TELEPHONE SETTING LAYOUT-CAMEL FARM-Model
TELEPHONE SETTING LAYOUT-CAMEL FARM-Model
TELEPHONE SETTING LAYOUT-CAMEL FARM-Model
AREA
1. Contractor has to approach ETISALAT Utility Services office Building contractor should furnish FTTH and SCS (Structured Cabling
before commencement of the work to confirm the necessary and System) within the plot / buildings as per the approved drawing and
latest telecom requirements and obtain the approval of the FTTH latest TRA requirements, such as:
materials.
CCTV LEGEND 2. The contractor has to install, test and commission latest telecom
accessories before applying for Etisalat Completion Certificate.
3. All FTTH materials and accessories must be purchased from
· Entry Ducts (Lead-in): are to be laid at 60 cm below road level
and to be provided with 6mm diameter nylon rope inside.
· Entry box (JRC/normal manhole): JRC (size & construction
approved brands and to be installed according to manufacturer's
details as per Etisalat standard)/ normal manhole (to be
specification.
4. As per Etisalat and TRA guideline, maintenance of telecom reinforced concrete structure, minimum size should be
SYMBOL DESCRIPTION QTY network within the plot limit is the sole responsibility of building
owner and contractor.
60X60X90, with a heavy duty cover of rating grade 'A' and
“Telephone” mark graved on it.
5. If the project already identified as Mega/ Al Taawun project, · Fiber Distribution Hub (FDH) at main telephone room: Either
contractor has to approach Etisalat Mega project Department patch free FDH or as advised by Etisalat at building completion
to confirm the necessary requirement before the commencement
stage. It should be equipped with FO Patch panel for feeder
of telecom work.
9U CABINET 1 Nos 6. All fiber cable in the main telephone room are to be arranged and cable, Optical splitters and FO Patch panels for multicore/drop
dressed in floor wise and to be labeled with 'plastic or metal fiber.
number tags'. (Flat#, Shop#, Office#). · Labeling: Proper labeling should be done as per Etisalat
7. Detailed information on Structure Identification Plate is to be standard and copy of Block Wiring Schedule to be placed on
collected from Etisalat Utility Service section at least 3 months
12U ONT BOX
12U ONT BOX 3 Nos before completion.
cabinet door.
8. Main telephone room, contractor should coordinate with Etisalat · Multicore riser cable with 30% spare fiber to be laid from
for the final position of lead-in ducts (Entry pipes), Power sockets, main telephone room to mini ODF location with an extra loop of
isolators, earth bar, Lights, AC ducts/units and other Equipment 3Meter and must be terminated at both ends using SC/APC
of Etisalat. connector.
MANHOLE(60X60X80)CM 24 Nos 9. Cable trays, channels (trunking), ladder for telephone cables and
· Risers to each tenant: Install minimum (4) core, Single mode
wires are to be provided and installed as per Etisalat & TRA
Fiber cable, ITU standard G 652 (Low smoke zero halogen
specifications.
type) from each tenant continuously up to mini ODF or FDH in
NOTE:
10. All Telephone rooms, joint boxes, manholes and ducts are
for the sole use of Etisalat and do not pass or run any other FTR or MTR room with an extra loop of 3M at both ends.
services inside them. · ONT boxes: Minimum sizes (residential: 60x60x15cm and
PVC PIPE ---------- 11.Provide separate Earthing to telephone rooms and the
resistance should be less than One Ohm.
commercial: 60x60x30cm) or as specified in the drawing. It
should be equipped with twin 13A dual sockets, RJ45 patch
12. As and until it is not specified in drawing, all the internal conduits
are to be 25mm diameter. panel, CAT-6 cables, CAT-6 Patch cords and Micro ODF
13. GSM: Contractor must coordinate and submit the relevant (rosette). It is to be positioned in a secure and easy accessible
documents to mobile Access-Planning Section at least 6 months location at a height of 120cm above FFL.
before closing the false ceiling. · CAT-6 (4pair - 8core) unshielded twisted pair (UTP/STP)
14. “TEL” is to be written visibly on the compound wall/tiles where the
cables to be provided in star topology, individually and
lead-in ducts laid out to the road.
15.Building contractor should link the lead-in ducts with Etisalat continuously from each twin RJ45 socket up to the ONT box,
plant under Etisalat supervision. with an extra length of 0.5metre at the sockets and 2 meter at
16.Interlocking: Contractor must coordinate with Etisalat Utility the ONT box.
Service Section at least three months before starting any · Twin RJ45 sockets with CAT-6 cable termination are to be
interlocking work.
installed for all telephone/data/E-vision outlets, proper labeling
17.Refer and follow revised TRA manual for latest telecom
as per Etisalat requirement to be done on both sockets and
specifications and requirements.
patch panel.
#46
PREGNANT PEN
#47 TOTAL PLOT SIZE
E OIR
FIR RV US.
PREGNANT PEN 96.41 HECTARE MALE
M SE 00 .
L I IT RE 0,0 AL
3 G
PEN
PLOT
ROOFLINE
ENTRANCE ABOVE
GATE
ROOFLINE
ABOVE
IR .
