Specification: Foundation Plan

The document provides specifications for concrete work for the renovation of a residential building. It outlines requirements for forms, removal of forms, slab floors, steel reinforcing bars, and other concrete construction details.

Uploaded by

Renzel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
152 views1 page

Specification: Foundation Plan

The document provides specifications for concrete work for the renovation of a residential building. It outlines requirements for forms, removal of forms, slab floors, steel reinforcing bars, and other concrete construction details.

Uploaded by

Renzel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SPECIFICATION FORM FOR CONCRETE WORKS

THIS SET OF SPECIFICATION SHALL GOVERN THE METHODS OF ALL FORMS OF CONCRETE WORKS SHALL BE
CONSTRUCTION AND THE KINDS OF MATERIALS TO BE USED FOR THE PROPERLY BRACED OR TIED TOGETHER SO AS TO MAINTAIN SCHEDULE OF COLUMN FOOTING
RENOVATION OF RESIDENTIAL BUILDING SHOWN IN THE PLANS AND THE CORRECT POSITION AND SHAPE OF THE CONCRETE
DETAIL DRAWINGS. MEMBER FORM SHALL BE CONSTRUCTED SUFFICIENTLY DIMENSION OVERALL DEPTH
TIGHT TO PREVENT BULGING AND WATER SEEPAGE. FROM NGL. TO
GENERAL CONDITION MARK LENGHT WIDTH THICKNESS THE BOTTOM OF BASE BARS
FORM SHALL NOT BE REMOVED UNTIL THE CONCRETE (T) FOOTING ( D )
ALL PARTS OF THE CONSTRUCTION SHALL CONFORM TO ALL HAS ATTAINED SUFFICIENT STRENGTH TO SUPPORTS ITS
REQUIREMENTS OF THE NATIONAL BUILDING CODE AS WELL AS THE OWN WEIGHT AND LOADS THAT MAY BE PLACED ON IT. SIDE
LOCAL RULES AND REGULATION OF SIPOCOT, CAMARINES SUR.
F-1 1.20 1.20 0.30 1.20 8 - 16mm Ø BOTHWAYS
FORMS OF BEAM GIRDERS MAY BE REMOVED EARLIER THAN
THE BOTTOM FORMS BUT ADDITIONAL VERTICAL SUPPORT
F-2 1.20 1.20 0.30 1.20 8 - 16mm Ø BOTHWAYS
SITE CLEARING OR SHORING MUST BE PLACED UNDER THE BEAMS OR
GIRDERS UNTIL THEY HAVE ATTAINED THEIR STRENGTH. 1
THE BUILDING SITE SHALL BE LEVELED ACCORDING TO THE
PLANS AND CLEAR OF RUBBISH, ROOTS AND OTHER PERISHABLE F2
CONCRETE SLAB FLOOR ON FILL -1 -
AND OBJECTIONABLE MATTERS TO A SUITABLE SUBGRADE. FTB - 1 C2 SCHEDULE OF COLUMN
WF
CONCRETE SLAB ON FILL SHALL BE POURED ON A
ALL SUCH UNSUITABLE MATERIALS SHALL BE REMOVED FROM GRAVEL BED OF NOT LESS THAN 100mm THICK. EACH NUMBER OF REINFORCEMENTS
THE BUILDING, SITE AND SPREAD UNIFORMLY OVER THE AREAS MARK FIGURE

FTB- 1
CONCRETE SLAB COARSE TO BE POURED ALTERNATELY TO
ADJACENT TO THE PROPOSED BUILDING, OR OTHERWISE DEPOSED THE INDICATED FLOOR.
PIECES
OF AS MAY BE DIRECTED BY THE ARCHITECT OR ENGINEER IN -1 F2
SLAB ON FILL VERTICAL BARS LATERAL TIES
CHARGE OF THE CONSTRUCTION. FTB - 1 - ELEV. ±0.15m
STEEL REINFORCING BARS WF ELEV. C2 0.30
±0.10m
STAKING OUT OF BUILDING LINES WF- 1 USE 10mm LATERAL TIES
ALL STEEL REINFORCING BARS TO BE USED FOR THE
C-1 17

0.30
CONSTRUCTION SHALL CONSIST OF ROUND DEFORMED
FTB- 1 FTB- 1 8 - 16mm Ø CLEAR SPACING 3 @ 0.05,
3 @ 0.10 & REST 0.15 O.C.
THE BUILDING LINE SHALL STAKE OUT AND ALL THE LINES ARE BARS WITH LUGS OR PROJECTIONS ON THEIR SIDES TO C1 - F1 C1 - F1
SHOWN IN THE DRAWING ESTABLISHED BEFORE ANY EXCAVATION IS F2
PROVIDE GREATER BOND BETWEEN THE CONCRETE AND -
STARTED, BATTER BOARDS AND REFERENCES MARKS SHALL BE STEEL. ALL STEEL REINFORCING BARS SHALL BE ACCURATE C2

