Naukri VIKASKUMAR (19y 0m)
Naukri VIKASKUMAR (19y 0m)
Naukri VIKASKUMAR (19y 0m)
VIKAS KUMAR
Career Objective:
To be associated with a company like yours, which is one of the leading brands of the
country and provides performance oriented quick-fire growth, splendid pay package
and a professional environment to accomplish progressive goals. Looking for a
challenging role in middle level of career where I can utilize my skills learnt throughout
the years in past in this industry.
Looking for a job that provides not only STABILITY & GROWTH but also freedom of
thought and actions.
Professional Qualification:
PGDM in Operation Management from All India Management Association, Lodi Road,
New Delhi in 2022
Working Experience :-
:
• Responsibilities Includes: -
•MEP (Electrical /HVAC /Plumbing/Fire Fighting /ELV ICT) design and site coordination,
Ensuring timely approvals of MAS /TDS /MIR as per plan & requirement of site
•Ensure work to the project team and monitor the progress to completion.
•Ensure the works comply with the contract documents including drawings and
specifications.
•Ensure that the works are completed on time, notifying the client of any delays and
valuing the costs associated with the delays, with QS coordination.
•Through knowledge of MEP installation and has demonstrated project management
skills with the ability to work as the head of a team of engineers and tradesmen.
•Ensure the timely submittal of all project submittals and obtaining approvals. (Samples,
Shop Drawings, Design Details, Work Procedure, Method Statements, Schedules,
Programs etc.)
•Detailed engineering and construction process knowledge in air conditioning,
electrical, firefighting, Low voltage systems and plumbing services
•Maintain good relationships with the client and develop a professional team to
establish the company as the contractor of choice.
•Liaison with Technical Services and Shared services personnel for delivery of design,
costs, schedules and overall project support.
•Establishes regular meeting to review package status, formulate action items and
follows up on close out.
•Works proactively, constructively and fairly with all parties to ensure the successful
execution of the project,
•Performs other responsibilities associated with this position as may be appropriate
•To act as the project team leader controlling all aspects of the MEP works including
planning, administration, commercial, engineering, documentation and handover to the
client
•Takes an active, personal role in the establishment, implementation and management
of project Safety Management Systems and Procedures
•Arrange Timely obtaining of clearances, approvals and permissions
•Monitor expenditure against the project budget.
•Follow up MEP material schedule and procurement.
•Instigate the project planning and review of progress against targets.
•Notify the client / subcontractors of ant delay to the work.
•Involved in Testing and commissioning of MEP systems.
•Knowledge of the overall construction processes and operating practices in the GCC &
India
Company Name: -MINT PROJECTS INTERNATIONAL LLC Oman since April 2017 to
APRIL 2019 as Sr. Engineer- MEP for various projects
• Project handled names: -
•MAJLIS & SWIMMING POOL, Al hound (Consultant: Corduff Oman),
•KAK Villa, AL Khoud (Consultant: AWS),
MACKI Villa Qurum (Consultant: STI/H+S) 1B+2F –14 Villa,
Zubair Villa, Qurum (Consultant: CPEC)-Residential Villa,
Al Shawa School Extension, Al Shati Qurum& Twin Villa, Al Khoud (Consultant: Coorduff
Oman) etc.
• Responsibilities Includes: -
•Overall MEP activities includes tender enquiries, design drawing submission and
approval.
•MAS approval, quantification of materials & procurement of materials finalization,
dealing with suppliers and reviewing of comparison sheet and finalization of suppliers.
•Preparation /review of procurement & subcontract schedule and overall monitoring of
executions works.
•Client /Consultant meeting, RFI for techno commercial clarifications and QS billing
review of MEP part for the projects.
•T& C of MEP systems and handing over of the projects.
•Overall leading a small team of MEP construction includes draftsman, junior engineers,
supervisor, and foreman, procurement deptt. and tradesman.
Company Name: -BAHWAN ENGINEERING COMPANY LLC, Oman (BEC), since April
2012 to April 2017. MEP project value 200 million OMR
Responsibilities Includes: -
• Involved Design and Execution for electrical system which includes preparation of
electrical design document and drawing for Traffic Concourse building and External,
PTB & North Piers works which includes SLD, Small power layout, Power cable tray &
truncking layout etc.
