GREEN BUILDING INDEX ASSESSMENT CRITERIA FOR TOWNSHIP
CONTENTS
Introduction
PAGE 3 What is the Green Building Index (GBI)?
PAGE 3 Who can use the Green Building Index?
PAGE 3 How to use the Green Building Index?
PAGE 4 What is a Sustainable Township?
PAGE 4 Sustainable Township Rating Tool
AssesSment Criteria
PAGE 6 Summary of Final Score
PAGE 7 Summary of Contents
The Green Building Index has been developed by Greenbuildingindex Sdn Bhd (in short “GSB”) for the purposes
as mentioned above and may be subject to further updating and/or modification in future.
The Green Building Index (GBI) is based upon the existing rating tools such as the Singapore Green Mark
and the Australian Green Star system, amongst others which have been extensively modified for the Malaysian
application. Grateful acknowledgment is made to the owners of copyright for these systems for use of their
documents, information and materials in the development of the GBI.
While every care has been taken by GSB in the development of the GBI to establish and acknowledge copyright
of the information and materials used, and contact the copyright owners known to GSB, GSB tenders its apologies
for any accidental copyright infringement.
The GBI is a copyright of GSB in which GSB reserves all rights. No part of the GBI may be used, modified,
reproduced, stored in a retrieval system or transmitted in any form, or by any means, electronic, mechanical,
photocopying, recording or otherwise, without the prior written permission of GSB.
Disclaimers
GSB shall not be held liable for any improper or incorrect use of the GBI (inclusive of the materials and/or
information contained therein) and assume no responsibility for any user’s use of it. In no event shall GSB be
liable for any damages whatsoever, whether direct, indirect, incidental, special, exemplary or consequential
(including, but not limited to business interruption or loss of use, data or profits) regardless of cause, and on any
basis of liability, whether in contract, strict liability or tort (including negligence, misrepresentation or otherwise)
arising in any way out of the use of the GBI or the information and materials contained therein.
The information and materials in the GBI are provided “as is” and without warranties of any kind expressed or
implied. GSB does not warrant or make representations as to the accuracy and completeness of any information
and/or materials contained therein. While every effort has been made to check the accuracy and completeness
of the information and materials given, the users should always make their own relevant checks. Accordingly,
GSB does not accept responsibility and liability for misstatements made in it or misunderstanding from it.
The GBI is no substitute for professional advice. Users are advised to consult with appropriate and accredited
professional advisors for advice concerning specific matters pertaining to the GBI before adopting or using it.
GSB disclaims any responsibility for positions taken by users in their individual cases or for any misunderstandings
and losses, direct or indirectly, on the part of the users.
GSB does not endorse or otherwise acknowledge the GBI rating achieved by the use of the GBI. GSB offers a
formal certification process for ratings; which service provides for independent third party review of points claimed
to ensure that all credits can be demonstrated to be achieved by the provision of the necessary documentary
evidence. Use of the GBI without formal certification by GSB does not entitle the user or any other party to
promote the achieved GBI rating. Notwithstanding the above, neither the GBI formalization nor any certification
issued by GSB shall be used for advertising or product/services endorsement purposes.
Indemnification
To the extent permitted by applicable law, by using the GBI, the user agrees to defend, indemnify, and hold
harmless, GSB, its officers, employees, members, representatives and agents from and against all claims and
expenses of whatsoever kind and amount, arising out of the user’s use of the GBI or materials and information
contained therein and not to pursue any cause of action whatsoever against GSB under any conceivable
circumstances.
INTRODUCTION
The Green Building Index is developed specifically for the Malaysian tropical weather, environmental and
developmental context, cultural and social needs.
The GBI initiative aims to assist the building industry in its march towards sustainable development. The GBI
environmental rating system is created to:
Use of the Green Building Index tool without formal certification by an independent accredited GBI Certifier
does not entitle the user or any other party to promote the Green Building Index rating achieved. No fee is
payable to GSB for such use, however formal recognition of the Green Building Index rating – and the right to
promote same – requires undertaking the formal certification process offered by GSB.
All Green Building Index rating tools are reviewed annually; please forward any feedback to [email protected].
INTRODUCTION
The Basis on the concept of sustainable development is the balanced approached to addressing the
environmental, social and economic issues.
• Consider Sustainable Townships that are balanced in their ongoing production and consumption of
energy and water
• Promote Protection of the Natural Environment
• Planned and designed for the benefit of the Community
• Optimising and lowering the impact on our Resources
• Recognise connectivity of the community within and externally
• Tailored to meet the contextual requirements and incorporating innovative solutions for now and
the future
Six core categories have been developed to address the delivery of a more sustainable township. The categories
are Climate, Energy & Water, Ecology & Environment, Community Planning & Design, Transportation &
Connectivity, Building & Resources and Business & Innovation.
The GBI Township Assessment process follows through four key stages. Stage 1 Application & Registration, Stage
2 Planning Assessment (PA), Stage 3 Final Planning Assessment (FPA) and Stage 4 Completion & Verification
Assessment.
PROJECT INFORMATION
PROJECT NAME
PROJECT ADDRESS
POSTCODE
STATE
APPLICANT
CONTACT PERSON
TOWN PLANNER
ARCHITECT
LANDSCAPE ARCHITECTS
CIVIL ENGINEER
STRUCTURAL ENGINEER
MECHANICAL ENGINEER
ELECTRICAL ENGINEER
EIA CONSULTANT
BIODIVERSITY CONSULTANT
TRANSPORT PLANNER
QUANTITY SURVEYOR
LAND SURVEYOR
LOCAL AUTHORITY
PROJECT DESCRIPTION
76 to 85 points Gold
66 to 75 points Silver
50 to 65 points Certified
A maximum of Four (4) points are awarded for compliance to the following criteria:
A) Basic Compliance
One (1) point for compliance to basic criteria.
1
Provision of Open spaces including greenspaces shall be 15% of the total development area or
50% more than the local authority’s requirements whichever greater.
B) Advanced Compliance
Maximum of three (3) points for advanced compliance.
In addition to the basic compliance in (A) above, one point will be awarded for compliance to
ANY TWO of the following criteria up to a maximum of three points:
1. 50% of all public spaces (hardscape plaza’s) and footpaths on the development are shaded.
2. Provision of shaded green space or and tree cover to at least 20% of development foot print.
3. At least 10% of public spaces to be provided with open water/or water features 3
4. At least 50% of hardscape in public spaces and road within the development to use Solar
Reflectance Index (SRI) value of 29 and above for the final surface finishes to mitigate heat
absorption.
