The document outlines the folder structure and file contents for the technical proposal of an energy project. It details the sections for administrative, technical, economic, and annex documents. The technical section in particular contains many subfolders and files related to quality management, health and safety, project execution, and more.

Uploaded by

lagos.ioan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views3 pages

Files

The document outlines the folder structure and file contents for the technical proposal of an energy project. It details the sections for administrative, technical, economic, and annex documents. The technical section in particular contains many subfolders and files related to quality management, health and safety, project execution, and more.

Uploaded by

lagos.ioan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Folder PATH listing for volume DATA

Volume serial number is 0419-3B7C


D:.
│ FILES.TXT

├───01. Offer Presentation Letter
├───02. ADMINISTRATIVE SECTION
│ ├───01. Complete Commercial Exceptation (Article 18)
│ ├───02. Tender's declaration of completeness
│ └───03. Name of persons who signs the tender
├───03. TECHNICAL SECTION
│ ├───1.2 Project Organization Chart
│ │
│ ├───1.3 CV of key personnel
│ │ └───CVs
│ │
│ ├───1.4 Qualified by REE HV works
│ │ │ Qualified by REE for "High Voltage Works".pdf
│ │ │
│ │ └───Support Files
│ │ 31. ?de?a ?s??se?? epa????µat??.pdf
│ │ Qualification REE.docx
│ │ Qualification REE.pdf
│ │
│ ├───1.5 Project Execution Plan
│ │
│ ├───1.6 Project Schedule (incl 2.1 - 2.4)
│ ├───3.1 Technical Formsheets
│ ├───3.10 Security Systems
│ ├───3.2 Deviation-Exceptions
│ ├───3.3 Technical Proposal Report
│ ├───3.4 Bill of key Quantities
│ ├───3.5 PV Syst
│ ├───3.6 Plot Plan
│ ├───3.7 General One Line Diagramm (SLD)
│ ├───3.8 Vendor Datasheet of Main Components
│ ├───3.9 Grid Code Compliance Assessment
│ ├───4.2 Draft HSE Plan
│ ├───4.3 HSE Performancve of thr last three years
│ │ HSE Performance of last three years.docx
│ │ HSE Performance of last three years.pdf
│ │
│ ├───4.4 Declaration of the absence of legal proccedings
│ │ ??S?????????? ????S????S F???GG??????S kIEFER TEK ???.pdf
│ │
│ ├───5.10 Tasks responsibilities
│ ├───5.11 CVs (same as 1.3)
│ │ └───CVs
│ │
│ ├───5.12 Job Minimum Competency Profile
│ ├───5.13 List of Activities
│ ├───5.14 List of Sub-Contractors used for the delivery
│ ├───5.15. Sub Contractor Managment Procedure
│ ├───5.16 Preliminary monitoring activities
│ │ │ Preliminary monitoring activities program for the project.pdf
│ │ │
│ │ └───Support Files
│ │ 08.21.616_Quality Monitoring Inspection_IR58-24_CH.pdf
│ │ 5.16.docx
│ │ 5.16.pdf
│ │ CCS.pdf
│ │ Mechanical Quality Report.pdf
│ │ ???-KIE-EGP.pdf
│ │
│ ├───5.17 Typical Check List for Monitoring Activities
│ │ │ Typical check lists for monitoring activities.pdf
│ │ │
│ │ └───Support Files
│ │
│ ├───5.18 Procedure for handling non-conformities
│ │ │ Procedure for handling non-conformities.pdf
│ │ │
│ │ └───Support Files
│ │ 5.18.docx
│ │ 5.18.pdf
│ │ NCR-001-Open Eye.pdf
│ │ RFI-Installed PV Module.pdf
│ │ RFI-PV Modules.pdf
│ │ RFI-STS.pdf
│ │
│ ├───5.19 Audit Managment procedure
│ │ Punch List .pdf
│ │
│ ├───5.2 Quality Objectives
│ ├───5.20 Statement signed by Top Management
│ │ 5.20 Statement signed by Top Management.docx
│ │
│ ├───5.21 Certificates issued by third parties
│ ├───5.3 KPIs relevant to the defined Objectivies
│ ├───5.4 Operational Risk Register along with mitigation plan
│ ├───5.5 Procedure for Risk Managment
│ │
│ ├───5.6 Procedure for document managment
│ │ 20189E03 Document numbering.pdf
│ │ 20198E09 Item numbering.pdf
│ │ kIEFER-Procedure for document managment.docx
│ │
│ ├───5.7 List of Tenders own Quality Managment System
│ ├───5.8 List of Document to be issued ad hoc according to project specific
requirements
│ ├───5.9. Organization Chart
│ │
│ ├───6.2 Detailed O&M activities organization
│ ├───7.1 Human rigths
│ │ ???-Tender 7.1-7.6.docx
│ │ ???-Tender 7.1-7.6.pdf
│ │
│ ├───7.2 Skills for the future
│ ├───7.3 Climate Change
│ ├───7.7 Biodiversity
│ ├───7.8 Ethical behavior
│ └───7.9 Value chain management
├───04. ECONOMIC SECTION
└───Relevant Annexs
├───ANNEX E (1.4 Health and Safety)
│ 645000BFPU00004_CDFE00_20 - ANNEX E2 HSE REQUIREMENTS.pdf

└───ANNEX F (1.5 Quality Management)