Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
77 views
6 pages
Power System-II, Exp-5
Power system
Uploaded by
Ritoban Sengupta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download
Save
Save Power System-II, Exp-5 For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
0 ratings
0% found this document useful (0 votes)
77 views
6 pages
Power System-II, Exp-5
Power system
Uploaded by
Ritoban Sengupta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Carousel Previous
Carousel Next
Download
Save
Save Power System-II, Exp-5 For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
Download
Save Power System-II, Exp-5 For Later
You are on page 1
/ 6
Search
Fullscreen
ASANSOL ENGINEERING COLLEGE DEPARTMENT OF ELECTRICAL ENGINEERING POWER SYSTEM LABORATORY POLARITY, RATIO AND MAGNETIZING CHARACTERISTICS OF C.T AND P.T Experiment No : PS- 692/5ASANSOL ENGINEERING COLLEGE DEPARTMENT OF ELECTRICAL ENGINEERING SUBJECT: POWER SYSTEM LAB CODE:-EE-692 Experiment No. : PS-692/5 TITLE: POLARITY, RATIO AND MAGNETISATION CHARACTERISTICS TEST OF CT AND PT. To measure the following parameters of a CT based on voltage comparison method. i) Magnetizing characteristics ii) C.T. Ratio. iii) Polarity. ia ro le FI 230 Volts, 50 Hz, Single phase AC. OUTPUT: 4) For ratio, polarity measurement 0-100volts. ii) For magnetizing characteristic continuously variable in 3 range. a) 0 to 40V AC at 6A max. b) Oto 150V AC 4A max. ©) 0 to 500V AC at 1.2A max. Power supply transformer is isolation type electrostatic shielding, DUTY: Smins. ON, 15mins. OFF. METER: *) 3¥é digital voltmeter used for measuring primary and secondary voltage. ii) 3 ¥4 digital ammeter used for measuring excitation current. iii) Analog 4A meter used for polarity of C.1. and P-T. under test. SPECIFICATIONS: SPECIFICATIONS: For C.T.: (Servo Mechanics) Ratio : 10/1 Line + 0.66 VA :5 LV :25KV Class : 1 Type :R Cyes/see : 50For P.T.: (Servo Mechanics) Rating 500 VA Primary: 250V Phase :1 Secondary : 25V Cyes/sec : 50 C.T. and P.T. Ratio Polarity And Magnetizing Test Set: Input Voltage 2 220V, SOHz 1-0, AC Output Voltage for polarity and ratio: 0-10V Output Voltage for magnetizing current : 0-40V, 150V Connection Diagram: aT id ul i} | To Secondary To Primary ofCT TorP, —_ won Turn Yack CAT Red LT=Low Tum vt Fig | v2 a mt i 40V 150500" Ye] = eter) Fig.?PROCEDURE: PROCEDURE: 1) Connect the units earthed properly. 2) Connect the C.T. and P.T. under test which as shown in Fig.1 or Fig.2, Fig. 1 for polarity and ratio measurement and Fig.2 for ratio measurement. 3) Connect the main power supply cord to the nearest power supply (230V AC). 4) Make the test set ‘ON’ switch, which is indicated by glowing «Mains On’ indicating lamp. 5) Bring back the polarity and ratio measurement variac to zero position (connection diagram Fig.1). The output voltage cannot be energised unless the variac is first returned to zero position. It is called zero interlocking. 6) Keep the polarity ‘and ratio measurement switch first at zero position. 7) Make the polarity meter zero by "zero adj. pot." 8) Slightly increase the output voltage as shown in the voltmeter-V1 ‘& V2.Then press the "Press to see polarity push switch" to see the polarity of the P.T. and C.T. under test. If it is shows reverse then Interchange the primary and secondary terminals connection. Then it will show correct by pressing the polarity push switch. The Blacks or Red terminal leads of CT. and P.T. will start. 9) After showing the polarity, keep the polarity ratio switch at zero position, The n increase the output voltage. It will be shown by V1 and V2 voltmeter. (Refer results). 10) After obtaining the ratio of C.T. and P.T. make the C.T. and PT. connection as shown in the fig. 2. 11) After making the variac zero position, press the start green switch to energize the output voltage circuit. ‘ON’. It is indicated by Red lamp. 12) After making output circuit ‘ON’ slowly increase the output voltage, which is shown by set K.V. meter ‘and corresponding no Joad current shown by the set Ammeter Meter. 13) Take the different readings ‘and plot the magnetizing characteristics taking voltage in y-axis and no load current in x- axis.RESULTS: | Polarity Test: ' Terminal Connection of Meter Consideration | C.T. to testset | Deflection Remark Pi-Black, - P2-Red Primary S1-Black PA, P2 $2-Red_ Sal Secondary Pi-Red “| 3 S1, S2 ‘2-Black + r i Following table gives the idea for ob’ C.T. Ratio: taining the ratio“of C.T and P.T. Current Ratio condary Voltage | Primary Voltage Vi(Volts) v2(Volts)___ Vi/V2 Magnetization Characteristics of C.T.: SI. No Secondary Voltage V3 (Volts) Z Im (Amps) Excitation Current | |FICS OF P.T:- 3 SINo. | Primary | Astmcter | Wettmeter | Seconda Mi lining Ratio: Voltage. | Reading. | Reading. } Voltage. | current. | cur WI | VoLT) | I(LT) | Wo(LT) | VACHT) [ih nate = eS : —}-——. 1 12, ee : is a 2 | is. r 2 ee 3 18 cs : : 4 | all iN 5, 23 211 1 E CONCLUSIONS: Answer the following questions: 1. State the function of the current transformer. Whet is ratio error? 2, What is the difference between CT used for protection purpose and measurement purpose?