5. Demonstrate provision of cross ventilation air-flow throughout development to mitigate
stagnant / hotspots (use of computer simulation with building and landscape modelling)
6. Any other measure which can be proven to promote, reduce or minimise heat island effect or
lower ambient temperature
DESCRIPTION
Open space describes land that is enclosed or open that is specified or reserved to be wholly or in part as a public botanical
park, public park, public sports and recreation field, pedestrian walkway, dedicated cycleway or as a public plaza. The open
space is a combination of hardscape and softcape. Greenspace is defined as open space that is having predominantly softscape
landscaping in nature. The softscape can be defined as Greenspace and is referenced under CPD1. Tree preservation Order
(TPO), Green Space Index and any other local statutory requirements should be referenced.
The creation and erection of hard surfaces or structures within the built-environment promote the formation of ‘heat islands’
as these hardscapes create thermal mass that absorbs heat during the day and releases during the night to the surrounding
areas. Mitigating ‘heat island’ effect at its basic level includes shading of public spaces, the provision of tree covers and
shaded green, water bodies and features and use of materials of high SRI (Solar Reflective Index).
1. Site Plan of the total development Area or Layout Plan indicating all Open Spaces both hardscape
& softscape with the percentage breakdown of all components to the total area. (All drawings
recommended scale 1:500 or 1:1000)
2. Summary Report on Strategies to ensure compliance with intent on all Open space strategies
employed to reduce Heat Island.
3. All drawings calculations and reports to be endorsed by the planner or architect responsible.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Summary Report describing compliance to measures (both Basic and Advanced) listed in the reports
and highlight all criteria compliance.
2. As-Built drawings (colour coded) showing Open Spaces, pedestrian footpaths, shaded green spaces
and free cover, open water features natural and man-made, buildings incorporating green roof if
accessible to public.
3. For compliance to SRI values, submit materials listing within the summary report describing
permeability and Solar Reflectance Index of materials used site-wide.
4. Describe any deviation or addition to the FPA submission.
A maximum of Two (2) points are awarded for compliance to the following criteria:
A) One (1) point is awarded for compliance with the “lumen-caps per acre” listed in Table CEW2-1. 1
B) Additional one (1) point is awarded for implementing energy saving lamps in over 90% of the
development. Energy saving lamps (whether LED, discharge lamps, induction lamps, electronic
simulated discharge lamps or whatever cutting edge technology) shall only qualify if lamps
comply with the following criteria:
1
1. Lamp efficiencies is 120 lumens/W or better;
2. Certified low or zero mercury (< 3mg /100W)
3. Lamp life is 15,000 hours or more.
DESCRIPTION
Sustainable Lighting Design
Sustainable lighting starts with the application of best practice in design of Luminance or Illuminance level and the selection
of light fittings in the right context and for the relevant task application. Lighting for external application generally specify
illuminance (candela/m²) rather than luminance (lumen/m² or lux). Issues to consider include:
1. Colour rendering index (CRI) or colour temperature depending on the task application (pedestrian or vehicular) and
development area classification etc.
2. Uniformity and luminance and/or illuminance level (depending on whether application is vehicular or pedestrian or mixed
traffic.
3. In facade and landscape lighting, the ‘creative aspect’ of lighting design is an important factor creating moods, or
enhancing themes or features. In such application, “technical lighting” which is principally about uniformity, lighting level
and colour may be over shadowed by ‘creative’ issues such as shadows, focus, ‘surface washing’, ‘highlighting’ etc. The
use of ‘colour’ and ‘colour rendering’ will also be an important aspect of ‘creative lighting’.
4. Generally, the ‘technical aspect’ of lighting are covered under the following Malaysian Standards:
i. MS 825 : Part 1 Code of Practice for the Design of Road Lighting; Part 1 Lighting of Roads and Public Amenity Areas.
ii. MS 825 : Part 2 Code of Practice for the Design of Road Lighting; Part 2 Lighting of Tunnels.
1. Layout Plan clearly indicating lighting zones and street lighting layout (Recommended 1:500 scale
or 1:1000)
2. Summary Report on the lumens per acre calculation prepared by a professional engineer on the
lighting strategies to be employed for the development.
3. Confirmation from Developer to comply with the proposed criteria.
1. Final approved Masterplan layout indicating lighting zones and street lighting layout
2. Describe any deviation or addition to PA submission.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Summary report confirming compliance to the original design intent. All reports, plans and sections
to be endorsed by professional engineer.
2. Luminance or Illuminance measurements to be carried out on site to confirm compliance to design
intent.
3. Describe any deviation or addition to the FPA submission.
On site energy generation (micro-generation or distributed generation) is the generation of energy via community run
generation (e.g. district cooling plant, co-generation plant) OR in-building micro-generators such as BIPV, building solar-air
conditioning etc). The intent of ‘on-site’ generation is to take advantage of reduction in transmission losses which therefore
requires that on-site generation should be efficient, e.g. an inefficient district cooling plant may ‘on-the-balance’ be more
“CO2 emissive” compared to direct grid-electrically run in-building chillers.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
The reduction of carbon emission by renewable energy generation can be implemented by ‘in-building’ or township-based
effort.
Renewable Energy includes wind, solar thermal, solar PV, biomass etc.
Community run on-site generation or district energy plant (e.g. district cooling) can be eligible for RE point provided the
amount of RE used in their generation can be ascertained and certified. The percentage of RE used in such township run
energy plant will be used in ascertaining compliance. Energy calculated can be in kWh or BTUh or KJoule equivalent.
A maximum of four (4) points are awarded based on the target achieved:
1. For community / district energy plant (e.g. DCS), a brief report on its commercial sustainability OR
a letter from the District plant operator confirming supply of energy for the project and relevant
information e.g. % of RE used in generation.
2. Report showing total demand and demand fulfilled by RE.
3. For ‘within-building’ submit the following statement of compliance:
i. Site Plan with buildings and zones identified for in-building RE System(s).
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. As-Built plans and photographs marking out installation location of Renewable Energy System(s).
2. As measured kWP or equivalent energy generated.
3. Describe any deviation or addition to the FPA submission.
Submit calculation demonstrating reduction in water consumption compared to the development base requirement for
landscape irrigation of greenspaces.
Water reduction for irrigation must be reduced by at least 20%.
i. Use recycled water from stormwater retention for irrigation, parkland or other non-building use (including public facilities),
OR
ii. If (i) above is NOT supported by the local authority, install landscape that does not require permanent irrigation system.
