PMAS-Arid Agriculture University, Rawalpindi: Final Project Proposal Examination and Result Management System
PMAS-Arid Agriculture University, Rawalpindi: Final Project Proposal Examination and Result Management System
Submitted By
Supervisor
1
Project ID GIMS-BSCS-201701
Dated: November1,2023
Approval
I Mr. / Ms. Awais Ilyas am willing to guide these students in all phases of project
titled “. Examination and Result Mangement System ” as supervisor. I have carefully
seen the Title and description of the proposal and believe that it is of an appropriate
difficulty level for the number of students named above.
2
Supervisor
Mr / Ms. Awais Ilyas
PProfessor, GIMS
Abstract
Introduction
This document lays out a project plan for the development of “Examination and
Result Management System. The plan will include, but is not restricted to, a summary of
the system functionality, the scope of the project from the perspective of the
3
“Examination and Result Management System” team (me and my mentors), project risks
and how those risks will be mitigated, the process approach to develop the project, and
metrics and measurements that will be recorded throughout the project. This document
will cover each of the system’s intended features, as well as offer a preliminary glimpse
of the software application’s User Interface (UI). The document will also cover hardware,
software, and various other technical dependencies.
Problem Statement
In our current examination conduction and result processing system, there is too
much manual and paperwork used for conduction of exam and computation of result.It
becomes very difficult to manage record of all students manually which results in heap of
files. So, there is always a risk of loss of information due to various reasons.Also, there is
imbalance between the man power availability and magnitude of the examination work
which results in inaccuracy and delay in declaration of result.Our software is designed to
efficiently manage all the records of the students, automatically calculate the percentage
and grade point of the students.With the use of our software, the span required for
declaration of result and use of man power will be reduced to a great extent.
Significance
The significance of a Result and Management System (RMS) lies in its ability to
efficiently process and manage data, particularly in the context of exams or assessments.
Its uniqueness can be attributed to features such as automation, customization, data
analysis, and security, which set it apart from traditional manual methods. An RMS
streamlines processes, reduces errors, and supports data-driven decision-making, making
it a valuable tool for organizations and educational institutions.
Objectives
The objectives you've listed are related to the development of a result and management
system for handling social media data with specific features and functions. To
summarize, the objectives are:
Develop a Search Application: Create a desktop application that allows users to search
for specific hashtags on social media platforms.
4
ongoing or past events or campaigns associated with the hashtags.
Collect Social Media Responses: Collect and store responses and data from social media
related to the use of the specified hashtag.
Perform Sentiment Analysis: Apply sentiment analysis to the collected data to gauge
public satisfaction and sentiment regarding the event or campaign.
Generate Graphs and Reports: Utilize the sentiment analysis results to generate graphs
and reports that provide insights into public satisfaction and sentiment trends.
Utilize Data for Event Enhancement: Use the gathered data to enhance the event's
attractiveness, such as randomly selecting winners for a lucky draw and printing pictures
collected from social media posts.
Certainly, when considering the limitations and restrictions of a Result and Management
System (RMS), it's important to be clear about what the system will not do to set realistic
expectations. Here are some internal and external limitations and restrictions:
Internal Limitations:
Data Quality: The system's accuracy is dependent on the quality of the data it receives. It
cannot correct or improve data that is inherently inaccurate or incomplete.
Resource Intensity: The system may be resource-intensive, and its performance could be
limited by hardware and network constraints.
Scalability: The system might not easily handle a rapidly growing volume of data or
users without upgrades or adjustments.
Data Security: The system may not be able to prevent all forms of data breaches or
5
cyberattacks, and it's essential to follow best practices for security independently.
Data Availability: The system relies on data from external sources, and its functionality
can be limited by the availability and accessibility of this data. It cannot control data
availability from third-party sources.
Privacy Regulations: The system must comply with privacy regulations, which can limit
the scope of data collection and analysis, and may impact the system's performance.
User Engagement: The system can monitor social media data, but it cannot guarantee
user engagement or response, as it depends on user behaviors beyond its control.
Interoperability: The system may not seamlessly integrate with all social media
platforms or third-party tools, which can limit its reach and functionality.
Overview
6
Project Goal
The goal of this project is to develop and implement
a Result and Management System (RMS) to efficiently
manage and analyze data related to educational assessments
or corporate performance evaluations. The RMS will
streamline data processing, enhance data accuracy,
and provide valuable insights to improve decision-making.
Type of project
This project encompasses both Research and
Development (R&D) and Development phases.
The R&D phase involves researching and
identifying the best technologies, methodologies,
and tools for building the RMS. The Development
phase includes the actual design, coding,
and implementation of the RMS.
7
Project Success criteria
The success of the RMS project will be evaluated based on the following
criteria:
Data Security: The system should meet or exceed data security and privacy
standards, ensuring the protection of sensitive information.
Data Analysis and Insights: The system should provide valuable data analysis,
including sentiment analysis, to generate actionable insights for decision-
making.