You might also like
Electrical Machine-1 Manual PDF
PDF
80% (5)
Electrical Machine-1 Manual PDF
40 pages
Test Procedure - CT & PT
PDF
67% (3)
Test Procedure - CT & PT
6 pages
Site Test Procedure and Report For Current Transformer: 1. Date of Erection 2. Equipment Details
PDF
No ratings yet
Site Test Procedure and Report For Current Transformer: 1. Date of Erection 2. Equipment Details
7 pages
CT Guide
PDF
100% (6)
CT Guide
20 pages
CT Testing
PDF
No ratings yet
CT Testing
19 pages
Current Transformer
PDF
100% (3)
Current Transformer
9 pages
Transformer Lab Manual
PDF
100% (1)
Transformer Lab Manual
68 pages
Exp 06 & 07
PDF
No ratings yet
Exp 06 & 07
8 pages
Department of Electrical Engineering: Techno International New Town
PDF
No ratings yet
Department of Electrical Engineering: Techno International New Town
5 pages
PS - 2 Lab
PDF
No ratings yet
PS - 2 Lab
4 pages
Lab 02 Transformer Polarity
PDF
No ratings yet
Lab 02 Transformer Polarity
3 pages
CT PT
PDF
No ratings yet
CT PT
3 pages
Testing Procedure
PDF
67% (3)
Testing Procedure
14 pages
05.current Transformer
PDF
100% (1)
05.current Transformer
32 pages
Instrument Transfromers
PDF
0% (1)
Instrument Transfromers
27 pages
Lab 1
PDF
No ratings yet
Lab 1
4 pages
Suggestion 02 (Final)
PDF
No ratings yet
Suggestion 02 (Final)
19 pages
Power System Lab-II
PDF
No ratings yet
Power System Lab-II
14 pages
Polarity Test On A Transformer 1 Aim: M T1T2 T 1C1 T 2C2
PDF
No ratings yet
Polarity Test On A Transformer 1 Aim: M T1T2 T 1C1 T 2C2
3 pages
Polarity Test of Transformer
PDF
No ratings yet
Polarity Test of Transformer
4 pages
2002 CT Saturation and Polarity Test
PDF
100% (1)
2002 CT Saturation and Polarity Test
11 pages
Power Systems 2 CT PT All
PDF
No ratings yet
Power Systems 2 CT PT All
6 pages
Transformer Test Procedures
PDF
100% (27)
Transformer Test Procedures
28 pages
Machine Lab Manuals Final Modified On 12-2-2019
PDF
No ratings yet
Machine Lab Manuals Final Modified On 12-2-2019
66 pages
EXP-3 To Perform Polarity Test On Single Phase Transformer and Polarity
PDF
No ratings yet
EXP-3 To Perform Polarity Test On Single Phase Transformer and Polarity
6 pages
1 X 1000 Kva Transformator Measurement Analysis Using Vector Group Dyn-11 and Off Load Tap Changer
PDF
No ratings yet
1 X 1000 Kva Transformator Measurement Analysis Using Vector Group Dyn-11 and Off Load Tap Changer
5 pages
Basic Electrical Laboratory Manual: Department of Electrical Engineering
PDF
No ratings yet
Basic Electrical Laboratory Manual: Department of Electrical Engineering
42 pages
Experiment No: 1 19bee069 Date: 20/01/2022 Aim: To Determine Magnetization Characteristics of A Given Current Transformer
PDF
100% (1)
Experiment No: 1 19bee069 Date: 20/01/2022 Aim: To Determine Magnetization Characteristics of A Given Current Transformer
11 pages
DocScanner Oct 20, 2024 10-41 PM
PDF