Temporary irrigation for plant establishment will be allowed if removed within one (1) year from installation.
Watering
TPWA
Landscape Type Qty Units Requirement IE Remarks
(L)
(L/unit/day)
Watering requirement during early
Trees 200 Nos 24 Drip 0.9 5,333
establishment stage
Watering requirement during early
Palms 150 Nos 7.1 Drip 0.9 1,183
establishment stage
Shrubs 3,000 m2 6.3 Drip 0.9 21,000
Ground Cover & Lawn 12,000 m2 3.1 Sprinkler 0.625 59,520
87,036
Watering
TPWA
Landscape Type Qty Units Requirement IE Remarks
(L)
(L/unit/day)
Assumed that no watering required upon
Trees 200 Nos 0 Drip 0.9 0
reaching established stage after 3 years
Assumed that no watering required upon
Palms 150 Nos 0 Drip 0.9 0
reaching established stage after 3 years
Shrubs 3,000 m2 6.3 Drip 0.9 21,000
Watering demand may be reduced if
Ground Cover & Lawn 12,000 m2 3.1 Sprinkler 0.625 59,520 browning during period of drought is
acceptable
80,520
Eto = Evapotranspiration rate, IE = Irrigation Efficiency, TPWA = Total Plant Water Applied
1. A calculation of the Base water consumption for irrigation to Greenspaces for development and / or
each phase of development.
2. A technical report describing the retention or collection of rainwater storage capacity facility and
distribution site wide. Location of retention or water collection should be indicated on the Landscape
plan.
3. Confirmation by developer on the percentage of water harvesting or retention for irrigation
purposes.
1. Approved Masterplan with updated location of rainwater harvesting storage for site wide.
2. Summary Report on Base Water consumption and water harvesting strategies to comply for this
criteria.
3. Describe any deviation or addition to the PA submission.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Final Report on Base water consumption and water provision for irrigation for development and / or
each phase of development.
2. Final as installed calculation of rainwater harvested, storage tank capacity and distribution system.
3. Furnish photographs of as installed system.
4. Describe any deviation or addition to the FPA Submission.
Encourage recycling of greywater and/or blackwater for entire township, thereby reducing the loading on the sewage
treatment system.
Points are awarded for percentage greywater and/or blackwater recycled:
DESCRIPTION
Recycled waste water can be used for irrigation and street cleaning. Infrastructure and sustainable design to ‘whole site’
approach to recycling of grey water and / or black water is encouraged. Use of bio systems e.g. membrane biorector (MBR)
technology to treat black water or any other systems is encouraged.
1. A technical report describing the concept to waste water, recycling ‘whole site’ approach. Includes
estimated calculations from parcels for site wide and facility provision to cater to the targeted
volume.
2. Technical report shall include schematics showing outline strategy on plan for grey water and or black
water recycling.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Final as-installed calculation of grey water and/or black water recycling system and facility.
2. As-Built drawings for the above including photographs of installed system & facility.
3. Describe any deviation or addition to the FPA Submission.
Two (2) points are awarded if the development does not build or infringe on ALL of the following:
1. Forest Reserves, Wildlife Reserves, River Reserves or other forms of Protected Areas gazetted under
various legislation; or Environmentally Sensitive Areas (ESA) identified in the National Physical Plan,
State Structure Plan or District Local Plan; AND
2. Previously undeveloped land within 30 meters of a water body, defined as lakes, rivers, streams and
2
wetlands which support or could support aquatic and terrestrial biodiversity (as a habitat or corridor)
as well as provide ecosystem services such as water supply, flood mitigation, recreation or religious/
spiritual use; AND
3. Land which prior to acquisition for the project was public parkland, unless land of equal or greater
value as parkland OVER AND ABOVE what would be required by the local authority is included in
the development master plan.
DESCRIPTION
Forest Reserve is as described under the National Land Code and includes forest ecosystem in the coastal zones. Water
bodies includes rivers, streams, tributaries, reservoirs and ponds.
1. Survey plan of site indicating current land reserves with existing natural features such as lakes,
rivers, streams, tributaries and beaches etc. on the development site. Recommended scale 1:500
or 1:1000
2. Report on the status of the original land and proposed conservation or protection plan.
1. Final masterplan of site indicating the approved planning layout and any reserves.
2. Describe any deviation or addition to the PA Submission.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
DESCRIPTION
Brownfield sites are existing or contaminated sites, where the site was contaminated at the time of purchase and full remedial
steps will be taken to decontaminate the site prior to construction. This extends to former mining and rubbish tip.
Analysis of the soil, ground water and surface water through testing for hazardous compounds ensures that appropriate measures
of remediation are taken. Brownfield or infill redevelopment is recognised as a catalyst for community regeneration.
1. Submit a brief historical report on the usage of the land and prepare a report certified by approved
testing laboratory determining the level of contamination.
2. Submit an EIA report containing assessment of the level of contamination and proposed remediation
or decontamination to be taken and any other measures deemed appropriate.
1. No submission required as the certification will be carried out at the Completion & Verification
Assessment (CVA).
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Submit report and photographs of works carried out during the remediation of decontamination
process.
2. Describe any deviation or addition to the PA submission.
ECOLOGY 3 POINTS
EEC3
INTENT To minimise the impact of development on existing ecological diversity and balance.
A maximum of Three (3) points are awarded for compliance with ALL OR ANY of the following criteria:
DESCRIPTION
Biodiversity Survey, Impact & Action Plan
A) General
Identify available knowledge and also gaps on species, habitats, protected areas and ecosystems that exist within,
overlapping with or are adjacent to the site. Review existing national and local laws, policies, strategies and action plans
relevant to the conservation of biodiversity at the site.
D) Action Plan
1. Make recommendations for actions to reduce or eliminate identified impacts from the site activity.
2. Make recommendations for actions that will improve the biodiversity situation.
3. Develop and implement a plan for carrying out the recommended actions.
4. Develop and implement a long-term biodiversity monitoring programme.
5. Develop and implement a programme for dissemination of biodiversity information to local community and
stakeholders.
6. Develop and implement a biodiversity reporting system accessible to local community and stakeholders.
1. Submit a Biodiversity Baseline Survey and Biodiversity Impact Assessment for the development site.
2. Confirmation on the Biodiversity Action Plan for the site.
1. Summary of Biodiversity Action Plan indicating any changes to the original intent.
2. Describe any deviation or addition to the PA submission.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Submit report on the measures taken during construction to mitigate Biodiversity Impact.
