Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
345 views
10 pages
06 HIRA Pile Load Testing
Uploaded by
Sajeen Bensihar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download
Save
Save 06 HIRA Pile Load Testing For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
0 ratings
0% found this document useful (0 votes)
345 views
10 pages
06 HIRA Pile Load Testing
Uploaded by
Sajeen Bensihar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Carousel Previous
Carousel Next
Download
Save
Save 06 HIRA Pile Load Testing For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
Download
Save 06 HIRA Pile Load Testing For Later
You are on page 1
/ 10
Search
Fullscreen
Express Freight Consortium EFCF-011 Dedicated Froight Corridor Project (Sachin - Vadodara Section of Western Corridor Phase-2), Civil, Building and Track Works, Packago— CTP -13 HIRA NO- EFC/SHE/HIRA/06 Rev:00 HAZARD IDENTIFICATION AND RISK ASSESSMENT FOR PILE LOAD TESTING Project: WESTERN DFCCIL PROJECT - CTP-13 (Sachin - Vadodara) Location: Chalnage 660131 Section I 3 | Base Risk ee [tay og |hel x As Contr! Mea 2 sue S38 ee 4 g | 35 2/8) « (ocr, HSMP, PPE et) | =| slags |é ff : \8) 3 @ sg) z/ece |e i 3 E|8 Seisee jow safe practice of uncoiling | strands (Dia Uncoil from bottom not from top acess Accident hit | Cuttnjuries | ]3 [2/6 | 6 stand at safe side while unc | site | with Stee! terre + Usehand protection by proper | 1 |3 | 3 | ALARP | Engine Core) fom its | loves reel + Lock the rel rotation ater un coiling to avoid accidental | Totationon it's own . ‘© Avoid creating sharp edge. Fixing ofeable | grees | > | sasigthe | R | Sharpedges | injury ne (3. elie | Ja f2 }2 |arare | site Peo | Engine welding | | | | ee ae Road, Vadodara - 390002 Vadodara office: TATA Projects Ltd,2" Floor, Keval Corporate Park, Opp. GEB Station, ChanExpress Freight Consortium EFCF-011 Welding Eye Injury Use welding shield of proper hazards shade ALARP | Engine Buminjury [N {1 [2 [2 ‘© Mark hot material ALARP Site Engine Flectrocution |N [2 [4 | 8 © Follow all electrical precautions ALARP Fire Risk Nola 12s = Keep the combu flammables away from welding, ie extinguishers near work | ALARP Site Engine Page 2 of 10 Mim Vadodara office: TATA Projets Ltd.2" Floor, Keval Corporate Patk, Opp. GEB Station, Channi Road, Vadodara - 390002Express Freight Consortium EFCF-011 Dodicatod Froight Corridor Project Jadedara Section of Wostern Corridor Phaso-2), ing and Track Works, Package - CTP -13 HIRA NO- EFC/SHE/HIRA/06 Rev:00 information on MSDS of Epoxy material . 1 ft fa | ALARP | 9 | Bron coating tnhatonor Jue [fa fa [a | NR | epoxy fumes | | Skin contact | Skin Problem |N [3 |1 |3 © Userelevant hand gloves while | with epoxy 1 fa | avare | i | Flammable] Fiensk | N [2 [3-}@ | + Keepaway fom freandsparks [1 [33 | | ALARP | site Engine | er foal N]2 Ta |e | + Wear eye protective spestacies. [1 [4 4 Sprinkting quartz sand ALAR? | Site mixture on Engine epoxy coated rs eae + Use proper handgloves Site nr sharpedges | Cuttnjury | |3 |2 |6 1 2 |2 | aLaRp | Engine 5 | by Metal Arc R er Welding - MrTsu 8. co.tTD, Page 3 Mia Vadodara office: TATA Projects Ltd.2™ Floor, Keval Corporate Park, Opp. GEB Station, Channi Road, Vadodara - 390002Express Freight Consortium EFCF-011 Dedicated Freight Corridor Project (Sachin - Vadodara Section of Westorn Corridor Phaso-2), Civil, Building and Track Works, Package CTP -13 HIRA NO- EFC/SHE/HIRAIO6 Rev:00 cs ‘Use welding shield of proper T Welding shade, R | hazards Byelnjuy |N |2 |3 |6 3 T Site ALARP | Engine Buminjury [N {1 2 [2 Mark hot materials Tze: N 2 (4 [8 . F ectrical precautions [1 [4 [4 