FTB- 1

FTB- 1
SLAB ON FILL SLAB ON FILL

WF- 1
ERECTED AT SUCH PLACES WHERE THEY WILL NOT BE DISTURBED 0.30
PLACED AND SECURE AGAINST DISPLACEMENT BY TRYING ELEV. ±0.15m ELEV. ±0.15m

FTB- 1
WF- 1
DURING THE EXCAVATION OF THE BUILDING. THEM TOGETHER AT EACH BAR INTERSECTION WITH GAUGE USE 10mm LATERAL TIES
C-2 3 8 - 16mm Ø CLEAR SPACING 3 @ 0.05,

0.30
NO. 18 G. I. WIRE.
EXCAVATION 3 @ 0.10 & REST 0.15 O.C.
WF- 1 WF- 1

ALL EXCAVATION SHALL BE MADE TO GRADE INDICATED IN THE


THE STEEL REINFORCING BARS INDICATING FOR THE
FOOTINGS, COLUMN, SLABS, BEAMS, GIRDERS AND OTHER
4 FTB- 1 FTB- 1

DRAWINGS WHERE THE BUILDING SITE IS COVERED WITH ANY KIND C1 - F1 C1 - F1 C1 - F1


CONCRETE MEMBERS SHALL ALL CONFORM TO BE THE
OF FILL. THE EXCAVATION FOR FOOTING SHOULD BE MADE DEEPER NUMBER, SIZE AND SPACING AS INDICATED IN DRAWINGS
UNTIL THE STRATUM FOR SALE BEARING CAPACITY OF THE SOIL IS SCHEDULE OF STEEL REINFORCEMENT.
REACHED. WHEREVER WATER IS ENCOUNTERED IN THE EXCAVATION

FTB- 1

FTB- 1

FTB- 1
SLAB ON FILL

WF- 1

WF- 1
SLAB ON FILL

WF- 1
PROCESS, IT SHALL BE REMOVED BY DEWATERING METHOD OR ALL STRUCTURAL STEEL TO BE USED SHALL CONFORM ELEV. ±0.20m ELEV. ±0.20m
PUMPING OUT THE WATER CARE BEING TAKEN THAT THE TO THE RESULT OF THE STRUCTURAL COMPUTATION. NO
SURROUNDING SOIL PARTICLES ARE NOT DISTURBED. MATERIALS METAL REINFORCEMENT SHALL BE INSTALLED IN PLACE
REMOVED FROM EXCAVATION SHALL BE USED FOR BACKFILL UNLESS IT IS FREE FROM RUST, SCALE OR OTHER COATING
AROUND THEM MAKING SURE THAT THE CONCRETE FOR WHICH WILL DESTROY OR REDUCE THE BOND WITH WF- 1 WF- 1
FOUNDATION ARE HARD ENOUGH TO WITHSTAND THE PRESSURE CONCRETE. FTB- 1 FTB- 1
RESULTING FROM FILLS. 19 NGL.
C1 - F1 C1 - F1 SLAB ON FILL C1 - F1
CARPENTRY, DOORS AND WINDOWS
CONCRETE WORKS ELEV. ±0.20m
FTB ( SEE SCHEDULE )
FRAMING LUMBER SHALL BE ROUGH DIMENSION
ALL CONCRETE SHALL BE MIXED THOROUGHLY UNTIL THERE IS SHOWN IN THE DRAWING. ALL EXPOSED WOODWORK LIKE

FTB- 1

FTB- 1
FTB- 1
SLAB ON FILL

WF- 1

WF- 1
UNIFORM DISTRIBUTION OF THE CEMENT AND AGGREGATES AND JAMBS SHALL BE SMOOTHLY DRESSED. ENTRANCE AND
SHALL BE DEPOSITED NEARLY AS PRACTICABLE IN ITS FINAL 1 ELEV. ±0.20m
SERVICE DOOR SHALL BE SOLID PANEL DOOR. BEDROOM
POSITION. DOORS SHALL BE FLUSH HOLLOW CORE WITH MOLDINGS ON COLUMN
( SEE SCHEDULE )
BASE BARS
VERIFY SCHEDULE

THE FRONT FACE. ALL WINDOWS SHALL BE STEEL


WATER TO BE USED IN MIXING CONCRETE SHALL BE CLEAN CASEMENT WITH 3/16" THICK CLEAR GLASS PANES. BASE BARS
VERIFY SCHEDULE
AND FREE FROM INJURIOUS AMOUNT OF OILS, ACIDS, ALKALI, SALT FTB- 1 FTB- 1
AND OTHER ORGANIC MATERIALS. PLUMBING
C1 - F1 C1 - F1 C1 - F1
PROPORTIONING OF CONCRETE ALL PLUMBING WORKS SHALL BE DONE IN SLAB ON FILL
75mm THK. GRAVEL BASE
ACCORDANCE WITH THE LATEST EDITION OF NATIONAL ELEV. ±0.20m
ALL CONCRETE WORKS SHALL BE DONE IN ACCORDANCE WITH COLUMN FOOTING PLAN COLUMN / FOOTING SECTION
PLUMBING CODE OF THE PHILIPPINES. SLAB ON FILL