2. Provide Implementation programme for long term biodiversity monitoring.
3. Confirm and provide programme to disseminate Biodiversity to the local community.
4. Describe any deviation or addition to the FPA submission.
One (1) point is awarded for compliance with the following criteria.
The Development site is assessed as having flood risk based on 50 years flood data:
A) For site classified a Flood Risk, the following measure must be employed,
1. Flood mitigating measures are adopted in accordance with JPS guidelines; AND
2. Flood risk response plan included in planning guide e.g. evacuation route etc. 1
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
One (1) point is awarded for compliance with whichever is the more stringent criteria:
1. Maintain a buffer zone of 30m to any wetlands or water bodies defined by the Structure Plan; OR
2. Development to be within setback distances from wetlands or water bodies prescribed in State or 1
local regulations.
DESCRIPTION
Development within the Wetland buffer zone is limited to grading work, pedestrian or bicycle pathways (no wider than
4m) and single storey structures for the purpose of enhancing public access, recreation, environmental conservation and
environmental education. Such developments should further be limited to 15% of the total buffer zone area for pathways and
another 15% of the total buffer zone area for all other permitted structures.
1. Survey Plan of site indicating Wetland and water bodies clearly marked on the development site.
Recommended scale a:500 or 1:1000 (drawing reference to EEC1 submission).
2. Development Plan of proposed site planning indicating setback or encroachment into the Wetland
and water bodies.
3. Report on the development approach to the natural site.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. As-Built plans showing original Wetland and water bodies, indicate any built structure and pathways
within the buffer zone.
2. Describe any deviation or addition to the FPA submission.
1. Site is not located on prime agricultural preserve for food production as defined by the Structure
Plan of the area or the National Physical Plan, AND
2. If prime agricultural land is converted for use in the development in question, the following mitigation
1
measures are adopted in planning for the development:
a. primary food production equal to 5 % or greater than the original agricultural preserve is included
in the final development plan of the township;
DESCRIPTION
Agricultural areas surrounding urban area and under threat. Minimising development impact on Prime Agricultural Land is
encouraged.
1. Survey plan indicating the Prime Agricultural land (if any) and land status.
2. Confirmation that the land was not previously converted from prime agricultural preserve.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Submit Final Masterplan with clear demarcation of prime agricultural preserve. With converted land,
define area demarcated for primary food production.
2. Describe any deviation and addition to the FPA submission.
One (1) point is awarded for compliance with ANY of the following:
1. The development is NOT located within any OR include any hill slope categorised as Class I, II or
III hill; OR
2. If the development is located within OR include sites with hill slope categorised as Class I; then proof
is shown that the development will leave the said Class I hill slope undisturbed and/or preserved
within the total masterplan of the development; OR
3. If the development is located within OR include sites with hill slope categorised as Class II or III;
then proof is shown that the development comply with Guidelines on hill slope development for 1
the relevant Class.
Note:
Class I gradient < 15°; Class II gradient > 15°, < 25°; Class III gradient > 35°
Guidelines above shall refer to BOTH planning guidelines for hillslope and highland area issued by the
Ministry of Housing and Local Government AND the “Highland Area Development Guidelines” issued
by the Ministry of Natural Resources and Environment.
1. Site plan and sections showing land current hill slopes with category descrification.
2. Submit preliminary report on in relation to hill slope and statement of compliance under hill slope
guidelines.
3. Proposed new platform and infrastructure levels for site development.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. As-Built Plans and section of hill slopes or cut slopes carried out on development site.
2. Describe any deviation or addition to the FPA submission.
Achieving the intent by reducing impervious cover, increase on-site infiltration, eliminating source pollutants and removing
pollutants from storm water run-off.
For either Condition, implement a storm water management plan that reduces impervious cover,
promotes infiltration, and captures and treats the storm water runoff from 90% of the average
annual rainfall using acceptable best management practices (BMPs).
B) Additional one (1) point awarded for eliminating and/or removing source pollutants from storm
water run-off so as to attain a Water Quality Index of Class II(b) water discharge from development 1
drainage systems.
DESCRIPTION
Demonstrate Sustainable Drainage system and Best Management Practice (BMP) stormwater drainage by attenuation locally.
Encourage alternative method of traditional hard engineering based drainage system with application of swale, sub-surface
or wading stream, drainage modules, dry ponds/wet pond or constructed wetland.
1. Submit confirmation on study report complying with MSMA requirements and on final stormwater
design and management approach.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Report, complete with photographic evidence and site reports signed off by qualified person on final
stormwater design and management.
2. Describe deviation or addition to the FPA submission.
One (1) point is awarded for compliance with ANY of the following criteria:
1. Existing infrastructure for sewage treatment located off-site is sufficient without the necessity to
“plant-up” NEW treatment plant at the site or off-site.
2. Existing infrastructure for potable water supply is sufficient without the necessity to lay NEW mains
water supply pipes and establishment of reservoirs off-site. 1
3. Existing infrastructure for electrical supply is sufficient without the necessity to lay NEW mains 33kV
cables and/or build NEW mains distribution station (defined as any electrical distribution stations
33kV and above) off-site.
4. Existing infrastructure for telephone off-site is sufficient without the necessity to lay new telecom
ducts.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Report complete with photographic signed off by qualified person on existing infrastructure utilities
and services to site.
2. Describe any deviation or addition to the FPA submission.
One (1) point is awarded for compliance with the following criteria:
1. Basic Compliance
Services reserve (or accessible services tunnels) are provided in public spaces for all services (water,
telecoms, sewage, chilled water pipes, electric cables). Services reserves take full cognisant of
1
pedestrian paths & networks, cycle ways, AND
2. In addition to basic compliance under (1) above, provision of a complete coordinated plan showing
all above ground and below ground services including provision for future expansion or addition of
services or where future services are expected to cross road ways or highway reserves.
1. Submit Development Plan indicating for all services mapped on the proposed Open Space (pedestrian
paths and networks), cycle routes and roads submitted by qualifies person.
2. Describe the Services Reserve strategy site wide.
3. Confirmation on intent to provide the services reserve as outlined in (1).
1. Submit final approved plan layout of Services reserve in respect to the open space, including
pedestrian paths or network, cycle routes and road, Coordinate information with drainage routes.
2. Describe any deviation or addition to the PA submission.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Submit As-Built drawings indicating the services reserve, both plans & sections signed off by qualified
person.