to electrical shock risk. | LARP | Engine Fire Risk N [2 (4 [8 | © Keepihe combustible and i [4 [4 | flammables away from welding | ARP areas, ‘+ Keep fire extinguishers near work place. Damageand |N |2 |3 |o San the area for hole dia about injuriesto | ‘© Inform to the owner 2cmsand | NR Persons ‘© Ensure that no underground >30 feet depth) i 1/3 |3 | Acar | site 6 Di jon to Engine Page 4 Mim Floor, Keval Corporate Park, Opp. GEB Station, Channi Road, Vadodara - 390002 Mirsul a co.tro,Express Freight Consortium EFCF-011 HIRA NO- EFC/SHE/HIRA/O6 Rev:00 | ] Noe Noweinduced |N [4 [1 [4 ] © UseEarPhugs T]1 [1 [ACARP | Site | asia laa | | eae L = sa Byeljuries [N [2 [3 [6 | © Useeyeproteative spectacles 33 [ALARP [Si Engine Sharp & ries [N [2 [3 [6 | + UseSafeyshoes 3 [3 | ACARP | Site projected parts Engine | | on floor or | | | | | | [RR [Titty ee | Cwvabrsion PN [S [3 [I | T [3 [3 | ACARP | Site Inserting ends the cable injuries Engine 7 | complete cable strands er ito the drilled hole mane Cuvabrasion [N [1 [2 [2 | © Keep people away from the T [2 [2 | ACARP injuries é Engine pipeimothe | | i | langer area. ow Centre of the | | ane | routing | | NR | Fall of cement N [3 [2 [© | © Useeye protective spectacles [1 |2 [2 | ALARP | Si fs | eee | grout into Use eye protective spectacles Sie | in gine g | cement grout | pa bh up toa depth of 1Ometers. | | : sys” Vadodara office: TATA Projects Ltd.2™ Floor, Keval Corporate Park, Opp. GEB Station, Channi Road, Vadodara - 390002Express Freight Consortium EFCF-011 Dedicated Freight Corrior (Sachin - Vadodara Section of Western Corridor Phase-2), ing and Track Works, Package — CTP -13 HIRA NO- EFC/SHE/HIRA/06 Rev:00 | Struck by Physical . accidental sip | injuiesmay [vy ]3 | | 2 1 [4 Ja | atare | site NR | ofstressing | be of serous Keep un authorized persons away Engine jack nature from the danger area, er arrangement or . ks ar placed properly by Sharp edges ety pack or snapped © Ensure proper sup Stressing and poms sn = 10 | locking of each Set sieing) | strand of cable before commencing th operation | es 2a Faltal sare Site 1 ]4 4 | ALAR | Engine Unauthorized a r operation MR Ti ijury due + Medical fess oFapenaors wbe [1 [4 [4 | ALARP twoarneous fy fi [4 [4 checked before engaging him. movement I — a eens > mirsui 8 co.tr, L PageExpress Freight Consortium EFCF-011 HIRA NO- EFCISHE/HIRA/06 Rev:00 materials crane with respect to boom length & horizontal angle by referring ‘manufacturer load chart ‘© Load chart of the crane displayed at the operator's cabin, Use of mobile WN] ]# ]# ] + Prohibition ofmobile phone [1 [4 ]4 [ ALARP | Site phone by usage by the erane operator & Engine operator in bit ‘Overloading | Crane toppling |N [2 [4 [S| + Verifying the weight ofan object [1 [4 [4 | ALARP | Site of crane & fall of to be lifted against SWL of the Engine injury due |N [2 |4 [8 ‘Engagement of trained & T {4 to wrong crane Siena caine | movement + Reflective jacket worn by Miscommunie 4 | ALARP | Site Engine Wrong rieging | practices T | ALARP Vadodara office: TATA Projects Ltd..2" Floor, Keval Corporate Park, Opp. GEB Station, Channi Road, Vadodara - 390002 tis aExpress Freight Consortium Dedicated Freight Corridor Project EFCF.011 (Sachin ~ Vadodara Section of Western Corridor Phaso-2), cw ising and Track Works, sckage ~CTP 13, HIRA NO- EFC/SHE/HIRAIO6 Rev:00 Vadodara office: TATA Projects Ltd,2™ Floor, Keval Corporate Park, Opp. GEB Station, Ch Road, Vadodara - 390002 Tiling Toad ‘damage Use of packing at the sharp with sharp of load comes. PS Nonfunctionin | Unconwoliable | N24] & Ta ATARP gofsafety | movement devices switch is