O AL
ENTRANCE
(FUTURE) #76
GATE
RV . G
REP S S
A
AH
ROOFLINE
ICEPS
SE US
GATE
RT RE
± 0.00
HGUO
RE 00
ROOFLINE
R
FFL
LFOO
ABOVE
A ENI
,0
EVOB
80
ENTRANCE
R
GATE
#48
ILFOO
± 0.00
REP S S
A
AH
A EN
EVOB
ICEPS
#75
RT RE
± 0.00
HGUO
R
FFL
ILFOO
P
A EN
M M
EVOB
PU OO
PRE-CAST
FEEDING
R
TROUGH
ILFOO
AS PER
SPECIALIST
PREGNANT PENS
PRE-CAST ± 0.00
A EN
R
FEEDING
ROOFLINE TROUGH
ABOVE AS PER FFL
EVOB
SPECIALIST
ROOFLINE
ABOVE
ROOFLINE
ABOVE
PRE-CAST
FEEDING
ROOFLINE
TROUGH ABOVE
AS PER
SPECIALIST
PRE-CAST
FEEDING
PRE-CAST
TROUGH FEEDING
TROUGH
#52
AS PER
SPECIALIST AS PER
SPECIALIST
PRE-CAST
FEEDING
(FOR FUTURE)
ROOFLINE TROUGH
AS PER
ABOVE SPECIALIST
#74
ROOFLINE
ABOVE
ABOVE
FFL
± 0.00
ROOFLINE
#51
ABOVE
ROOFLINE
FFL
#73
TROUGH
± 0.00
SPECIALIST
AS PER WATER
SHARED
ENTRANCE
GATE
NEW DEVELOPMENT
ROOFLINE
ABOVE
#72
ENTRANCE
GATE
ROOFLINE
#50
ABOVE
DUCT
TO
EX
IST
2x50mmØ PVC
ING
#71
TE
GABI
L RO
OM
ON W CA #49 #70
ALL (FOR LF PEN #69
FUTU #68
RE)
DUCT
#67
2x50mmØ PVC
H.
M.
#64
CM
OWNER:
80
0X
OFFICE / #44
X6
60
DUCT
GABI #62
FUTURE ROAD ACCESS
2x50mmØ PVC
VISITORS/BUS
MAIN PARKING PREGNANT PEN ON W #61 #63
TRAINING
DUCT
ENTRANCE
ALL F
2x50mmØ PVC
MALE #60
DS E
OR W
AN L
.
M.H
PENS
DUCT
80 CM
ATER #59
60X EVOB
A ENI
60X 60
LFOO
R
X6
2x50mmØ PVC
0X TSILA
I CEPS
80 REP S
A TSI
OF OP
CM CT
LAICE
PS RE
P SA HG
M. UORT
PREGNANT PEN
GNID
H. DU EEF T
SAC-
ERP
C
(CUR
B
L IMIT
Ø
CHAN
mm
50
F
2x
#57 #58
DR
PLOT
R
ILFOO
NEL ENT
A EN
MAIN
EVOB
OM
RO
#90
HGUO
TY
TSILA AW DERA
RT R
SEC
ET
ICEPS
T
#56
INE
EXISTING
#19
LFF
PHAS
CAB
REP S
BOX
.
ONT
12U
00.0
G
9U M.H ±
2x50mmØ
HS
A
DUCT
80 CM
60X
#80
60X
IN 2x50mmØ PVC
PVC DUCT
ENTRANCE
CALF PEN #39 E)
EVOB
A EN
#55
ILFOO
R
ENTRANCE FOUNTAIN
RK
GATE &
MILKING PENS #79
HGUO
PA
ICEPS
R
#54
TSILA
ETAG ICEPS
#36
ECNA LFA F
REP S S
REP S
AH
±
SUBSTATION
P SA
A
HG UORT
GNID
EEF T
SAC-
#13
ERP
#81
R
ILFOO
P
A EN
EVOB
ROOM AS PER
VI
EVOB
#53
A EN
ILFOO
R
NURSERY PEN
GATE
DESIGN
#35 #23 FATTENING
ETAG
ECNA
RTNE
M
L I IT
AS PER WATER
SHARED
NURSERY PEN
SPECIALIST
PLOT
TROUGH
GATE
± 0.00
PEN
ENTRANCE
FFL
CT
#32 #78
DU
H.
#34
M.
C
PV
CM
FATTENING
GATE
80
mm
ENTRANCE
0X
50
#77 #82
X6
2x
QUAR
60
ABOVE
ABOVE
ROOFLINE
NURSERY PEN
ROOFLINE
NURSERY PEN
AS PER WATER
SHARED
ANTI
SPECIALIST
#18
SPECIALIST ABOVE
AS PER
BRIDGE 03
ROOFLINE
TROUGH
CT
± 0.00
#31
SPECIALIST
AS PER
#33 PEN
TROUGH FFL
DU
FEEDING
PRE-CAST
#83
ABOVE
AS PER WATER
C
ROOFLINE
SHARED
PV
NE P
SPECIALIST
Ø
mm
TROUGH
50
± 0.00
2x
FFL
ABOVE
NURSERY PEN MILKING PENS
ROOFLINE
#30 #6 ON W (CUR
EVOB
A EN
ILFOO
R
ABOVE
TSILA SPECIALIST
ICEPS AS PER
REP S
A TSILA
ROOFLINE
SPECIALIST
ICEPS AS PER
REP S
A HG TROUGH
UORT
GNID FEEDING
EEF T
S AC-E ABOVE PRE-CAST
RP
ALL F RENT
ROOFLINE
EVOB
A ENI
LFOO
R
#28 #88
.