2. Describe any deviation or addition to the PFA submission.
One (1) point is awarded for compliance with lamp shielding, light trespass, glare and sky-glow limitations:
TABLE EEC11-1: LAMP TYPE AND SHIELDING STANDARDS (IDA PATTERN CODE)
Lighting Zones
Class and Lamp Type
E4 E3 E2 E1 E1A
Class 1 Lighting (Colour Rendition)
i. Output ≥ 2,000 lumens F F F F F
ii. Output < 2,000 lumens A A A F F
Class 2 Lighting (General Illumination) 1
i. Output ≥ 2,000 lumens F F X X X
ii. Output < 2,000 lumens A A A F F
Class 3 Lighting (Decorative)
i. Output ≥ 2,000 lumens F F F F F
ii. Output < 2,000 lumens A A A A F
Definitions of lamp cut-off and shielding applicable for both Tables WE2-1 and EI9-1 are as follows:
TABLE EEC11-2 : DEFINITION OF CUT-OFF (CIE 12:1995) FIGURE EEC11-3 : DEFINITIONS SHIELDING AND CUT-OFF
3 No Cut-Off - *1,000cd -
1. Summary report outlining strategies and procedures to be taken to meet credit requirements.
2. Commitment to meet requirement of night sky light pollution reduction.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. As-Built drawing and specification demonstrating that the lighting system and fixture selected has
been constructed according to the zone classification.
2. Describe any deviation or addition to FPA submission.
GREENSPACES 3 POINTS
CPD1
INTENT Environmental quality by moderating the impact of micro climate on surrounding public space.
A maximum of Three (3) points are awarded for compliance with ALL OR ANY of the following criteria:
B) Advanced Compliance - Two (2) points for provision of green spaces which can be classified as
recreational space accessible to residents.
One point up to a maximum of two points for provision of any of the following ‘recreational green
space’ which are within 800m from any residential lot within the development:
1. Public park 2
2. Playground
3. Community run herb garden
4. Recreational lakes
DESCRIPTION
Greenspaces are categorised as follows : Parks & Gardens, Natural & semi natural landscape, green corridors, outdoor green
recreational fields, allotments & community gardens, amenity Greenspaces & cemeteries. Category of Park will reference to
Planning standards local or national in terms of Playlots, Play field, Neighbourhood Park, Local Park, Urban Park, Regional Park
or National Park. For water bodies within parks, calculation will be subject to local authority standards acceptance.
1. Development and Landscape plan indicating greenspace area and summary data.
2. Submit commitment on greenspace provision.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Submit final as-built landscape plan indicating greenspaces area and detail data.
2. Described any deviation or addition to the FPA submission.
One (1) point awarded if the development meets the minimum CPD1 requirement and the average
gross density of the development complies with the local development intensity guideline OR meets
the following:
1. For Low Density (Detached House)
10.0% higher than the local development intensity guideline.
1
2. For Medium Density (Semi-detached/ Terrace / Townhouse / Cluster House)
7.5% higher than the local development intensity guideline
1. Submit Gross Floor Area and Density Calculation for Residential components of the Development
Plan.
2. Submit Site Plan with legend colours to differentiate the type of development.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
Up to three (3) points are awarded for location of planned essential facilities within 500m of each
residential unit on the development AND location of facilities (where applicable) are linked by walkable
pedestrian network which are also coordinated with public transport nodes for easy access:
One (1) point is awarded for the presence of any TWO of the following essential services up to a
maximum of three (3) points for at least six amenities:
a. Bank (Commercial)
b. Place of Worship
c. Convenience/Grocery (Commercial)
d. Day Care (Commercial)
e. Police Station
f. Fire Station
g. Beauty (Commercial)
h. Hardware (Commercial) 3
i. Laundry (Commercial)
j. Library
k. Medical/Dental (Commercial)
l. Senior Care Facility
m. Pharmacy
n. Post Office (Commercial)
o. Restaurant (Commercial)
p. School
q. Supermarket (Commercial)
r. Theatre
s. Community Centre
t. Fitness Centre (Commercial)
1. Submit plan identifying location of Commercial and Institutional areas with planned essential services
within 500m of any residential.
2. Commitment by developer to position the selected essential facilities within the development plan.
1. Submit Final Approved Plan Layout of all selected essential facilities mapped in relation to the
residential areas of the development .
2. Provide legend to differentiate the types of services
3. Describe any deviation or addition to the PA submission.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Submit Final Location Plan of all essential facilities mapped in relation to the residential areas of the
development.
2. Indicate Pedestrian network access to the essential facilities.
3. Describe any deviation or addition to the PFA submission.
1 point : If at least 25% of the pedestrian network, linkages, transit points & open spaces is of Universal
1
Design, OR
2 points : If at least 50% of the pedestrian network, linkages, transit points & open spaces is of Universal
2
Design, OR
3 points : If 75% or more of the pedestrian network, linkages, transit points & open spaces is of Universal
3
Design.
DESCRIPTION
Universal Design is the term used internationally for OKU (Orang Kurang Upaya) or design friendly to cater to both abled and
disabled persons. Environment accessible to people with disabilities often benefits others and includes sidewalk curb cuts,
designed to make sidewalks and streets accessible to those using wheelchairs, benefitting kids on skateboards, parents with
baby strollers, and delivery staff with rolling trolleys.
1. Summary report identifying the key features and site wide applications of Universal Design that will
be adopted in the design including target percentage coverage.
2. Commitment by Developer to undertake the Universal Design strategies.
1. Confirmation from the principal submitting person and developer for Universal Design strategies.
2. Describe any deviation or addition to the PA submission.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Layout Plan of Universal Design features linked to the pedestrian route and public realm.
2. As-Built plans & Photographic evidence on Universal Design accessibility features within the public
realm.
3. Summary Report identifying the key features and site-wide applications of Universal Design.
4. Describe any deviation or addition to the FPA submission.
Maximum of Two (2) points are awarded if the whole development is designed to comply with guidelines for ‘security-in-
planning’. Security for town planning include the following measures for compliance:
1. Compliance to CPTED (Crime Prevention Through Environmental Design) principles in site wide
1
application within the community.
2. Lighting in compliance with ISO 8995-3 and CIE S016 “Lighting of work places - Part 3: Lighting
1
Requirements for Safety and Security of Outdoor Work Places”.
1. Submit summary report on adopted CPTED principles for the development site wide.
2. Confirmation letter from the developer that the development will be designed and constructed to
CPTED principles.
