrenechorS 4 2. i@bles XII Actual procedure followed ThE..2..Cona pista... Rh CAC. ME MEE. IEP bee [email protected].. omapuederns..AS..inapuderA..Amd..Ceaarp Qader B the Enerene..idl 2. Mik. Pika Gennaeriyidy. Garhy Mee chk..Se ing S. Very, AP, Gemimeee Ml kee. 2. NE aE. Gommecd vidy. bSinng..My. NERO LAL en Kquipment.... with. CKO... 5 Cui Gin.SCbbings...Grcefllly..2:0,,. Axi aadtlcd XV__ Observations (use blank sheet provided if space not sufficient): Make the following observations after step 7 2. Check the icon for the other PC in given peer-to-peer network b. Is itthe same name of computer you recorded in Step 27 a . Perform Step 7 on the second PC. : A fC. Gin Spas eS EEPUXES With OthEY ~C bon Phe neWwert XVI Result |. The packetsfile sent by. Cac purea A are received by 2. Folders can be shared from Computer-B to... 3. Itis possible to share Printers, scanners, by. amouten B.. y the Computer-B Cmpure: connected to Computer-A femel Close any ofen window. Edson 5 inarashiva State Board of Tech Coanqune Nepecehaig. and Tate Commmpcomn 22694 UTE Teterporetation of Recnite AVI Conclocions and Recommendations { Actiane decisions to he taken ased on the interpretation of results, Thus... sete... Nawe...6Ruclis@ch. de install Good quine: 1062 fit Le Peer... LAN..and. SPA EG OK AGS: AIX Practical Related Questions Note: Below given are few sample questions for reference. Teacher must design ‘more such questions so as fo ensure the achievement of identified CO. State the actual IP settings of computers used in the lab, |. State the steps to add one more computer to the peer to peer network formed 2. State the advantages of the peer to peer model in comparison to the client server model 3. Name type of networks shown ig 4.8 and fig 4.9 following diagram: Fig 48 CCOBE dps. $M, debian Nf Clb Qana Shs €. Shacsive,...4. “ Len LEM PATO. ho aba... pee del. er €..hS..telle. Wh ced,....be. fare. dish: x. meter. : ABLE AS ENE “Saemarada Sia Bord a Fhe cag sal Education Computer Networking and Daa Communication (22648) {b) Actual Ci As Pee Shosing Stays IX_ Resources required Sr.No. | Instrument /Components ‘Specification Quantity 1], | Personal computer with basie | See laxrmeese findows 7 onwards... CAT-SICAT-6 (minimum 1 2. | Network cable (Straight) | meter length with RJ-45, 1 | connectors on both ends j CAT-SICAT-6 (minimum T | 3. | Network cable (Cross-Over ) | meter length with RJ-45 1 connectors on both ends X Precautions to be Followed '* Cables shall be properly crimped to avoid error and trouble in establishing connection. * Check physical connection and settings of IP addresses of networking before starting the troubleshooting and using in network. XI Procedure Procedure for point to point (PPP) connection of two computers using Cross cable: 1. Get one LAN cable (CAT-S/CAT6) having standard colour coding having RJ~45 connectors at both the ends 2. Connect two personal computers (PC) using this cable at network patch cord socket on back panel of PC. 3. Switch ON both PCs. (PC-1 and PC-2) For PC-1 1. Go to start Menu--- Setting in windows ~ Network /Internet options and click on Change adaptor Option. 2. Select Ethemet — make it enabled Then right-click on the ICON and select Properties. 