Scanv 1.ru - en
Scanv 1.ru - en
com
APPROVED
VATS.466535.140RE-LU
Signed and date
Manual
VATS.466535.140RE
Signed and daWtzam. inv. No.
Inv. no.
2019
.466535.140RE
appl.
P
V
CONTENT
2.2.7 Instructions for turning on and testing the operation of the product with a description of the
operations for checking the product in operation 37
2.3 Use of the product37
2.3.1 The procedure for monitoring the performance of the product as a whole 37
amp.oidnlv.
2.3.2 List of possible malfunctions during the intended use of the product and
recommendations for actions in case of their occurrence 37
. s#
Signed IdnavTue
Inv. no.
Change Sheet Document No. Signed date
VATS.466535.140RE
Once2R.A3b..3In P nOORgrIAddoveToA.VWITH.turning off the product
and 38 Lit. Sheet Sheets
Pro2V..3.4
lotaRRswabYUe.hINO
Mee
.
safety when usingPPROOlGbRzoam
wamnnAndOAnd-AAndPhPdAeRlAAndTInPsOthappointment 3158 46
Dn
N.k.2He.4tr.
9SS"
R.I'm in extreme conditionstoVmAndPIlXex "C3At
YveseAthOWithVTMV.And
Sheet
This operating manual is intended to familiarize users with the device, the
rules of operation, maintenance, maintenance, storage, transportation and
disposal of PAK "CUSS".
Signed and date
Sheet
serviced equipment;
- know and follow the instructions and manuals of manufacturers
for setting up and operating the hardware and software that are part of the
PAK "CUSS";
- know and be able to apply troubleshooting techniques,
methods for performing repair and adjustment and restoration work of the
serviced facilities, correctly assess the results obtained;
Inv. duplicate number
Sheet
Sheet
indoors and resistant to climatic factors according to group 1.1 UHL GOST RV
20.39.304-98 with the following restrictions:
- increased working temperature of the medium - plus 35 ° С; reduced operating
- temperature of the medium - plus 15 °С; relative humidity up to 80% at a
Signed and daWtzam. inv. No.
power supply from a single-phase AC network with a voltage of 187 to 242 V and a
frequency of (50 ± 2) Hz, corresponding to energy quality standards according to class 2
GOST RV 20.39.309-98.
Sheet
Hardware
Server 5 pieces.
Flash drive
DataAshur Pro 64 Gb with hardware
encryption 4 things.
Sheet
cabinet kit
Signed and date
Switchboard organizer
Inv. duplicate number
horizontal, unmanaged,
Signed and daWtzam. inv. No.
TSV, non-perforated,
drawer, console, 3U 1 PC.
Boxing optical
Inv. no.
Sheet
A4 MFP
KYOCERA ECOSYS M2040dn 2 pcs.
Document Shredder
Office Kit S-11SS 0.8x1 2 pcs.
Signed and date
TV LG 43LJ519V 4 things.
CL5808N-ATA-RG 1 PC.
Inv. duplicate number
Flash drive
DataAshur Pro 64 Gb with hardware
encryption 1 PC.
Inv. no.
A3 MFP
HP PageWide Pro 772dn 1 PC.
Sheet
Consul 1 PC.
Signed and date
PostgreSQL 1 PC.
Nginx 1 PC.
BIND 1 PC.
Inv. duplicate number
Comprehensive remedy
Signed and daWtzam. inv. No.
version at least 8.
Consul 1 PC.
Sheet
Nginx 1 PC.
Comprehensive remedy
Information Secret Net Studio
version at least 8.
1 PC.
Signed and date
Software generator
password generator 1 PC.
Hardware-software module
Inv. duplicate number
TileServer GL 1 PC.
\ Consul 1 PC.
Inv. no.
PostgreSQL 1 PC.
Nginx 1 PC.
Sheet
fixtures according to
spare parts list 1 kit
Operational
documentation
Signed and daWtzam. inv. No.
Operational
documentation
Inv. no.
Sheet
Sheet
Sheet
- visualization of information from the database on a heterogeneous graph with the ability to
updating the network topology and vulnerabilities based on data from external
sources;
- manual entry of data on personnel, staffing structure and linking to
Signed and daWtzam. inv. No.