3. Confirmation letter from the developer that the development will be designed and constructed to
ISO 8995-3 and CIRE SD016.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
One (1) point is awarded for compliance with to ALL of the following:
1. Zoning to ensure polluting industries ( including industrial facilities, markets and motor workshops)
are located on sites that have adequate wastewater collection & treatment facility.
1
2. Ensure that all drainage system and water features will not be a source for water-borne disease and
vectors.
3. Where waste are hazardous and listed in DoE schedule, a plan for disposal through licensed waste
disposal OR on-site treatment to DoE requirement shall be included.
Additional One (1) point awarded for eliminating and/or removing source pollutants from storm water
run-off, in compliance with ALL of the following:
1. Provision of appropriate sullage collection treatment systems. Oil and grease traps must be installed
in all wet markets, school canteens, food courts and shopping complexes.
1
2. In all cases where restaurant discharge kitchen waste and workshops discharge industrial grease or
waste (not under (1) above), proper grease traps or waste treatment plan shall be included in the
planning, design and construction of such facilities.
3. At least 50% of source pollutants are removed.
1. Layout plan indicating zoning or parcelling within the development, indicating industries, petrol
station & wet markets.
2. EIA or Environmental Impact Assessment Engineer report on the strategy for mitigating and controlling
hazardous waste & pollutants from within site of development.
3. Confirmation Letter from developer to undertake measures to meet target credits.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
A) One (1) point for provision of facilities for recycling within the development. Amenities to be
provided include the following:
1. Community recycling centre with bins located at centralised location with truck access; AND 1
2. Support from the local waste disposal company appointed by the local authority supporting
local recycling initiatives.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. As-Built drawings and photographs of Recycling strategies adopted site wide for the development.
2. Final report on the amount of recycling capacity collection and disposal and location for community
recycling centre.
3. Describe any community based programme for Recycling initiated for the development by the
Resident Association.
4. Describe any deviation or addition to the FPA submission.
Encouraging the reasonable percentage of diversity in housing, diversity being measured as follows:
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
Encouraging the diversity of affordable housing to comply with the local authority guideline.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
A) The first point is awarded for compliance with the basic requirements:
1. Developer to establish active dialogue with existing community within the vicinity of the
development. Developer must show that active measures to address issues of existing
community will be taken into account in the new development, OR 1
2. Developer to provide evidence that active dialogue with purchasers on features on sustainable
practice of proposed development is maintained in the duration of the development and
construction period leading to handing over.
D) The forth point is awarded for compliance with ANY THREE of the activities listed below will be
implemented by the Resident Association (or included in the charter of the Resident Association):
1. Community based recycling programme with at least separation at source of paper, glass,
metal, plastic and toxic material.
2. Community based waste management system. 1
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
GOVERNANCE 4 POINTS
CPD11
INTENT Encourage Community participation and maintenance of sustainable practice.
A total of four (4) points are awarded if the local government concerned has in place the following measures or practices:
B) Additional one (1) point for compliance to ANY TWO of the following measures up to a maximum
of three (3) points for compliance of up to six programmes.
1. An active complaints bureau which addresses local issues.
2. Adopt guidelines on CPTED in development.
3. An active crime prevention programme implemented in cooperation with the police and
resident association.
4. An active procedure which engages the community for public review and consultation for 3
development projects.
5. Implementing a recycling programme with separation of waste at source at the local level.
6. An active programme of having regular dialogue sessions with local resident associations.
7. An active Local Agenda 21 programme with participation from at least 50% of the resident
associations.
8. Other GBI approved programmes on sustainability initiated by the local authority.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
A Green Transport Masterplan which shall be adopted, designed and constructed in the development with these primary
considerations.
Reducing travel by car by promoting efficient linkages, shorter travel distances to essential services and sustainable patterns
of development (such as pedestrian walkways, bicycle lanes, mixed-use development and alternative forms of sustainable
transportation system).
Promoting the use of public transportation system by integrating or upgrading of existing public transportation system or
the creation of new public transportation system.
Accessibility of the location including accessibility by non car mode by providing or integrating or upgrading to existing
public transportation system and vehicular access networks.
DESCRIPTION
Green Transport Masterplan is a traffic planning that promotes transit oriented development integrated with pedestrian and
cycling network and the linkages of the development. Trip generation is a sequential process of transportation modelling
which establishes the relationship between land use, socioeconomic and demographic data also described as Trip Production
and Trip Attraction. The enclosed calculation for Trip Production and Trip Attraction has been included to determine the
generated movement within the development site.
Model demand is aggregated into zones. Trips originate and terminate at zone centroids. A trip has two ends, Trip Production
and Trip Attraction. A trip also has an origin and a destination. This will depend on trip purpose. For example, because we
generate work trips in two parts (the production end and the attraction end), assign the production end to the home zone.
Departure from Work for a destination is captured as Trip Production.
Travel Purpose
Travel
Mode
Work School, Educational Centre Shopping, Amenities, Recreation
2 student places / household within 500m Full range of everyday amenities within 500m
1 job/household within 500m walking distance
walking distance walking distance
5 points
5 points 5 points
Walk
1 job/ 2 households within 500m walking 1 student place/household within 500m Specialist amenities within 500m walking
distance walking distance distance
2 points 2 points 2 points
1 student place/household within 3km cycling
1 job/ household within 5km cycling distance
Cycle distance -
2 points
2 points
2 jobs/household within 20 minutes journey 2 student places within 15 minutes journey Full range of amenities within 15 minutes journey
Public time by existing or committed public transport time by existing or committed public transport time by existing or committed public transport
Transport system (includes walk times at trip ends) system (includes walk times at trip ends) system (includes walk times at trip ends)
5 points 5 points 4 points
Travel Purpose
Travel
Mode
Work School, Educational Centre Shopping, Amenities, Recreation
Notes:
The points values allocated in the tables are specific to the transport assessment to achieve a differential effect between
alternatives. To fit the overall environmental standards assessment, scheme points achieved in the transport assessment
should be set against the total points available and scaled down pro rata to the points allocated to transport in the overall
assessment. E.g. if a development proposal scores 48 points out of a possible 65 in the transport assessment the overall
environmental transport assessment transport shall be 7 points.
1. Summary Report on Green Transport Masterplan (includes TIA) covering proposed development
framework, surrounding catarments, surveys, existing conditions.
2. Forecast of future traffic shall be at against the Trip Production & Trip Attraction TRC-1 Matrix as part of
the strategic Green Transport Plan.