• Preparation of Load Schedule, cable schedule, DB schedule, and Responsible for RCP
coordination.
• Responsible for quantification of materials and ordering for all electrical related items
and equipment for concern building which includes cables, wires, switchboards, light
fittings, cable tray & trunking, GI /PVC conduits and other miscellaneous site related
materials.
•. Extensively involved in execution of electrical system at site and solving installation
problems with electrical systems, travel to the site to resolve issues.
•. Coordination and construction responsibility for power energization NP and External
area MEP services coordination and execution of services.
• Ensure appropriate checking & review of all documents / drawings before release at
any Revision status.
•Installation, inspection, Termination, Energization of more than 150 LV /MCC
panels/DBs/DRs etc.
Company Name: -ETA ENGINEETRING PVT LTD, (DMRC DIVISON), NEW DELHI since
March 2010 to April 2012.
• Involved in Testing and Commissioning of equipment and handing hover to client and
preparation of Billing and to clients cross checking activities.
Project Name: - Annual Maintenance of MEP Equipment’s between New Delhi to Dwarka
sec-21 route (Reliance Metro Airport Express line).
Company Name: -STERLING & WILSON LTD, NOIDA, NEW DELHI FOR OPTUS SAROVAR
& CITY MART HOTEL PROJECTS IN GURGAON, since April 2008 to March 2010.
• Project Name: - OPTUS SAROVAR PREMIUM HOTEL, Worked as Site Engineer cum Site
in -charge for Sterling and Wilson Pvt Ltd, Consultant: Sunil Nayar Consultant Pvt Ltd
for the project (80 Guest Rooms and One Banquet Hall and Two Kitchens) SEC-29,
Gurgaon since April 2008 to March 2010.
• Design review and construction of layout drawing for Electrical System & ELV systems,
Approval of MAS, Quantification and ordering of materials, approval of installation,
billing certifications from client/consultant, Client /consultant meetings etc. Installation
of 120kVA UPS and 1000kVA Transformer & liaison with HUDA for load approval etc.
and Testing & Commissioning and Handover of the project.
• Was also involved partly in construction activities for the project City Mart Hotel
(Presently Radisson and Mall (136 Guest Rooms and Two Banquet Halls and Two
Kitchens) at Sohna Road, Gurgaon.
• Company Name: -MANU ELECTRICALS PVT LTD, New Delhi FOR UMKAL HOSPITAL
PROJECTS IN GURGAON.
• Project Name: - Umkal Health Care Pvt Ltd, (Gurgaon), a Multi-Specialty Hospital,
worked as Site Engineer for Manu Electricals Pvt. Ltd., New Delhi for the project for
Internal Electrification & External Electrical work from May 2007 to April 2008 .
Responsibility includes planning & execution of site related activities, client meeting of
progress review and billing etc.
Company Name: -SUPER ELECTRICALS ENGINEERS PVT LTD, New Delhi FOR
MOOLCHAND HOSPITAL RENOVATION & DMRC COMMERCIAL COMPLEX PROJECTS IN
CANNUGHT PLACE NEW DELHI
• Project Name: - Moolchand Med City, New Delhi, Multispecialty Hospital, Worked as
Site In-charge, Super Electricals Engineers Pvt Ltd, Delhi for the project Moolchand Med
City, New Delhi a 300 -Bedded Multi specialty Hospital since May 2005 to April 2007.
Responsibility includes planning of execution activities, monitoring of site activities,
materials ordering, billing and follow-ups with client.
•Project Name: Shopping Complex of DMRC at CP, New Delhi Worked as Trainee cum
Site In-charge, SV and Associates, Noida, Responsibility includes execution and site
monitoring activities, material ordering, DPR preparation, billing etc. for the project
since March 2003 to March 2005.
About Myself
Passport No : K1771359
Driving License : Oman and India Driving License for LV vehicle
Family Status : Yes
Place: Muscat.
Date: (Vikas Kumar)