Scalability: The RMS should be capable of handling increased data volume and
user load as the organization grows.
Compliance: Ensure the RMS complies with relevant regulations and standards,
such as educational assessment standards or data protection laws.
Risks of the Project:
Technical Risk:
High Risk: In the context of an RMS, high technical risk may be applicable
when implementing complex sentiment analysis algorithms for public
satisfaction assessment. These algorithms could be technically challenging, and
their successful integration may face significant obstacles.
Medium Risk: Medium technical risk could be seen in the integration with
various social media platforms. While it may not be as complex as advanced
sentiment analysis, it still requires technical effort and expertise to ensure
seamless data retrieval and analysis from these platforms.
Low Risk: Low technical risk may be associated with implementing basic data
collection and analysis functions, as these are typically more straightforward and
less technically challenging.
Timing Risk:
High Risk: High timing risk may apply to the RMS project if there are delays in
the research and development (R&D) phase, particularly in the technical research
stage. These delays could significantly extend the project timeline.
Medium Risk: Medium timing risk is relevant when customizing the system to
meet specific organizational needs. Addressing unforeseen technical issues and
ensuring a smooth integration process may take time and impact the project
schedule.
Low Risk: Low timing risk is present when the project has well-defined
development phases and effective project management practices in place, which
can help minimize the risk of significant delays.
9
Budget Risk:
High Risk: High budget risk may arise if the RMS project involves complex
Organization Details (if any)
Please provide the name and details (address, industry, type, etc.) of the
organization or institution where the RMS will be implemented. If your project
is affiliated with a specific organization, this information should be included.
10
Target End users
Target End Users: List the primary users and beneficiaries of the RMS:
Event Organizers: If the RMS is used for enhancing event attraction, event
organizers and attendees may be end users who benefit from features like lucky
draw and user-generated content printing.
The specific end users will depend on the project's scope and the organization's
or institution's needs where the RMS is implemented. Be sure to tailor the
project to the specific requirements of the end users for maximum effectiveness.
11
Development Technology/ Languages:
Implementation module for result creation
⦁ HTML File
⦁ CSS file
⦁ PHP file
System Architecture
Software Requirements:
Operating System: The system should be compatible with modern operating systems,
such as Windows, macOS, and various Linux distributions.
Web Server: You will need a web server software, such as Apache, Nginx, or Microsoft
IIS, to host the application.
12
Database Management System (DBMS): The system should support a relational
database management system, like MySQL, PostgreSQL, Oracle, or Microsoft SQL
Server, to store and manage data.
Programming Language: Specify the programming languages and frameworks used for
developing the system, such as Python, Ruby on Rails, PHP, or Java.
Frontend Technologies: Specify the frontend technologies, including HTML, CSS, and
JavaScript frameworks (e.g., React, Angular, or Vue.js) for creating the user interface.
Third-Party Libraries and APIs: If the system integrates with external services or
libraries (e.g., payment gateways, geolocation services), list these dependencies.
Version Control System: Specify the version control system (e.g., Git) used for source
code management.
Development and Testing Tools: Mention the development and testing tools, like IDEs,
testing frameworks, and debugging tools, used in the development process.
Hardware Requirements:
Server Hardware: Specify the server requirements, including CPU, RAM, and storage,
based on expected user load. Consider whether you'll use on-premises servers or cloud-
based hosting.
Client Devices: Indicate the minimum hardware requirements for end-user devices, such
as desktops, laptops, tablets, and mobile phones.
Printers and Scanners: If the system involves document generation or scanning, specify
compatible hardware devices.
Backup and Redundancy: Implement backup servers and data redundancy solutions to
ensure system availability and data integrity.
13
detection systems, and antivirus software.
Load Balancers: If needed, include load balancers to distribute traffic across multiple
servers for scalability and high availability.
Monitoring and Logging: Set up hardware for system monitoring and logging to track
performance, errors, and security events.
UPS (Uninterruptible Power Supply): Install UPS systems to prevent data loss in case of
power outages.
Environmental Controls: Ensure that the server room or data center has appropriate
temperature and humidity controls to protect hardware.
Reason: Design tools help create user-friendly and visually appealing interfaces.
Considerations: Collaboration with designers and a smooth design-to-
development workflow.
14
Server-Side Programming Language (e.g., Python, Java, PHP):
Reason: The choice depends on the development team's expertise and the system's
requirements.
Considerations: Compatibility with other technologies and available libraries.
Reason: APIs enable data exchange and integration with other systems.
Considera
tions: Ensure API security and documentation for third-party developers.
Version Control System (e.g., Git):
Additional Considerations:
Testing Tools:
Scalability Tools:
Consider tools for load balancing and resource scaling to handle increasing user
loads
.
Budget and Time Constraints:
Ensure that the chosen tools and technologies align with the available budget and
project timeline.
Implement security tools for data protection and ensure compliance with relevant
regulations.
Existing Tools:
Evaluate any existing tools within the organization to determine if they can be
integrated with the new system.