3. All linkages both pedestrian and vehicular from surrounding developments shall be included.
4. Confirmation from the developer to adopt Green transport strategies to meet development
requirements.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Submit final Green Transport Report indicating all road upgrades, new roads, pedestrian networks,
transit points or hubs completed by qualified Engineer for the development.
2. As-Built Site Plan indicating all road upgrades, roads, pedestrian networks, public amenities and
facilities, transit points as an Integrated Green Masterplan with photographs of key element.
3. Describe any deviation or addition to the FPA submission.
One (1) point is awarded for compliance to the following (compliance statement submitted in
conjunction with the traffic assessment impact report submitted under TRC2):
1. Inter community accessibility via public transportation catering for more than 30% of its estimated
traffic generation to external hubs (Note 1), AND
2. Intra-community travel via car is decreased by at least 40% via internal public transportation network
OR it can be shown that an integrated pedestrian walkway and/or bicycle network systems are
viable alternatives (Note 2).
DEFINITION 1
Note 1:
Traffic generators within development including restaurant, schools, retail outlets, supermarkets,
commercial centres and office etc shall be included within the calculation. External traffic generators
include “hubs” such as city central business district, large retail outlets etc.
Note 2:
Intra-community travel can be identified by travel generated between different usage zones within a
development. In a ‘small neighbourhood development’, intra-community travel may be mitigated by
network of pedestrian and bicycle routes. Larger development may require an integrated public or
alternative transportation network such as trams, mini-bus routes, park-and-ride etc.
1. Summary Report on the Intra and later community targets and strategies for the reduction of travel in
the planning of the development.
2. Confirmation on the target Intra and Inter community travel for the development.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Summary report confirming the achieved Inter and Intra community travel for the completed project
by qualified person. Include same data to meet criteria and completion studies qualification to meet
the design intent.
2. Describe any deviation or addition to the FPA submission.
2. Provision of covered or shaded walkway linking to sheltered bus stops and/or stations (under (1)
above) to the nearest residential or commercial centres.
1. Location of all covered or sheltered bus or transit points in relation to the furthest residentials within
the masterplan. Label the different types of bus stops.
2. Confirmation from developer for the provision of covered or sheltered bus or other transit stops.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. As-Built Site plan indicating all transport facilities accessible within 500m radii of every housing unit
or non-residential unit, AND
2. Submit report and photographs of the transport facilities and covered or shaded pedestrian
linkages.
3. Describe any deviation or addition to the FPA submission.
One (1) point is awarded for the provision of pedestrian network (existing or planned) serving the
development AND evidence that the said pedestrian network comply with the following basic
requirements:
1. The pedestrian network is planned as a link from hubs within neighbourhood zones (residential
zones, commercial zones etc) to all other units within said zones including key public amenities
within the zone. 1
2. The pedestrian network links to transitory hubs (cycling, public network, bus routes etc) within a
walkability zone.
3. At least 75% of the pedestrian routes are covered or shaded.
4. Proper signages are provided for the safe and proper usage of pedestrian network by the
residents.
1. Submit site plan, if different to TRC1, indicating the pedestrian networks in and around the site.
2. Submit proposal for the pedestrian links, to land parcels, open spaces and significant features and the
adopted special features site wide.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Submit As-Built Site Plan drawings and sections on the pedestrian networks, types adopted into the
final development.
2. Submit photographs and report on the pedestrian network.
3. Describe any deviation or addition to the FPA submission.
A) The first point for EITHER an existing cycle network OR a new planned cycle network serving
the development AND evidence that the said cycle network complies with the following basic
requirements:
1. The cycling network is planned to link to ALL amenities provided (if relevant) under CPD3 (Local
Amenities), CPD11 (Amenities for Community Thrust), CPD1 (Recreational Green Spaces) and
any other key public facilities relevant.
1
2. The cycling network provide an easy accessible linkage from ALL residential units to commercial
zones and other zones.
3. Cycling networks are dedicated lanes.
4. Proper signages are provided for the safe and proper usage of cycling network by the
residents.
B) The second point is awarded ONLY AFTER COMPLIANCE with the first point above AND if at least
ANY TWO of the following amenities are provided to promote a cycling network:
1. Provision of bicycle storage space at focal points of development (focal point is defined as key
public facilities which are possible focus of human traffic (e.g. markets, schools, restaurants etc.).
The capacity of storage space shall be based on an estimate of population traffic projections. 1
2. Provision of tree-line shaded cycle lanes for at least 75% of the cycling network.
3. Provision of “rest-stop” facilities at every 750m intervals of cycle lanes, said rest-stops shall
be shaded with suitable amenities (bicycle parking yard, refreshment booth and others to be
proposed etc).
1. Submit Brief summary on the cycling network and facilities strategy site wide for the development.
2. Confirmation from developer to provide the cycling networks and facilities for the site.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Submit As-Built cycling route plans and sections for the development. Locate all facilities provided
for cyclists.
2. Submit report and photographs of all facilities.
3. Describe and deviation or addition to the FPA submission.
One (1) point awarded for compliance with ANY of the following “Green Initiatives”:
a. Provision of charging station for electric cars at ALL strategic locations such as hubs for essential
public amenities or commercial centres or neighbourhood focal point.
b. Park and Ride depot with parking facilities and public transport for commercial centres;
c. Management of car pool system for residents.
d. Community Bicycle Rental managed by the local authority or resident association or community 1
centre.
e. “Green Public Vehicle” for transportation within neighbourhood hubs (‘green vehicle’ to include
vehicles operating on electric or biofuel).
f. Central Travel Information Centre created by for the development for the community.
g. “Other Sustainable Transportation Mode” approved by GBI.
1. Submit a brief on the Green Initiatives that will be adopted for the development site.
2. Confirmation from the developer that these initiatives will be implemented during final development
stage.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Submit report and photographs of the Green Initiatives completed for the development.
2. Describe any deviation or addition to the FPA submission.
The use of materials for new infrastructure such that the sum of post consumer and/or pre-consumer
recycled content can be established by cost; or by weight converted to cost.
1. One (1) point given where use of materials with recycled content is such that the sum of post
1
consumer recycled plus one-half of pre-consumer content constitutes more than 10% (based on
cost) of total value of materials in the project.
Infrastructure items include roadways, base and sub base materials, drains, curbs, water and sewage
infrastructure, electrical and telephone infrastructure and street furniture.
1. Identify on-site materials (e.g. earth or rocks) or off site recycled material for construction of the
infrastructure.
