The pile cap is designed to support loads from three piles with a total ultimate load of 6720 kN. Reinforcement is designed for bending in two directions with main bars of 25 mm diameter. Shear resistance is also checked to be satisfactory.

Uploaded by

mrprabhu16
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
112 views7 pages

Pile Cap Design

The pile cap is designed to support loads from three piles with a total ultimate load of 6720 kN. Reinforcement is designed for bending in two directions with main bars of 25 mm diameter. Shear resistance is also checked to be satisfactory.

Uploaded by

mrprabhu16
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 7

Design of Pile cap for Two piles:

2150

900

The pile cap is designed as bending theory and are accordance with BS8110
DATA:
Pile load capacity for 500 dia. = 1000 kN
Nos. of pile = 2 Nos
Total ultimate load on column - N = 1.6 x 2 x 1000
= 3200 kN
Column in X dir - Cx = 400 mm
Column in Y dir - Cy = 400 mm
Nominal pile diameter - D = 500 mm
Spacing of pile centres - A = 2.5 x 500
pile spacing does not exceeds 3xdia. = 1250 mm
Overhang from pile face to cap - ol = 200 mm
length of pile cap - lx = 2150 mm
Width of pile cap - ly = 900 mm
Concrete grade = 35 N/mm²
Steel strength = 420 N/mm²
Min. percentage of steel = 0.0013 (See Table 3.27)
Multiplier of min. bend radius MRF = 3 (See Table 3 of BS 4466)
Ultimate bond stress fbu = 2.958 N/mm² (see Cl. 3.12.8.4)
Cover to underside of main bars = 150 mm
Side and top cover to main bars = 75 mm
Max shear stress in concrete Vmax = 0.8 x 5.916
= 4.7329 N/mm²
Since 0.8sqrt(fcu) does not exceed 5 N/mm²
Depth of pile cap (Assumed) - h = 1200 mm
Main reinforcement bar = 25 mm
Effective depth (h -cover -20mm) d = 1030 mm

Design of main reinforcement:


Total moment - BM = N/2 x (A - Cx)/2 x 1000
3200 x 850 x 1000
2 2
= 7E+08 Nmm
Resistance moment factor - k = M/(ly x d^2 x fcu)
= 7E+08
900 x 1030 ² x 35
= 0.0203
Lever arm factor - z' = (0.5 + sqrt(0.25 - k / 0.9))
But must not exceed - z' = 0.95 = 0.9769
Lever arm z = z' d = 0.95 x 1030
= 978.5
Area of steel required = M/(z x fy)
= 1655 mm²
Area of steel provided = 490.87 x 4.028
= 1977 mm²
Actual stress in steel = 420 x 1655
1977
= 351.49 N/mm²
Distribution steel
Minimum % of steel required in top & bottom in each direction (Table 3.27)
= 0.0013 x 1000 x 1200
= 1560 mm²/ m
Provide horizontal bars 12 mm spaced vertically 250 mm c/c
should be provided in the side of cap
Check shear resistance:
Design concrete shear stress taken
from formula in Table 3.9
Effective depth of section - d = h - cover - dia/2
= 1037.5 mm
Reinforcement factor - c1 = 100 x Aprov / (ly d)
= 0.2117
Effective - depth factor - c2 = 400 / d
= 0.3855
Factor c2 not less than 1, so c2 = 1
Concrete grade factor c3 = fcu / 25
= 1.4
Design concrete shear stress vc = 0.79xc1^(1/3)*c2^0.25*c3^(1/3)/1.25
= 0.79 x 0.212 0.33x 0.385542 0.25 x 1.4 0.3
1.25
= 0.3334
Distance from col. To critical plane av = A/2 - 0.3 x pile dia - cx/2
= 275 mm
since the distance from the column face to the critical plane as defined in cl. 3.11.4.3
is less than twice the effective depth (cl.3.4.5.8)
shear enhancement factor - sef = 2 x d/av
= 7.5455
Modified concrete shear stress - vmod = vc x sef
= 2.5157 N/mm²
Total shear resistance provided Vprov = (Vmod x cp1 + vc x cp2) x d/1000
= 2349 kN
Total shear resistance required - N/2 = 1600 kN
Shear resistance is satisfactory