3. Then in that select (Double click) on IPV4 (TCP/P) and click on Properties ‘Maharashtra State Board of Technical Educat “0 ke Compe, Networking and Hata omnnaicate 27040 ceases Specification S| tnstrnment ‘Components " 7 1 | Pesseonal Gon capil windows ? wards Jiasic. Configuaadion, a 2 |Nework table OM Slat J 8 [Network able |ar-siar6 _ I XM Aste procter! aling.. sited ary RIGS. Commecho.65..00b. Comnecd..2..eebeSimng...2h. bac 1A PL nko Siwidcb...QN...bath..PES XIV Precautions followed (use blank sheet provided i Gies.. Shall. be pucpetly.. As URIY, ., Eda lis his Check. Physical Cocnmecitnn. Lah. od of. mewertiong..nefore...Stecsking, dhe. [email protected] M4 ag m network XV Observations (use blank sheet provided if space not sufficient) 1. Both PCs PC-I and PC2 shall be switched ON /OFF before configuring. 2. Test cable before establishing connection green colour LED glows on Back panel or on Laptop. 3. Check sharing setting of PCs before sharing files/folder. XVI Result 1. The File share from PC-1 2. ‘The File available at PC-2: 3. Whether Packet sent from PC-I to PC-2? 4. Whether Packet reached to PC-2? (Yes/No): .. 5. Networking Verified (YesINO): «s+... XVII Interpretation of Results ‘ahaa Ste Bord af Tea Encaion i Computer Networking and Data Communication (22644) XVIL Conclusions and Recommendations (Actions/decisions to be taken based on the interpretation of results) Different ports av wk panel... 4 DOL PANEL sss ssescssee XIN Practical Related Questions Note: Below given are few sample questions for reference. Teacher must design more such questions so as to ensure the achievement of identified CO. Teacher shall allocate (Q._,Q.__Q.__,Q. {o students. |. State three parameters used in point to point operation 2. Write steps to configure PCs IP address of PC-I, 3._ Record specifications of network components used in point to point connection ‘4. Given probable reasons if point to point connection may establish between PC-1 and PC-2, 5. Record observations if cross-over cable is replaced with straight cable? {Space for Answers} ) tule. lick. my. computed. on. Pe desk p: 2) TM Aou PEP UP..Ae NA .. AP POA. ~Hren..Click..280. Prnpesties. 3 Aes...clicking Cin... Peepeacdi.es...theiv..Palup.lalecdow. .appead. their Selec...he. iateenek...pactacal.. 9) Clich..0m..0.. Abeer Selec, ane P AFI 8.. Abebt.ik. lomiqure ap ere 9) ..ppStsaelicki 100... Ge glance, hen. Gonads de.4P. Addmess....c ae = ankighxe. Be TP askleeSs Maharashira State Board of Technical Education Straight cable with RJ-45 connectors ‘Cross-over cable with RJ-45, connectors Fig, 6.7: Crimped CAT-S Cable with RJ-45 connectors * Student shall draw straight and cross-over cables wires sequence with coloured sketch-pens or Pencils shown in Fig 6.4 [raw Straight Cable wire sequence Draw Cross-over Cable wire sequence Maharashtra State Board of Technical Education 30 Computer Networking and Data C x cation (22614) 4. Push the Wires earefi bend in the RU-Conneetor, Take precaution these shall not be Align the connector with crimping tool proper and Crimp/Press the Connector with wire, ae Follow this for other end as pet cable type ‘Test the eable using LAN tester, Patch chord is ready Resources used f Tustrument {Components __| __|cable FMPINY feo] Connector RJ-ts Ayre g-lo_| 4 [LAN Network Ghie a Testes 5 tor caen : __|.Stvi ppew- Quantity XI Actual procedure followed XIV Precautions followed (use blank sheet ‘Maharashira State Board of Technical Education ‘Student shall write procedure: For preparing straight cabl aspkcprgpadl able. Clble..Seg men aS. Per. eight. dele, Sequence ELE..en8, ~Gindh.0f. Cale. LASas,. Cable. AA PPO. & ae Se GME... OL Nabi NES. DS, fon... He, torn. SLvajg ht..Cable- mecha eo in epee. mya. Aenl.. earl Cairn - ollew tniS or other enck as fey G fe ?ype- Fok Cro stleeRe leieng CAN tester -Felch hovel 18 ready: Faspect..available.. be SEG. 0G AS. LEX IRE: Chas SER. te RLS, IG,. bdeb ie... Shai fe He... SeGUENCE..Of.WiTS.AS vex.Calle Fa wence a Hicla..Contaaicag. ta Fn CEO. LN AS LET te J LAN 4ester. paich e. cherd. 16 yeddly: provided if space not sufficient) LCR. ROPER. SRO EOREM, USE.O.. ee ene Crim pieng...Aaal...lo.! Ameange.... Caloux...Cades. frropsaly..daaighbened.. nearly... ‘No.2 the. Faheamne2.... Cable..Sheslch, be, ot visted. others Jill. BE. .SuSCCedhle...de,..Caes Herd ke... a. tart...cdtelect ona,,.do.nnt..bends.de..oned. Sc elch As. chad, tsi9n. RAE. Awitl,.. WEE. CADIS, ROS ivve quality.Conneciors: AV Obeervatione ventures sal Compt ze fet 4 Hae er (OPTION. AL) vector OPTION ae able Tester re rap hy ish a of these) connector as pan SIRI ists of (LAN/MAN/W; 2 Cable comist cs LAN... (LAN! AN, Pach chor oie! Cte gga of «LAN (LANMANIWA, 3, Computer Laborato ere ee connection iS made 0 Vi Result Computer. A ‘ 1 CAT stands for. & Bk ( ¢ the Univer Network inside t Router ban 5. Ha ctaoverSaight Cable) Gest. (Crossver XVIE_ Interpretation of Results XVIII Conclusions and Recommendations (Actions/decisions to be taken based on the Interpretation of results). XIX Practical Related Questions Note: Below given are few samy ‘more such questions so as to f. (UTP/ STP), sions up to 100 Mbps is cat BOTY 6... oeees 3). 3. Felephone wire uses a.BiTs1L.. (RUM45/ RIL 1) connector, « 4 FULL... (HUB! Switch) is a devies that splits a network connection iat ‘multiple computers, 5.8 + (B1-45/ RJ-11) connectors, ctWork components in your lame type of eable is used in netwon State the \ype of topology used inf are used for computer networking. w lab and bive use of four). king of laboratory? RJ 45 laboratory?. Bos. 6, apology. Males Ste Board afc Eaagiag ———————_ Computer Networking and ate Comune (29614) [Space for Answers} & OOM ae, 1..ctteedeas..6 cable..kab...2oLLex...M..ame.des “Maharashira State Board of Technical Education ee Networking and Data Communication (22634) b) Actual Circuit used in laboratory ECT eee IX __ Resources required ~~ _ Sr [Instrument Specification Quantity No.__| ‘Components Intel PAV, 2Gbyte, DDR2, 500Gbyie Personal Computers HDD, Keyboard onswards Installed ni 1. | or additional with Windows 7 onwards and intemet Terminals ) connectivity 2, | Personal Computers | 4 table computers in Laboratory 06 “| (For End Terminals 3._ [Hub Minimum 4 port Hub B 4. | Switch Minimum 8 port switeh ol 5. | Cables Cross-over cable (with RJ-45 connector) | 01 6. | Cables Straight cable (with RU-45 connector) | 01 x Precautions to be Followed J [UNO Design parameters shal be planned earlier 2 Gites shal be predetermined to avoid te conflict * Selection and connection Cf proper patch cables (Straight / Cross-over) at PinpPrist situations shal be used as perce topology of network. * Printer shall be installed on PC where re connected Maharastra Board of Technical Computer Networking and Data Conmmncation (29640) C:\Documents and Settings-ping 192,168.02 Pinging 192.168 0.2 with 42 by Reply thom 192.168.0.3 bytes3) time Reply from 192,168.04: bytes? tim Reply fiom 192,108.05: bytes 49 tin Reply thom 192.168,0.6: bytes=32 timectms PHL" 128 Reply trom 192.168.0.7: bytes=32 timectms TT =128 Reply fiom 192,168.08; bytes=32 times tm 128 Is TH 128 Ims TPL ota Ims TL 128 Ping statisti P: % Sent = 6, Received = 6, Lost = 0 (0% loss) To Share file/Folders in LAN: 1. Open Network & Sharing Center 2. Inall versions of Windows, the app is located in the Control Panel. . 3. In the Control Panel, click on the Network and Internet category and then click on Network and Sharing Center, To Share Printer in LAN: 1. Click on Start in the bottom left comer of screen. A popup list will appear. 2. Click on Devices and Printers from the popup list. 3. Select Add a printer. on Add a network, wireless or Bluetooth printer. k the shared printer. 6. Click Next, XII Resources used Sr. | Instrument Specification Quantity No. _| /Components IESE PIKE enrel PoLV iO, 1. | PewSonal Gomputesizryee Hi 0y Kevpeal om ie 1 2 | ReeSoral Compules| pyailable Computers in lab | ¢ 3. | Hub (inion earmabaiens + Ft Hu), NX Switch Mivionum 8 Port Switch |) 5. | Cables Goossover Coble] styaight Ge] 1/ XIII Actual procedure followed : ‘© Steps in short for Connecting computers in LAN: ‘ A ARViGES..AS...Showen. Using. Seeanee...0l..Coam patie... nelson : Seder Hae Cabs [email protected] Pics toile ae Aegaight. .CAbIOS: Conneca. ele. 3..Compuntess. Ante a 2, sEabighk” GIES. then..<é deah Has bd et a 109. 4. cables, .Compe. dab. |. ach Hub 2cA6.L \ haa ie a adler flu - sign, ead eS. inet Must ‘amd Default Jareway AddweS8eS to Cach- ‘Mabarashira Slate Board of Technical Education Na ” r tion (2266). con Newoing Dn Combes + Por string Hess in i: kon Stat oy 645, xem. ES ti espa te ich. Adc. cnt ind. Tee hosing. Cente .e not sufficient) Gaeqony. ach. "themn...Click .em..Neawortk.oenes.0 XIV Precautions followed (ose bank sect provided if spac Sicko... let Cnet. LCF. PME. OE. KEEN A m7 List.wilLagpeas:. Chicken. DENiLeS...he. A nMeAES. Gren i feng TSi.seled. Adda. Primtess.Click.on.Add.a.s : tick. ane. Shaseck..Prisacht XV Observations (use blank sheet provided if space not sufficient) Features ‘Specification availability in lab. f t Personal Computers C (For Additional Computer) / Personal Computers 3 |For End Terminals ) [Hub /Switch I [Cables a Note: Refer instruction manual / specification settings for above observation XVI Result Hive. 8. ObSeaCedh,. 0 mel for Ais. ‘Hah Lika, ISubGubables..£5, ai XVII_ Interpretation of Results Replace/ Exch 0 2 Pisce! Pxchange crossover Patch cable with Straight cable between Hub-1 and Hub- * Record effect on pinging of other computers ..... er ‘computer Networking and Data Communication (22634) _ xt Resources used NE | Instrument ‘Components Specification Quantity © [Reeser Gmftder | standead Stecifiatip | 2 Vtuxbec Free down loadable XII Actual procedure followed OPS ADR Ge OER MAE. “ “ag, Alt Rov PIES 4 Bea cay rned..CodeS.Udsiong Al: tenPlizioN) Eder the affect nba Ob Seyve the. 1S ey ric Practica ‘switch ote the SoPPLY av Weed as Meetup ae XV_ Observations (use blank sheet provided if space not sufficient) Actual simulation output observed (Student should paste the simulation output / print out) Makarashira State Board of Technical Education 7

You might also like