Aug Roving Audit

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 42

Auditor

S No Date Shift
Name /QA
Line Stage
1 1-Aug-23 A Vaithee BE-1 ALL Stage

2 1-Aug-23 A Vaithee BE-1 ALL Stage

3 1-Aug-23 A Vaithee BE-1 ALL Stage


4 1-Aug-23 A Vaithee BE-1 ALL Testing Stage
5 1-Aug-23 A BE-1
Divya BE PCBA VI & WO Assign
6 1-Aug-23 A BE-1
BOT Cover Incoming Inspection &
7 1-Aug-23 A BE-1 Assembly ,thermal pad pasting& RF
Divya nut fixing
PCBA Screwing and RF nut
8 1-Aug-23 B BE-1 Screwing
9 1-Aug-23 B BE-1
RF Nut screwing verification &
10 1-Aug-23 B Divya BE-1 Scanning
11 1-Aug-23 B BE-1
12 1-Aug-23 B Navaneethan BE-1
Voltage Parameter Test
13 1-Aug-23 B Navaneethan BE-1
14 1-Aug-23 B Navaneethan BE-1 Functional interface Test
Front cover Inspection &
15 1-Aug-23 B Navaneethan BE-1 Assembly ,Unit Label printing
and pasting
16 1-Aug-23 B Navaneethan BE-1
17 1-Aug-23 C Navaneethan BE-1
FVMI 3
18 1-Aug-23 C Vaithee BE-1
19 1-Aug-23 C Vaithee BE-1
20 1-Aug-23 C Vaithee BE-1 Top Cover Incoming
inspection ,Assembly and
21 1-Aug-23 C Vaithee BE-1 Screwing
22 2-Aug-23 A BE-1
Check Information Test
23 2-Aug-23 A Divya BE-1
24 2-Aug-23 A BE-1
25 2-Aug-23 A BE-1
EPG Test
26 2-Aug-23 A Divya BE-1
27 2-Aug-23 A BE-1
28 2-Aug-23 A BE-1
Master Reset Verify & Rubber
29 2-Aug-23 B Navaneethan BE-1 boot past
warranty ,Warning label , rubber boot
30 2-Aug-23 B Navaneethan BE-1 past & press
31 2-Aug-23 B Navaneethan BE-1 FVMI-4
32 2-Aug-23 B Navaneethan BE-1 Gift Box Preparation
33 2-Aug-23 B Navaneethan BE-1 PSU test
34 2-Aug-23 B Navaneethan BE-1 Check Pack
GB Void label and Transparent tape
35 2-Aug-23 B Navaneethan BE-1 paste stag
36 2-Aug-23 B Navaneethan BE-1
37 2-Aug-23 B Navaneethan BE-1 Master carton Packing
38 2-Aug-23 C Vaithee BE-1
39 2-Aug-23 C Vaithee BE-03 ALL Stage

40 2-Aug-23 C Vaithee BE-03 ALL Stage

41 2-Aug-23 C Vaithee BE-03 PCBA top housing


42 2-Aug-23 C Vaithee BE-03 Bottom cover assembly
43 3-Aug-23 A Vaithee BE-03 Interface test
44 3-Aug-23 A Divya BE-03 WIFI throughput
45 3-Aug-23 A Divya BE-03 Information compare
46 3-Aug-23 A Divya BE-03 USB upgrade
47 3-Aug-23 A Divya BE-03 Customer page inspection
48 3-Aug-23 A Divya BE-03 FVMI-4
49 3-Aug-23 A Divya BE-03 FVMI-4
50 3-Aug-23 B Navaneethan BE01 ALL Stage
51 3-Aug-23 B Navaneethan BE01 Voltage test
52 3-Aug-23 B Navaneethan BE01 Functional interface Test
53 3-Aug-23 B Navaneethan BE01 Functional interface Test
54 3-Aug-23 B Vaithee BE01 ALL Stage
55 3-Aug-23 B Vaithee CFC-01 Assign po stage
56 3-Aug-23 B Vaithee BE-01 Volatge parameter test
57 3-Aug-23 B Vaithee BE-01 PCBA storage area
58 3-Aug-23 B Vaithee BE-01 PCBA storage area
59 3-Aug-23 C Vaithee BE-01 Assign po stage

60 3-Aug-23 C Divya BE 01 EPG

61 3-Aug-23 C Divya BE 01 Voltage perameter


62 3-Aug-23 C Divya BE 01 PCBA Screwing stage
63 3-Aug-23 C Divya BE 01 CT test
64 4-Aug-23 A Navaneethan BE-02 All stage
65 4-Aug-23 A Navaneethan BE-02 EPG
66 4-Aug-23 A Navaneethan BE-02 EPG
67 4-Aug-23 A Navaneethan BE-02 EPG
68 4-Aug-23 A Navaneethan BE-02 EPG
69 4-Aug-23 A Vaithee BE-02 CT
70 4-Aug-23 A Vaithee BE-02 FVMI3
71 4-Aug-23 B Vaithee BE-02 FVMI3
72 4-Aug-23 B Vaithee BE-02 Unit label printing
73 4-Aug-23 B Vaithee BE-02 FIT
74 4-Aug-23 B Divya BE-02 All stage
75 4-Aug-23 B Divya BE-02 All stage
76 4-Aug-23 B Divya BE-02 FSR stage
77 4-Aug-23 B Divya BE-02 Voltage parameter
78 4-Aug-23 B Divya BE-02 FT
79 4-Aug-23 B Divya BE-02 Front cover assembly
80 4-Aug-23 C Divya BE-02 CT
81 4-Aug-23 C Navaneethan BE-02 EPG
82 4-Aug-23 C Navaneethan BE-02 Master reset
83 4-Aug-23 C Navaneethan BE-02 FVMI4
84 4-Aug-23 C Navaneethan BE-02 Voltage parameter
85 5-Aug-23 A Navaneethan BE-1 Line-1 back side
86 5-Aug-23 A Navaneethan BE-1 Line-1 back side
87 5-Aug-23 A Divya BE-1 Voltage perameter
88 5-Aug-23 A Divya BE-1 CT test
89 5-Aug-23 A Divya BE-3 Interface test
90 5-Aug-23 A Divya BE-3 USB upgrade stage
91 5-Aug-23 A Divya BE-3 Interface test
92 5-Aug-23 B Divya BE-1 EPG

93 5-Aug-23 B Navaneethan BE-1 check information

94 5-Aug-23 B Navaneethan BE-1 Voltage perameter


95 5-Aug-23 B Navaneethan BE-1 PCBA Screwing stage
96 5-Aug-23 B Navaneethan BE-3 FVMI-3 (AIRTEL)
97 5-Aug-23 B Navaneethan BE-3 FVMI-3 (AIRTEL)
98 5-Aug-23 B Vaithee BE01 ALL Stage
99 5-Aug-23 B Vaithee BE01 Unit label printing
100 5-Aug-23 B Vaithee CFC-01 Assign po stage
101 5-Aug-23 C Vaithee BE01 EPG stage
102 5-Aug-23 C Vaithee BE01 EPG stage
103 5-Aug-23 C Divya BE-1 Voltage perameter
104 5-Aug-23 C Divya BE-1 PCBA top housing
105 5-Aug-23 C Divya BE-3 Bottom cover assembly
106 7-Aug-23 A Divya BE-3 Interface test
107 7-Aug-23 A Divya BE-3 WIFI throughput
108 7-Aug-23 A Divya BE-1 Information compare

109 7-Aug-23 A Navaneethan BE-1 check information

110 7-Aug-23 A Navaneethan BE-1 Voltage perameter


111 7-Aug-23 A Navaneethan BE-1 PCBA Screwing stage
112 7-Aug-23 A Navaneethan BE-3 FVMI-3 (AIRTEL)
113 7-Aug-23 B Navaneethan BE-3 FVMI-3 (AIRTEL)
114 7-Aug-23 B Vaithee BE01 All stage
115 7-Aug-23 B Vaithee BE01 All stage
116 7-Aug-23 B Vaithee CFC-01 FSR stage
117 7-Aug-23 B Vaithee BE01 Voltage parameter
118 7-Aug-23 B Vaithee BE01 EPG stage
119 7-Aug-23 B Divya BE-1 Voltage perameter
120 7-Aug-23 B Divya BE-1 PCBA top housing
121 7-Aug-23 B Divya BE-3 Bottom cover assembly
122 7-Aug-23 C Divya BE-3 Interface test
123 7-Aug-23 C Divya BE-3 WIFI throughput
124 7-Aug-23 C Divya BE-1 Information compare
125 7-Aug-23 C Navaneethan BE-1 check information