2. Confirmation on commitment for recycled content in construction of infrastructure.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
The use of materials for new buildings and structures such that the sum of post consumer and/or pre-
consumer recycled content can be established by cost; or by weight converted to cost.
1. One (1) point given where use of materials with recycled content is such that the sum of post
consumer recycled plus one-half of pre-consumer content constitutes more than 10% (based on 1
cost) of total value of materials in the project.
Building & Structures items include bridges, structures in the Open Space and any other buildings fall
within the site wide development.
1. Identify on-site materials (e.g. earth or rocks) or off site recycled material for construction of the
buildings & structures.
2. Confirmation on commitment for recycled content in construction for the buildings & structures.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
Use building/construction materials that are extracted and manufactured within the region, thereby
supporting the use of indigenous resources and reducing the environmental impacts resulting from
transportation:
1. Use building/construction materials that have been extracted, harvested or recovered, as well as
1
manufactured, within 500km of the project site for ≥ 70% (based on cost) of the total material
value.
Mechanical, electrical and plumbing components shall not be included. Only include materials
permanently installed in the project.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. List of products that were extracted/harvested/recovered and manufactured within 500km of the
project site after completion for the 70% of the total material value.
2. Provide Name & manufacturer, product cost, AND the distance between the project site and
manufacturer.
3. Determine the Actual Material cost.
4. Calculate the percentage of Regional materials used + Total Cost of Regional Materials/Total Material
Cost.
5. Describe any deviation or addition to the FPA submission.
One (1) point is awarded for compliance with ANY of the following:
DESCRIPTION
External works cover the general external work elements in building construction such as the link-ways/shelters, drains,
roadworks, car parks footpaths, turfings, playgrounds, gates and fences, swimming pools, hardscapes and electrical
substations.
1. Submit preliminary Project Quality Plan, QLASSIC is to be understood by all consultants and owner
early in the design stage captured in the tender works: OR
2. Confirmation by developer to adopt QLASSIC for the construction phase of the development.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
Evidence that a comprehensive construction waste management and recycling scheme is implemented
for the whole site (building and infrastructure):
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Submit final construction waste management monthly report for the entire construction period,
complete with photographic evidence and site reports verified by qualified person.
2. Describe any deviation or addition to the FPA submission.
Provide evidence that a comprehensive Erosion and Sedimentation Control Plan (ESC) is implemented
for the whole site (for building, structures, and for infrastructure works). The plan should include the
following elements:
1. Drainage of site
2. Sedimentation Control Plan.
3. Prevent loss of soil during construction by stormwater runoff and/or wind erosion, including 1
protecting top soil by stockpiling for reuse; AND
4. Prevent sedimentation of storm sewer or receiving stream; AND
5. Prevent polluting the air with dust and particulate matter
6. Monitoring compliance to CSPC during construction
7. Ensuring compliance to CSPC during construction
DESCRIPTION
Site construction activities have a large impact on the local environment. A direct result of construction activities is a
disturbance of the natural terrain and earth formation which results in sedimentation to existing drainage and hydrological
system. Construction activities also introduce pollution to the local environment. In Malaysia, site sedimentation and pollution
control of construction site is mandatory under the control of local authorities. This criteria aims to reinforce the mandatory
requirement of site sedimentation and pollution control by introducing a clearer and (in some case, a higher standard) of
practice for site sedimentation and pollution control. A Construction (Site) Sedimentation & Pollution Control Plan (CSCP)
forms the basis for reporting on measures for construction activities.
1. A proper CSPC Plan should be adopted and understood by all consultants and the developer early
during design stage and captured in the tender specifications. Submit Preliminary CSPC Report Plan
for the construction works.
2. Confirmation to proceed and comply with CSPC for the whole site during construction.
1. Submit CSPC Report to confirm compliance with the intent of this criteria.
2. Submit plan showing CSPC measures for construction.
3. Describe any deviation or addition to the PA submission.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Submit final CSPC report, complete with photographic evidence and site reports verified by qualified
person confirming that CSPC plan has been complied with during constructions.
2. Sample report and QC checklist of CSPC plan to be included in report.
3. Describe any deviation or addition to the FPA submission.
Minimum 2 measures for one (1) point are awarded up to a maximum of two (2) points.
1. Implement rainwater harvesting for site use.
2. Install workers amenities over and above statutory requirement (e.g. provision of rest and
recreation facilities). 2
3. Preserve existing greenery.
4. IBS system is implemented up to a minimum score of 30%.
5. Any other sustainable ‘green-construction measures approved by the GBIAP.
1. Submit selected criteria or list any other GBI approved sustainable green construction measures to
be adopted for the Development.
2. Provide summary report on strategies describing the adoption and future implementation.
1. Submit Summary report on sustainable construction strategies to be adopted for the development
by Qualified person.
2. Describe any deviation or addition to the PA submission.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. As-Built drawings and photographs demonstrating the selected sustainable construction measures
undertaken during construction.
2. Submit final report on sustainable construction measures complied with during construction.
3. Sample report and QC checklist of sustainable construction practices on site.
4. Describe any deviation or addition to the FPA submission
1. Determine the total Development plan GFA and indicate the GFA of building parcels that will be built
to achieve GBI Certification
2. Confirmation from developer for the building parcels achieving GBI certification for each Phase of
the development.
1. Submit parcels or buildings selected for GBI certification and total development GFA for these
selected projects.
2. Describe any deviation or addition to the PA submission.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Confirm the total development GFA for buildings built achieving GBI certification.
2. Submit evidence of buildings and GFA achieving GBI certification.
3. Describe any deviation or addition to the FPA submission.
BUSINESS 3 POINTS
BSI1 Promote business activities thereby creating business opportunities at the local level and reducing commuting
INTENT
time for the resident.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Review on completed Masterplan on the feasibility study described in at the FPA submission.
2. Describe any deviation and addition to the FPA submission.
INNOVATION 6 POINTS
BSI2
INTENT Promote innovative solutions which are sustainable and reduce carbon emissions.
Up to Six (6) points are awarded for implementing any of the listed innovations (one point per
innovation up to a maximum of 6 points):
1. Active Design strategies
a. Innovative on-site generation (solar cooling, biomass, biodigester, etc)
b. Innovative green energy supplied by certified “green-energy” supplier
c. Community grey water recycling
d. Community black water recycling scheme
e. Community food production
f. Community food garden
g. Community recycling scheme 1
1. Summary report on each innovation, sustainable features and benefits or in the case of (2) and (3)
cultural, social or economic benefit to the community.
2. Commitment by developer to adopt these innovations for the development site.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI