0% found this document useful (0 votes)
42 views1 page

OP10 - Horizontal Head - 800 - With Thread Master H87 Drawingno All Characteristics May 13, 2014 12:23:40 PM Vda - Auditno 12:05:55 PM May 13, 2014

The document appears to be a manufacturing plan listing a programme name, plan name, date, temperature, workpiece details, drawing number, incremental part number, audit number, time, operator, and revision date.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views1 page

OP10 - Horizontal Head - 800 - With Thread Master H87 Drawingno All Characteristics May 13, 2014 12:23:40 PM Vda - Auditno 12:05:55 PM May 13, 2014

The document appears to be a manufacturing plan listing a programme name, plan name, date, temperature, workpiece details, drawing number, incremental part number, audit number, time, operator, and revision date.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Programme Plan Name Date Temperature workpiece Drawing No.

All Characteristics OP10_Horizontal Head_800_with Thread


May 13, 2014 * drawingno *
Incremental Part Number Audit-No.: Time Operator Revision Date
H87 * vda_auditno * 12:05:55 pm Master May 13, 2014 12:23:40 pm

You might also like