The specific choices may vary based on the organization's expertise, project
requirements, and constraints. It's essential to carefully evaluate these factors to
make informed decisions about the tools and technologies that will be used in the
development of the Examination and Result Management System.
Implementation Plan
Deliverable Items
1. Project Proposal:
16
A comprehensive document that outlines the project's objectives, scope, stakeholders, and
a high-level overview of the proposed system. It also includes a justification for the
project.
2. Software Requirement Specification (SRS):
A detailed document that describes the functional and non-functional requirements of the
system. It outlines what the system should do, its features, and how it should perform.
3. Design Documentation:
Detailed system architecture and design documents, including data models, system
flowcharts, and database schemas. This provides a blueprint for the system's
development.
4. Source Code and Program Listings:
The source code of both the front-end and back-end components of the Examination and
Result Management System. These listings are essential for future development,
maintenance, and troubleshooting.
5. Executable Files:
Compiled and executable files of the system, ready for deployment on the target server or
hosting environment. This includes the web application and server-side components.
6. Database Schema and Data Files:
The database schema and initial data files necessary to set up the database. This is crucial
for storing and managing examination and result data.
7. Program Documentation:
Comprehensive documentation for the codebase, including comments, code structure, and
explanations to assist developers in understanding and maintaining the code.
17
8. User Manual:
A user-friendly manual that guides end-users on how to use the Examination and Result
Management System. It should provide step-by-step instructions and screenshots for
common tasks.
9. Installation and Configuration Guide:
Instructions on how to install and configure the system on the target server or hosting
environment. This guide ensures a smooth setup process.
10. Testing and Quality Assurance Reports:
- Reports detailing the testing methodologies, test cases, and results, ensuring that the
system meets quality and performance standards.
18
- A final presentation summarizing the project's achievements, followed by
comprehensive project documentation, including all reports and deliverable items.
These deliverable items are essential for ensuring the successful development,
deployment, and ongoing maintenance of the Examination and Result Management
System. They provide a clear and structured approach to managing the project and
ensuring that all stakeholders have the necessary resources and documentation for a
smooth transition to the operational phase.
Millestones Chart
⦁ Gantt Chart
Functional Requirements
19
1) Subject Information ManagementThe system will maintain information about
various subjects being offered during different semesters of the course. The following
information would be maintained for each subject. Subject code, Subject Name, Subject
Type (Core / Elective /Lab1 / Lab2 / Mini Project) Semester, Credits.
System will maintain information about various students enrolled in the MCA course in
different years. The following information would be maintained for each student: Student
Enrollment No., Student Name, Year of Enrollment. The system will allow
creation/modification/deletion of new/existing students and also have the ability to list all
the students enrolled in a particular year.
The system will maintain information about choice of different Elective subjects opted by
various students of different enrollment years in different semesters. The following
information would be maintained:Student enrollment no, Semester, Student’s choices for
a particular semester.
The system will maintain information about marks obtained by various students of
different enrollment years in different semesters. The following information would be
maintained: Student enrollment no, semester, subject code, internal marks, external
marks,total marks and credits.The system will also have creation/modification/deletion of
marks information.
The system will generate mark-sheet for every student in different semesters.
6) Report Generation
20
For each year a report will be generated containing the list of students enrolled in that
batch year.
For each batch year a report will be generated containing the list of students and their
choices for Elective subject in the selected semester.
The system will maintain information about various users who will be able to
3.3Use Cases
21
5) Create/Delete User accounts
Classes / Objects :
1) Student
2) Subject
3) User
Usability:
The system should have an intuitive and user-friendly interface.
Users should be able to navigate and use the system with minimal training.
The system should support accessibility features to cater to a diverse user base.
Response times for user interactions (e.g., viewing results or scheduling exams) should be
within acceptable limits.
Reliability:
The system should be available 24/7, with minimal downtime for maintenance or
updates.
Data integrity should be maintained, and the system should have data backup and
recovery mechanisms in place.
It should be able to handle a high volume of concurrent users without crashing or
significant performance degradation.
22
Performance:
The system should respond quickly to user requests, such as loading exam results or
generating reports.
Response times for critical operations, like uploading exam scores, should meet specified
performance standards.
It should be able to scale horizontally to accommodate increased user load during peak
times, like exam result announcements.
Design Constraints:
The system should be designed to comply with relevant industry standards and best
practices.
Updates and patches should be deployed seamlessly without causing disruptions to the
end users.
Regular system monitoring and performance tuning should be in place to ensure
continued reliability and performance.
License Agreement:
The system should adhere to the terms of the software license agreement, ensuring
23
compliance with all legal and licensing requirements.
The system should protect intellectual property rights and data ownership, clearly
defining the rights and responsibilities of both the software provider and users.
These non-functional requirements will help guide the development and maintenance of
your examination and result management system, ensuring that it meets the necessary
standards and user expectations.
References
https://www.tutorialsdunya.com
https://www.tutorialsdunya.com
24
25