Sheet
In accordance with this structural scheme, the following information flows can
be distinguished:
Inv. duplicate number
- in the "PS processing" data comes from the PAK "PSAP" via a communication channel in
as a response to outgoing requests (stream 1);
- data transfer from "PS processing" to "PU-L" is carried out
via removable media (stream 2);
Signed and daWtzam. inv. No.
- data transfer between "PU-L" and APK "Scan-AS" is carried out via
communication channel. Data transfer is possible only from the central "PU-L" to the
APK "Scan-AS" or from the APK "Scan-AS" to the "PU-L" of the main information center
(GIC) (stream 3);
- data exchange of operational control, planning and task control
is carried out between the territorially distributed subdivisions "PU-L" (RIC) and
"PU-L" GIC by means of OSPD using firewalls (stream 4) or on removable media
(CD / DVD, USB) (stream 7). Data transfer is carried out both from the regional
"PU-L" to the central one, and from the central "PU-L" to the regional "PU-L";
Inv. no.
Sheet
According to the role model, users are endowed with the capabilities
determined by the role, and have the appropriate access rights to conduct
Signed and date
3. The director or head of the SIC registers the event in the system.
Within the framework of one event, a single performer is possible -
RIC. Physical objects subordinate to the RIC are attached to the
event, the goals of the event are described, as well as the start date.
The event is assigned the status "Determined".
4. "Responsible" for the event is the head of the RIC,
Inv. no.
Sheet
8. The head of the RIC gets acquainted with the event and brings it to the GIC
information about the event. The event is assigned the status "In
Progress".
Signed and daWtzam. inv. No.
9. Responsible for the event, with the help of the administrator, forms in
system working groups and in each group appoints a responsible person - the
group leaders. If one user is the head of several groups at once, then
Inv. no.
the head of the RIC in the task creation interface selects which group
of this WG the Task belongs to.
Sheet
Sheet
22. Team leaders, with the help of PP-L, evaluate the implementation
subtasks, confirm or clarify tasks, work with reports on the actions of
operators, report on the work of their groups.
23. The head of the RIC, after completing all the tasks, draws up his report on
results of the event and sends it to the GIC. When a completed event
is sent to the GIC, it is assigned the status "Under review".
24. From the RIC, the collected information and reports are transmitted to the GIC using
Signed and date
25. With the help of PU-L GIC, data processing is performed, based on
which the values of analytical metrics are calculated according to the
Inv. duplicate number
Sheet
operators;
-from "PU-L" to "PS processing" unloading (export) of all
data related to the event (information about the FD, initial information for
building a multi-level topology graph, etc.);
-operators with the help of SPO "PS Processing" collect data from
external sources, primary processing, construction of the FD topology graph;
-the received information is transmitted to the Scan-AS APK via
unidirectional gateway or uploaded to "PU-L" using an external media;
perform tasks, confirm or clarify tasks, work with reports on the actions of
operators, report on the work of their groups;
-from the RIC, the collected information and reports are transferred to the GIC using
external media or directly in the presence of a communication channel (OSPD);
Sheet
1.2.4.
1.1.6.3 Sealing of PAK "TsUSS" is not provided.
1.1.7 Packaging
1.1.7.1 PAK "ZUSS" is supplied in a kit that does not provide
packaging in a general container.
1.2.1.1 Description of the purpose and operation of PAK "PU-L" and its components
Signed and daWtzam. inv. No.
1.2.2.1 Description of the purpose and operation of the PAK "PU-Z" and its components
parts are given in the following documents:
- VATS.466535.142RE PAK PU-Z. Manual";
Sheet
1.1.1.1 The description of the purpose and operation of the PS Processing PS is given in
the following documents:
-RU.VATS.00270-01 13 01 “Software tool “PS processing”.
Signed and date
Program description";
-RU.VATS.00270-01 32 01 “Software tool “PS processing”.
System Programmer's Guide";
-RU.VATS.00270-01 34 01 “Software tool “PS processing”.
Operator's Manual";
-RU.VATS.00270-01 91 01 “Software tool “PS processing”.
Inv. duplicate number
User guide".
1.2.4 Marking and sealing
1.2.4.1 The hardware of the HSS "CUSS" includes:
- purchased products;
Signed and daWtzam. inv. No.
- ZIP-O accessories.