provided and checked for effective BR | Oispiliage | TandPottuion | N/T] ca ALARP | Site 12 | General a : Noise INH ees eel Weekly mai T [2 ALARP seneraton censured by the ageney i Corton waste Ng aneal tala Coiion waste salle collected [1 _[T ALARP immenedin separately and disposed | Energy peeing | elas ‘Weekly maintenance by sub- ra ‘ALARP consumption contacto to ensure eneray nintended | resources efficiency. consumption) : Struck by | Physical |N |2 [3 6 Clear access must be providedio [1 | 3 ‘ALARP Further locking Es cs 43 | ofeablesrands | NR | sharpends of | injries siivitieam | | sts | i Page 8 of 10 wera a c0..70, MaExpress Freight Consortium EFCF-011 Dedicated Freight Corridor Project (Sachin - Vadodara Section of Wostorn Corridor Phase-2), Ci, Bulding and Track Works, Package CTP -12 HIRA NO- EFCISHEIHIRA/OS Rev:00 adel Slipand hitby wz 2 + Use only safe ols in safe way, [1 ]2 [2 | ALARP [Site unsafe hand | injuries ‘No make shift tools shall be used Engine | tools site a esta [Fallofjackon | Physical ——[N—]2—]2 [4 | © Handle the jacks carefully To] 2 | ACARP | Site 14 eure | dry before handling to avoid slips er jcks on pile 13 and falls. head lel Tiyraulisol N ales as 1/2 |2 | ACARP | Site Engine | 5 ALARP | Site Engine | Fa Ph n [3 fa fi 1 fa fa rs | injuries may 5 a | eof serious Toad, with 2 nature incremental | | 7 | or more jacks : or procedure as mentioned i Des Approved method statement for ure of : strands under | personnel are deputed 0 carry ou | high tension this load test. | | | + Mrrsui a co.LTD, Page 9 of 10 Mim Vadodara office: TATA Projects Ltd,2* Floor, Keval Corporate Park, Opp. GEB Station, Channi Road, Vadodara - 390002Express Freight Consortium Decliated Freight Condor Pro (sect EFCF-011 HIRA NO- EFC/SHE/HIRAIO6 Rev:00 Dismantling structural support and other arrangements, Barricade the danger area. Severe (Reportable Minor(Non reportable) ‘Negotiable Date: 03/05/2016 Signature: ‘) ¢ Prepared By: Name: Sajeen G Bensihar Designation: Safety Officer Signature: Reviewed By: Name: Sajay Mishra Designation: SHE Director Vadodara office: TATA Projects L1d.,2% Floor, Keval Corporate Park, Opp. GEB St € Signature: ‘Approved By: Name: Tapas Bast Designation: Consi Channi Road, Vadodara - 390002
You might also like
Escorts F23
PDF
No ratings yet
Escorts F23
2 pages
Sw-Hsef01-Hira Cable Trench & Compound Wall Construction
PDF
No ratings yet
Sw-Hsef01-Hira Cable Trench & Compound Wall Construction
6 pages
HIRA For Manual Sewer Line Cleaning
PDF
No ratings yet
HIRA For Manual Sewer Line Cleaning
5 pages
Cement Feeding From Bulker To Silo JSA HSE Professionals
PDF
100% (1)
Cement Feeding From Bulker To Silo JSA HSE Professionals
1 page
Hira Painting Work
PDF
No ratings yet
Hira Painting Work
2 pages
Purpose and Importance of Vertigo Test at Construction Site
PDF
No ratings yet
Purpose and Importance of Vertigo Test at Construction Site
21 pages
HIRA - Night Work
PDF
No ratings yet
HIRA - Night Work
3 pages
ME - HIRA No 41 False Ceiling and Dry Wall Partion Works
PDF
No ratings yet
ME - HIRA No 41 False Ceiling and Dry Wall Partion Works
72 pages
Drain Line Work JSA
PDF
No ratings yet
Drain Line Work JSA
2 pages
Hira Gi Piping
PDF
No ratings yet
Hira Gi Piping
1 page
Documents of 80' Boom Lift and Its Operator.
PDF
No ratings yet
Documents of 80' Boom Lift and Its Operator.
14 pages
Rebaring Work Jsa
PDF
No ratings yet
Rebaring Work Jsa
1 page
HIRA - Pier Arm
PDF
No ratings yet
HIRA - Pier Arm
14 pages
HIRA Excavation
PDF
No ratings yet
HIRA Excavation
2 pages
HIRA For Drain Pipe Installation.
PDF
No ratings yet
HIRA For Drain Pipe Installation.