Check punching shear at column face Cl. 3.11.4.5


Length of column perimeter u0 = 2 x (cx + cy)
= 1600 mm
Punching shear resistance provided = Vmax x u0 x d/1000
= 7857 kN
Punching shear resistance required - N = 3200 kN
Punching shear stress on perimeter of column is satisfactory.
Design of Pile cap for Two piles:
Bx

Ay'

Ay

Ax

The pile cap is designed as bending theory and are accordance with BS8110
DATA:
Pile load capacity for 600 dia. = 1400 kN
Nos. of pile = 3 Nos
Total ultimate load on column - N = 1.6 x 3 x 1400
= 6720 kN
Column in X dir - Cx = 400 mm
Column in Y dir - Cy = 400 mm
Nominal pile diameter - D = 600 mm
Spacing of pile centres - A = 2.5 x 600 ( spacing not to exceed 3 x dia)
pile spacing centres in X - Dir : Ax = 1500 mm
Overhang from pile face to cap - ol = 200 mm
pile spacing centres in Y - Dir. : Ay = 1300 mm
= \ 1500 ² + 1300 ²
= 1985 mm ( spacing not to exceed 3 x dia)
Distance Ay' to centre of column Ay' = 867 mm
Load on each pile is assumed equal 1500
Load on each pile N1 = N2 = 2240 kN
Max. cap length in X - Dir. Lx = 2500 mm
Min. cap length at top Bx = 1000 mm
max. cap breadth in Y - Dir. Ly = 2300 mm
Min. cap breadth in y - Dir. By = 950 mm
Concrete grade = 35 N/mm²
Steel strength = 420 N/mm²
Min. percentage of steel = 0.0013 (See Table 3.27)
Multiplier of min. bend radius MRF = 3 (See Table 3 of BS 4466)
Ultimate bond stress fbu = 2.958 N/mm² (see Cl. 3.12.8.4)
Cover to underside of main bars = 150 mm
Side and top cover to main bars = 75 mm
Max shear stress in concrete Vmax = 0.8 x 5.916
= 4.7329 N/mm²
Since 0.8sqrt(fcu) does not exceed 5 N/mm²
Depth of pile cap (Assumed) - h = 1200 mm
Main reinforcement bar = 25 mm
Effective depth (h -cover -20mm) d = 1030 mm
Design of main reinforcement in X - Dir:
Total moment - BM = N/3 x (Ax - Cx)/2 x 1000
6720 x 1100 x 1000
3 2
= 1E+09 Nmm
Resistance moment factor - k = M/(lyb x dx^2 x fcu)
= 1E+09
2300 x 1030 ² x 35
= 0.0144
Lever arm factor - z' = (0.5 + sqrt(0.25 - k / 0.9))
But must not exceed - z' = 0.95 = 0.9837
Lever arm z = z' d = 0.95 x 1030
= 978.5
Area of steel required = M/(z x fy)
= 2998 mm²
Area of steel provided = 490.87 x 6.667
= 3272 mm²
Actual stress in steel = 420 x 2998
3272
= 384.74 N/mm²

Design of main reinforcement in Y - Dir:


Total moment - BM = N/3 x (Ay' - Cy/2) x 1000
6720 x 667 x 1000
3
= 1E+09 Nmm
Resistance moment factor - k = M/(lxb1 x dy^2 x fcu)
= 1E+09
2300 x 1030 ² x 35
= 0.0175
Lever arm factor - z' = (0.5 + sqrt(0.25 - k / 0.9))
But must not exceed - z' = 0.95 = 0.9802
Lever arm z = z' d = 0.95 x 1030
= 978.5
Area of steel required = M/(z x fy)
= 3635 mm²
Area of steel provided = 490.87 x 8
= 3927 mm²
Actual stress in steel = 420 x 3635
3927
= 388.82 N/mm²
Considering moment in direction of twin piles:
Total moment - BM = 2N x (Ay - Ay' - Cy/2) x 1000
4480 x 233 x 1000
= 1E+09 Nmm
Resistance moment factor - k = M/(lxb2 x dy^2 x fcu)
= 1E+09
2500 x 1030 ² x 35
= 0.0112
Lever arm factor - z' = (0.5 + sqrt(0.25 - k / 0.9))
But must not exceed - z' = 0.95 = 0.9873
Lever arm z = z' d = 0.95 x 1030
= 978.5
Area of steel required = M/(z x fy)
= 2540 mm²
Area of steel provided = 490.87 x 6.667
= 3272 mm²

