RS Group - 6 PCS
RS Group - 6 PCS
RS Group - 6 PCS
Gubat, Sorsogon
A.Y. 2023 - 2024
A copy of the instructional Hard copy or soft copy of Hard and soft copies of
materials used by the the instructional materials the instructional materials
Handouts
group is not provided to used by the group is used by the group are
the audience. provided to the audience. provided to the audience.
Collaborative presentation
Collaborative presentation
is completed more than 1 Collaborative presentation
is completed not more
hour after the deadline is completed on time
Timeliness than 1 hour after the
and/or is somewhat and/or meets the required
deadline and meets the
lacking (or exceeds) the length.
required length.
required length.
Total
Rated by:
SIGNATURE OVER NAME OVER GROUP NUMBER
_______________________________________________