11 pages
EHS VI 09 Ajex
PDF
No ratings yet
EHS VI 09 Ajex
1 page
Chain Pulley Block Check List
PDF
No ratings yet
Chain Pulley Block Check List
1 page
JSA For EXTERNAL FAÇADE - CURTAIN WALL
PDF
No ratings yet
JSA For EXTERNAL FAÇADE - CURTAIN WALL
7 pages
Traffic Management Plan
PDF
No ratings yet
Traffic Management Plan
37 pages
Electrical PDB Checklist
PDF
No ratings yet
Electrical PDB Checklist
2 pages
05 HIRA Piling
PDF
No ratings yet
05 HIRA Piling
8 pages
Man Lifter SWP BF#02
PDF
No ratings yet
Man Lifter SWP BF#02
14 pages
JSA Excavation Chipping Work 03
PDF
No ratings yet
JSA Excavation Chipping Work 03
11 pages
Erection of Fabricated Bridge JSA HSE Professionals
PDF
No ratings yet
Erection of Fabricated Bridge JSA HSE Professionals
1 page
HIRA For U - Girder Casting Yard
PDF
No ratings yet
HIRA For U - Girder Casting Yard
5 pages
Jsa Cladding
PDF
0% (1)
Jsa Cladding
3 pages
Checklist For Equipment Inspection Bar Cutting Machine
PDF
No ratings yet
Checklist For Equipment Inspection Bar Cutting Machine
1 page
Jsa Manual Handling
PDF
No ratings yet
Jsa Manual Handling
72 pages
AHA - Erection of Purlins & Roof Liners in Hangar
PDF
No ratings yet
AHA - Erection of Purlins & Roof Liners in Hangar
6 pages
Hira of RCC Work
PDF
100% (1)
Hira of RCC Work
2 pages
DHDS Tank Area Civil Works
PDF
No ratings yet
DHDS Tank Area Civil Works
4 pages
JSA - Transit Mixer & Boom Pump
PDF
No ratings yet
JSA - Transit Mixer & Boom Pump
4 pages
Building and Other Construction Workers Rules 2007
PDF
No ratings yet
Building and Other Construction Workers Rules 2007
144 pages
Concreting by Mixer Machine JSA HSE Professionals
PDF
0% (1)
Concreting by Mixer Machine JSA HSE Professionals
2 pages
HIRA - For - Assembly - Erection - of - Structure - AIROLI SITE
PDF
No ratings yet
HIRA - For - Assembly - Erection - of - Structure - AIROLI SITE
12 pages
HIRA - Rope Pulley
PDF
No ratings yet
HIRA - Rope Pulley
6 pages
Hira Brick Works-Skaf Manipada
PDF
No ratings yet
Hira Brick Works-Skaf Manipada
2 pages
Hira RCC Cement Mill
PDF
100% (1)
Hira RCC Cement Mill
2 pages
Hira Cutting of Rod
PDF
0% (1)
Hira Cutting of Rod
2 pages
HIRA of Anti Termite.
PDF
No ratings yet
HIRA of Anti Termite.
1 page
Monsoon Action Plan
PDF
No ratings yet
Monsoon Action Plan
8 pages
Risk Assessment Scaffolding, Painting, Stone Cutting & Fixing and Working at Height Work ISO 45001
PDF
100% (1)
Risk Assessment Scaffolding, Painting, Stone Cutting & Fixing and Working at Height Work ISO 45001
7 pages
JHA (Excavation of IPS Rev. B)
PDF
No ratings yet
JHA (Excavation of IPS Rev. B)
4 pages
JSA FOR Maxseam
PDF
No ratings yet
JSA FOR Maxseam
20 pages
JSA - Area Hard Barrication
PDF
0% (1)
JSA - Area Hard Barrication
1 page
Project Ohs Induction
PDF
No ratings yet
Project Ohs Induction
54 pages
ISLA JHA Wall Protection
PDF
No ratings yet
ISLA JHA Wall Protection
4 pages
001 JHA On Batching Plant Ice Plant Erection
PDF
No ratings yet
001 JHA On Batching Plant Ice Plant Erection
11 pages
Fixing of GI Sheet
PDF
No ratings yet
Fixing of GI Sheet
1 page
Al Musairie Trading & Contracting Co. Qatar WLL: Hazard Identification & Risk Assessment
PDF
No ratings yet
Al Musairie Trading & Contracting Co. Qatar WLL: Hazard Identification & Risk Assessment
9 pages
M/S Pagwin Construction
PDF
No ratings yet
M/S Pagwin Construction
5 pages
DLF RCC Hira
PDF
No ratings yet
DLF RCC Hira
8 pages
Jsa For PCC
PDF
No ratings yet
Jsa For PCC
6 pages
M/S Gubbi Civil Engineer: Hazard Identification & Risk Analysis
PDF
No ratings yet
M/S Gubbi Civil Engineer: Hazard Identification & Risk Analysis
3 pages
Jsa Compressor
PDF
No ratings yet
Jsa Compressor
9 pages
Method Statement For CHP Bracing
PDF
No ratings yet
Method Statement For CHP Bracing
6 pages
Cable Installation Risk Assessment
PDF
100% (1)
Cable Installation Risk Assessment
2 pages
Jsa For Admin Building
PDF
No ratings yet
Jsa For Admin Building
5 pages
JSA Coco-Cola - New
PDF
100% (1)
JSA Coco-Cola - New
2 pages