M.H TSILA
ICEPS
SPECIALIST
AS PER
80 CM
REP S
CT
A TSI
CONSULTANT:
LAICE SPECIALIST
PS RE AS PER
P
60X SA HG
DU
TROUGH
UORT
GNID
60X
FEEDING
NURSERY PEN
ERP ABOVE
C
ROOFLINE
PV
OR W
EVOB
PHAS
A EN
R
ILFOO
LFOO
Ø
#87
mm
A ENI
TSILA
ICEPS
REP S
50
EVOB
A TSI
LAICE
P S REP
2x
HGUO
SA HG
UORT
GNID
EEF T
NURSERY PEN
RT RE
ERP
#29
ICEPS
EVOB
ATER
A EN
R
ILFOO
ILFOO
LFF R
REP S S
00.0
AH
±
A EN
TSILA
ICEP
A
S RE
P SA
EVOB
TSILA
ICEP
S RE
P SA
HGU
HGUO
RT G
NIDE
EF TS
#27
ORT
#11
TSILA AW DERA
AC-E
RP
RET
ICEP
EVOB
A EN
R
ILFOO
ILFOO
S RE
LFF R
FU T #22 CHAN
00.0
P SA
±
A EN
TSILA
HS
ICEP
S RE
EVOB P SA
NURSERY PEN
EVOB
TSILA
(FUT ANTINE
A ENILF ICEP
OOR S RE
P SA
HGUO
HGUO
RT G
NIDE
EF TS
TSILA AW DERA
AC-E
RT R
RP
94.4
ET
ICEP
OR
S RE HS
LFF
O
#84
ENILF
00.0 ±
URE
P SA
NURSERY PEN NEL
A
EVOB
EVOB
A EN
ILFOO
R
HGUO
TSILA AW DERA
RT RE
FEMALE DRY PEN
ICEP
T
URE
R
P
ETAG
S RE HS
ILFOO
ECNA
RTNE LFF
00.0 ±
P SA
A EN
PREGNANT PENS PHASENS
EVOB
EVOB
A ENI
ROA
LFOO
R
HGUO
TSILA AW DERA
RT RE
ICEPS
T
ETAG
ECNA LFF
REP S
RTNE
00.0
±
HS
A
EVOB
A ENILF
OOR
CT
D AC
DU
C
ETAG
PV
E)
ECNA
. RTNE
M.H
Ø
80 CM
mm
EVOB
A EN
ILFOO
60X R
50
60X
2x
CES
ETAG
ECNA
RTNE
GROWING
CT
MILKING PENS
PV
ENGINEERING CONSULTANT
Ø
mm
50
2x
60X
60X
80 CM
M.H
.
PENS
DU
MILKING PEN
M.H.
50
2x
80 CM
M.H
80 CM
60X60X
PENS
12U ONT
CCT
BOX
V RAC
K
2x50
mmØ
M.H.
80 CM
60X60X
CT
DU
MILKING PENS
C
PV
Ø
mm
50
2x
#4 SPECIALIST CONSULTANT:
CT
DU
C
PV
FU MILKING PEN
Ø
mm
50
2x
TU 60X
60X
80 CM
M.H
.
#20 #9
RE MILKING PEN
2x50
mmØ
PVC
DUC
T
RO FATTENING
CT
#15
DU
C
PV
AD
Ø
mm
50
M.H.
2x
#14
80 CM
AC PENS
60X60X
CE FATTENING #3
S FATTENING
S 80 CM
M.H
.
60X
60X
DU
C
PV
Ø
mm
50
2x
MILKING PEN
PVC
DUC
M.H.
T
80 CM
AGITATOR/PUMP:
60X60X
CT
DU
PROJECT :
C
PV
Ø
mm
3mx3mx3m pit
50
2x
M.H
.
MILKING PEN PARLOUR
80 CM
60X
60X
2x50
mmØ
. PVC
M.H DUC
T
80 CM
60X
60X
Ca
80 CM M.H.
Ra melT
ilin rac
60X60X
g S k-
am
ple
12U ONT
BOX
CT
DU
C
PV
Ø
2x 50mm
mm
Ø PVC
50
DUC
T
2x
60X
60X
80 CM
M.H
.
.
M.H
80 CM
60X
60X
M.H.
60X6
0X80
CM M.H.
DRAWING TITLE
DATE
DRAWN BY
INSPECTED BY
DISCIPLINE
PROJECT NO
FIRE FIGHTING
FF -
1007-MAY-