1.2.4.2 The software tools of the PAK "CUSS" include open source software and open source software,
supplied on distribution (external optical) media (laser CDs).
Sheet
Sheet
the operational documentation for the product and who have undergone training
(internship) in the prescribed manner are allowed to work with the product.
1.4.1.2 Inspection of the product must be carried out only when
unplugged UPS.
1.4.1.3 Before starting work, the product must be grounded by connecting
ground terminal wire with ground bus.
1.4.1.4 Visually check the reliability and integrity of the connection
Inv. duplicate number
cables and grounding of components. Inspection of the component parts of the product should be
carried out only when the power supply of the product is turned off.
1.4.1.5 Power supply voltage 220 V with a frequency of 50 Hz is required
be supplied using the cables supplied with the product and having plugs with a
Signed and daWtzam. inv. No.
grounding contact. The workplace must be equipped with PA10 sockets with
protective earth.
1.4.1.6 To avoid accident while using the product
It is FORBIDDEN in the on state:
- make repairs;
- open the walls of the housing on the
- component parts; touch live parts;
- connect and not disconnect sockets and plugs;
- work with the product if the insulation of the connecting
cables.
Inv. no.
Sheet
1.4.2.2 In the presence of violations, the inclusion and operation of the PAK "TsUSS"
prohibited until removed.
1.4.3 Rules and procedure for inspecting workplaces
Sheet
1.4.6.1 Instructions for setting up the HSS "CUSS" are given in the following
documents:
- VATS.466535.141RE PAK PU-L. Manual"; VATS.466535.142RE PAK
- PU-Z. Manual";
-RU.VATS.00218-01 32 01 "Special software
"POOL". System Programmer's Guide";
-RU.VATS.00219-01 32 01 "Special software
"PU-Z". System Programmer's Guide";
-RU.VATS.00270-01 32 01 “Software tool “PS processing”.
System Programmer's Guide.
Inv. no.
1.4.7 Instructions for turning on and testing the operation of the product with
description of operations for checking the product in operation
Sheet
1.5.1.2 Meaning of the light indication of the component parts of the product
given in the following documents:
- VATS.466535.141RE PAK PU-L. Manual"; VATS.466535.142RE PAK
- PU-Z. Manual".
Signed and daWtzam. inv. No.
Sheet
User guide".
1.5.4 Safety precautions for the intended use of the product
1.5.4.1 Workers who have studied
operational documentation of the product, having a certificate not lower than
the third qualification group for electrical safety up to 1000 V.
1.5.4.2 When using PAK "TSUSS" for its intended purpose
It is FORBIDDEN in the on state:
- make repairs;
- touch the live parts of the product; connect and
- disconnect sockets and plug connectors;
Inv. no.
Sheet
- extinguish the fire from the windward side, starting from its front edge
gradually moving deeper;
- start extinguishing spilled flammable and combustible
liquids follows from the leading edge, directing the stream of powder to the burning
surface, and not to the flame;
Sheet
Sheet
1.6.4.1 Maintenance of PAK "TsUSS" is carried out in order to prepare it for work and
maintenance in a working (serviceable) condition.
1.6.4.2 Maintenance includes:
- daily maintenance (DTO); monthly
- maintenance (TO-1); annual maintenance
- (TO-2).
1.6.4.3 The listed types of maintenance are carried out
when using the product for its intended purpose.
Signed and date
Sheet
condition);
- cleaning of workplaces, premises.
1.6.4.12 TO-1 is carried out once a month, regardless of the intensity
operation of the product, as well as after the exercises and before putting it
into short-term storage. TO-1 includes:
- work in the scope of the STO;
- detailed inspection and cleaning of all equipment;
Inv. duplicate number
Sheet
Note
Types of maintenance
Name of the object of maintenance and work
ETO TO-1 TO-2
Checking the external condition and cleaning the components of + + + TC No. 1
the product without removing the modules and dismantling
Checking the performance of the product * * + TK No. 2
Instrumental check of the condition of - * + TK No. 3
the connecting cables
Installation check - * + TC No. 4
Checking the status of operational - + + TK No. 5
documentation
Legend:
- the “+” sign means that the work for this type of maintenance is being performed;
- the “-” sign means that work for this type of maintenance is not performed;
Signed and date
- the sign "*" means that the work for this type of maintenance is performed depending on the
specified conditions in table 4
TC No. 4
TC № 2* TK No. 2
TK No. 5 TK No. 5
Note - Technological operations marked in tables Table 2, Table 3 with the sign "*" must be
performed under the conditions specified in table 4
TC No. 4 TO-1 Execute in case of detection of malfunctions in the operation of the product
1.6.4.18 Technological charts for the maintenance of the product are presented in
appendix A.