Distribution steel
Minimum % of steel required in top & bottom in each direction (Table 3.27)
= 0.0013 x 1000 x 1200
= 1560 mm²/ m
Provide horizontal bars 12 mm spaced vertically 250 mm c/c
should be provided in the side of cap
Check shear resistance in X - Direction: (Cl. 3.11.4.4)
Design concrete shear stress taken from formula in Table 3.9

Effective depth of section - d = h - cover - dia/2


= 1037.5 mm
Reinforcement factor - c1 = 100 x Aprov / (ly d)
= 0.1371
Effective - depth factor - c2 = 400 / d
= 0.3855
Factor c2 not less than 1, so c2 = 1
Concrete grade factor c3 = fcu / 25
= 1.4
Design concrete shear stress vc = 0.79xc1^(1/3)*c2^0.25*c3^(1/3)/1.25
= 0.79 x 0.137 0.33x 0.385542 0.25 x 1.4 0.33
1.25
= 0.2889
Distance from col. To critical plane av = A/2 - 0.3 x pile dia - cx/2
= 370 mm
since the distance from the column face to the critical plane as defined in cl. 3.11.4.3
is less than twice the effective depth (cl.3.4.5.8)
shear enhancement factor - sef = 2 x d/av
= 5.6081
Modified concrete shear stress - vmod = vc x sef
= 1.6201 N/mm²
Total shear resistance provided Vprov = (Vmod x cp1 + vc x cp2) x d/1000
= 1681 kN
Total shear resistance required - N/3 = 2240 kN
Shear resistance in X direction is satisfactory
Check shear resistance in Y - Direction: (Cl. 3.11.4.4)
Design concrete shear stress taken from formula in Table 3.9

Effective depth of section - d = h - cover - dia/2


= 1037.5 mm
Reinforcement factor - c1 = 100 x Aprov / (ly d)
= 0.1262
Effective - depth factor - c2 = 400 / d
= 0.3855
Factor c2 not less than 1, so c2 = 1
Concrete grade factor c3 = fcu / 25
= 1.4
Design concrete shear stress vc = 0.79xc1^(1/3)*c2^0.25*c3^(1/3)/1.25
= 0.79 x 0.126 0.33x 0.385542 0.25 x 1.4 0.33
1.25
= 0.281
Distance from col. To critical plane av = Ay - Ay' - 0.3 x pile dia - cy/2
= 53 mm
since the distance from the column face to the critical plane as defined in cl. 3.11.4.3
is less than twice the effective depth (cl.3.4.5.8)
shear enhancement factor - sef = 2 x d/av
= 39.151
Modified concrete shear stress - vmod = vc x sef
= 11 N/mm²
Total shear resistance provided Vprov = (Vmod x cp1 + vc x cp2) x d/1000
= 28539 kN
Total shear resistance required - N/2 = 3360 kN
Shear resistance in Y direction is satisfactory
Check punching shear at column face Cl. 3.11.4.5
Length of column perimeter u0 = 2 x (cx + cy)
= 1600 mm
Punching shear resistance provided = Vmax x u0 x d/1000
= 7857 kN
Punching shear resistance required - N = 6720 kN
Punching shear stress on perimeter of column is satisfactory.
Since spacing of piles does not exceed 3 times pile diameter, it is unnecessary to check
punching shear along critical perimeter defined in cl. 3.11.4.5