No ratings yet
DocScanner Oct 20, 2024 10-41 PM
18 pages
Omicron CPC 100 Scheme
PDF
No ratings yet
Omicron CPC 100 Scheme
6 pages
Lab Manual
PDF
No ratings yet
Lab Manual
52 pages
Em Lab Manual
PDF
No ratings yet
Em Lab Manual
22 pages
Nbsbulletinv10n3p419 A2b PDF
PDF
No ratings yet
Nbsbulletinv10n3p419 A2b PDF
10 pages
Mi Ii Unit
PDF
No ratings yet
Mi Ii Unit
68 pages
Cycloaliphatic Epoxy Resin
PDF
No ratings yet
Cycloaliphatic Epoxy Resin
13 pages
Final Year BTP Presentation
PDF
No ratings yet
Final Year BTP Presentation
33 pages
Transformer Test Procedures PDF
PDF
No ratings yet
Transformer Test Procedures PDF
28 pages
1.testing of CT, PT and Insulator Strings
PDF
100% (2)
1.testing of CT, PT and Insulator Strings
8 pages
Potentiometers: Nstrument Ransformers AND
PDF
No ratings yet
Potentiometers: Nstrument Ransformers AND
26 pages
BTEEL306 EM-I Lab Manual
PDF
No ratings yet
BTEEL306 EM-I Lab Manual
20 pages
Single Ehase Hrans Foxmer 0-1n y - Single Phase AC. Nolthmetes
PDF
No ratings yet
Single Ehase Hrans Foxmer 0-1n y - Single Phase AC. Nolthmetes
3 pages
Testing CT
PDF
No ratings yet
Testing CT
65 pages
Nbsbulletinv10n3p419 A2b
PDF
No ratings yet
Nbsbulletinv10n3p419 A2b
10 pages
Currnt Transformer Testing Procedure
PDF
No ratings yet
Currnt Transformer Testing Procedure
3 pages
Machine Lab Manuals Final Modified On 12-2-2019
PDF
No ratings yet
Machine Lab Manuals Final Modified On 12-2-2019
67 pages
Experiment No. 03 Polarity and Ratio Tests of Single Phase Transformer
PDF
No ratings yet
Experiment No. 03 Polarity and Ratio Tests of Single Phase Transformer
6 pages
CT - For Switchayrd
PDF
No ratings yet
CT - For Switchayrd
12 pages
6 Electrical Tests For CT
PDF
No ratings yet
6 Electrical Tests For CT
13 pages
Hongqing Echnology and Usiness Niversity: C T B U
PDF
No ratings yet
Hongqing Echnology and Usiness Niversity: C T B U
7 pages
SGP Practical Roll No 50
PDF
No ratings yet
SGP Practical Roll No 50
14 pages
EEE270 Sessional Lab Sheet
PDF
No ratings yet
EEE270 Sessional Lab Sheet
16 pages
Testing and Protection of Current Transformer Practical Experiences in Using The CPC 100
PDF
No ratings yet
Testing and Protection of Current Transformer Practical Experiences in Using The CPC 100
6 pages
Current Transformer Sop
PDF
No ratings yet
Current Transformer Sop
9 pages
Testing of CTs
PDF
No ratings yet
Testing of CTs
8 pages
Current Transformer Testing
PDF
100% (1)
Current Transformer Testing
4 pages
Current Transformer Testing 18.03.14
PDF
50% (2)
Current Transformer Testing 18.03.14
4 pages
Cter-83 Ug
PDF
No ratings yet
Cter-83 Ug
17 pages
Module 1 - Lecture 7
PDF
No ratings yet
Module 1 - Lecture 7
24 pages
Module 1 - Lecture 5
PDF
No ratings yet
Module 1 - Lecture 5
26 pages
Pe Ee 681 - Exp 3
PDF
No ratings yet
Pe Ee 681 - Exp 3
2 pages
Exp 1 - PC Ee 681
PDF
No ratings yet
Exp 1 - PC Ee 681
1 page