FTB- 1

FTB- 1
FTB- 1
THE STANDARDS SPECIFICATION FOR PLAIN AND REINFORCED

WF- 1

WF- 1
WF- 1 ELEV. ±0.20m
CONCRETE AS ADOPTED BY THE GOVERNMENT. CEMENT TO BE
USED SHALL APPROVED BRAND WHETHER PORTLAND OR POZZOLAN
ALL MATERIALS E.G., PIPINGS, FITTINGS, VALVES AND
FIXTURE HEREIN SPECIFIED AND SHOWN IN THE PLANS AND ELEV.
1 1
CEMENT AND MORE READILY AVAILABLE IN THE LOCALITY. THE THOSE OF WHICH ARE ESSENTIAL AND HAVE BEEN ±0.15m
FOLLOWING PORTION OF CONCRETE MIXTURE SHALL BE USED FOR SPECIFIED SHALL BE NEW AND OF THE HIGHEST GRADE AND WF- 1 WF- 1
THE VARIOUS PARTS OF THE BUILDING. QUALITY, FREE FROM DEFECT, SUCH AS BREAKS OR OTHER FTB- 1 FTB- 1
IMPERFECTION.
COLUMNS AND FOOTING CLASS "A" (1: 2: 4) C1 - F1 C1 - F1 C1 - F1
TIE BEAM CLASS "A" (1: 2: 4) ALL MATERIALS INSTALLED ARE TO BE CONCEALED IN
CONS. SLAB FLOOR ON FILL CLASS "A" (1: 2: 5) THE BUILDING PARTITION WHEREVER POSSIBLE. AIR TIGHT NGL.
SEPTIC TANK SHOULD BE PROVIDED.
FTB- 1

FTB- 1

FTB- 1
WF- 1
SLAB ON FILL SLAB ON FILL

WF- 1
MASONRY WORKS
ELEV. ±0.20m ELEV. ±0.20m
ELECTRICAL FTB ( SEE SCHEDULE )
USE 100mm CHB THOROUGHLY CURED MACHINE MADE OR
LOCALLY MADE MANUFACTURED CHB WITH 10mm VERICAL BARS THE ELECTRICAL WORK SHALL BE UNDER THE
SPACE AT 0.60m AND HORIZONTAL BARS FOR EVERY 3 LAYERS. SUPERVISION OF A LICENSED ELECTRICAL ENGINEER AND WF- 1 WF- 1
MUST BE DONE IN ACCORDANCE WITH THE LATEST EDITION FTB- 1 FTB- 1
OF THE PHILIPPINE ELECTRICAL CODE AND LOCAL C1 - F1 C1 - F1 C1 - F1
COLUMN
( SEE SCHEDULE )

AUTHORITIES CONCERNED IN THE ENFORCEMENT OF THE


BASE BARS
ELECTRICAL LAWS AND ORDINANCES. VERIFY SCHEDULE

DEVIATION OF SPECIFICATION

THERE WHERE NO PROVISION FOR THE ADDITIONAL 75mm THK. GRAVEL BASE
ITEMS AND SIZES, ADDITION CHANGES ON THE SIZE OF COLUMN FOOTING PLAN COLUMN / FOOTING SECTION
MATERIALS IN THE SPECIFICATION. HOWEVER, IF THE
OWNER SO DESIRE, ADDITIONAL ITEMS MAY BE INSTALLED
AND SIZES AND OF MATERIALS MAYBE INCREASED UPON
THE APPROVAL OF THE CIVIL ENGINEER AT THE DISCRETION
AND EXPENSES OF THE OWNER.
FOUNDATION PLAN
COLUMN FOOTING DETAILS

CERTIFIED BY: PRC NO: 0181096 PROJECT TITLE AND LOCATION: APPROVED BY: REVISIONS: SHEET CONTENT: SHEET NO.
TIN: 612- 743- 115

PTR NO: 0060632 S-1


ENGR. JAN LESTER M. LOPEZ
PROPOSED TWO-STOREY RESIDENTIAL BUILDING AS SHOWN
ISSUED ON: 09- 19- 22 ALVIN KASILAG
4 9
CIVIL ENGINEER ISSUED AT: SIPOCOT, CAM. SUR BRGY. IMPIG, SIPOCOT, CAMARINES SUR OWNER