Sheet
1.6.4.22 The preservation method consists in isolating the product from air with
using packaging materials, followed by drying the air in an isolated volume
with a desiccant (silica gel).
1.6.4.23 Silica gel filling rates when used as
packaging materials of covers made of polyethylene film during storage of the
product ensure the maintenance of relative humidity of no more than 55% by the end
of storage.
1.6.4.24 Before placing the silica gel inside the isolated volume of its
packaged in bags.
1.6.4.25 Preservation should be carried out in the following order:
- clean the product and its components from dust and
Inv. no.
Sheet
boxes as follows:
- after conservation according to3.1.6 place the product, UPS, ED, kit
Spare parts and other components of the product in a cardboard box, sealed with cardboard.
1.6.4.28 Depreservation of the product and its components should be carried out in
following sequence:
- open cardboard packaging; open the
- covers, remove the components.
Inv. duplicate number
packaging and replacement of silica gel bags with further sealing of the inner
packaging.
Inv. no.
Sheet
unplugged UPS.
1.7.2.2 Maintenance of the PC should be carried out only when the
PC and a power supply disconnected from the mains.
1.7.2.3 Repair the product in heated rooms when
ambient temperature from plus 15 to plus 35 -C. Illumination in the room
should be at least 300 lux at a height of 0.8 m from the floor level. Emergency
lighting from a separate power source must be provided.
1.7.2.4 Carrying out work under paragraph 1.5.2 of this OM is carried out when
disconnected power cables from the UPS.
1.7.2.5 To prevent injury, DO NOT:
Inv. no.
Sheet
Sheet
Sheet
Topic #1
Signed and date
1
Product PAK "TsUSS". Key points
Purpose, composition, main technical characteristics of the product,
1.1 3
block diagram
The procedure for inspecting and checking the readiness of the product for its
1.2 3
intended use
Product operating modes. Description and operation of the equipment
1.3 6
components of the product
The procedure for monitoring performance, measuring
1.4 6
parameters, regulation (settings)
Inv. duplicate number
Sheet
Sheet
The procedure for performing the work of TC No. 1 is given in Table B. Table B.1.
Description of troubleshooting
The content of the work and
Signed and date
Check the condition of the external Clean the outer surfaces of the
surfaces of the components of the components of the product and front
product and front panels, paying panels; remove dust and dirt with a soft,
attention to their slightly damp cloth
integrity, no signs of
mechanical damage Check
reliability If necessary, strengthen the fastening of the
Inv. duplicate number
Sheet
Description of troubleshooting
The content of the work and
or maintenance work Control
technical requirements
service
Perform the operations specified in If a message about the successful launch of the open
1.4.7 of this OM source software is displayed on the monitor screen, then
the product is considered to be operational.
Signed and date
- - -
Signed and daWtzam. inv. No.
Inv. no.
Sheet
cables
composite parts of the product
check reliability
cable connections.
Check the performance of the
product in accordance with TC
No. 2
Tool and
Measuring materials
accessories
- - -
Sheet
products; alcohol
- reliability of fastening of individual
devices and parts;
- wire integrity.
When performing work
IT IS FORBIDDEN:
- check mechanical
strength of solder joints by bending,
pulling or wiggle wires;
- replace twisting
Inv. duplicate number
soldering
wires;
- produce mechanical
purge silver plated And
gilded surfaces
Signed and daWtzam. inv. No.
Sheet
Scotch
- -
Glue
Signed and daWtzam. inv. No.
Inv. no.
Sheet
PD - opposition
BY - software
PS - software tool
PC - personal electronic computer
RIC – regional information center
RKD – working design documentation
DCS – distributed control system
RE - manual
SAVZ - anti-virus protection
SVT – computer equipment
Inv. no.
Sheet
Sheet
Sheet