126 7-Aug-23 C Navaneethan BE-1 Voltage perameter


127 8-Aug-23 A Navaneethan BE-1 PCBA Screwing stage
128 8-Aug-23 A Navaneethan BE-3 FVMI-3 (AIRTEL)
129 8-Aug-23 A Navaneethan BE-3 FVMI-3 (AIRTEL)
130 8-Aug-23 A Vaithee BE-1 Voltage perameter
131 8-Aug-23 A Vaithee BE-1 PCBA top housing
132 8-Aug-23 A Vaithee BE-3 Bottom cover assembly
133 8-Aug-23 A Vaithee BE-3 Interface test
134 8-Aug-23 B Vaithee BE-3 WIFI throughput
135 8-Aug-23 B Divya BE-1 Voltage perameter
136 8-Aug-23 B Divya BE-1 PCBA top housing
137 8-Aug-23 B Divya BE-3 Bottom cover assembly
138 8-Aug-23 B Divya BE-3 Interface test
139 8-Aug-23 B Divya BE-3 WIFI throughput
140 8-Aug-23 B Divya BE-1 Information compare

141 8-Aug-23 B Navaneethan BE-1 check information

142 8-Aug-23 B Navaneethan BE-1 Voltage perameter


143 8-Aug-23 C Navaneethan BE-1 PCBA Screwing stage
144 8-Aug-23 C Navaneethan BE-3 FVMI-3 (AIRTEL)
145 8-Aug-23 C Navaneethan BE-3 FVMI-3 (AIRTEL)
146 8-Aug-23 C Vaithee BE01 All stage
147 8-Aug-23 C Vaithee BE01 All stage
148 9-Aug-23 A Vaithee CFC-01 FSR stage
149 9-Aug-23 A Vaithee BE01 Voltage parameter
150 9-Aug-23 A Vaithee BE01 EPG stage
151 9-Aug-23 A Divya BE-1 Voltage perameter
152 9-Aug-23 A Divya BE-1 PCBA top housing
153 9-Aug-23 A Divya BE-3 Bottom cover assembly
154 9-Aug-23 A Divya BE-3 Interface test
155 9-Aug-23 B Divya BE-3 WIFI throughput
156 9-Aug-23 B Divya BE-1 Information compare

157 9-Aug-23 B Navaneethan BE-1 check information

158 9-Aug-23 B Navaneethan BE-1 Voltage perameter


159 9-Aug-23 B Navaneethan BE-1 PCBA Screwing stage
160 9-Aug-23 B Navaneethan BE-3 FVMI-3 (AIRTEL)
161 9-Aug-23 B Navaneethan BE-3 FVMI-3 (AIRTEL)
162 9-Aug-23 B Vaithee BE01 All stage
163 9-Aug-23 B Vaithee BE01 All stage
164 9-Aug-23 C Vaithee CFC-01 FSR stage
165 9-Aug-23 C Vaithee BE01 Voltage parameter
166 9-Aug-23 C Vaithee BE01 EPG stage
167 9-Aug-23 C Divya BE-1 Voltage perameter
168 9-Aug-23 C Divya BE-1 PCBA top housing
169 10-Aug-23 A Divya BE-3 Bottom cover assembly
170 10-Aug-23 A Divya BE-3 Interface test
171 10-Aug-23 A Divya BE-3 WIFI throughput
172 10-Aug-23 A Divya BE-1 Information compare

173 10-Aug-23 A Navaneethan BE-1 check information

174 10-Aug-23 A Navaneethan BE-1 Voltage perameter


175 10-Aug-23 A Navaneethan BE-1 PCBA Screwing stage
176 10-Aug-23 B Navaneethan BE-3 FVMI-3 (AIRTEL)
177 10-Aug-23 B Navaneethan BE-3 FVMI-3 (AIRTEL)
178 10-Aug-23 B Vaithee BE01 All stage
179 10-Aug-23 B Vaithee BE01 All stage
180 10-Aug-23 B Vaithee CFC-01 FSR stage
181 10-Aug-23 B Vaithee BE01 Voltage parameter
182 10-Aug-23 B Vaithee BE01 EPG stage
183 10-Aug-23 B Navaneethan BE-1 Voltage perameter
184 10-Aug-23 B Navaneethan BE-1 PCBA top housing
185 10-Aug-23 C Navaneethan BE-3 Bottom cover assembly
186 10-Aug-23 C Navaneethan BE-3 Interface test
187 10-Aug-23 C Navaneethan BE-3 WIFI throughput
188 10-Aug-23 C Navaneethan BE-1 Information compare

189 10-Aug-23 C Vaithee BE-1 check information

190 11-Aug-23 A Vaithee BE-1 Voltage perameter


191 11-Aug-23 A Vaithee BE-1 PCBA Screwing stage
192 11-Aug-23 A Vaithee BE-3 FVMI-3 (AIRTEL)
193 11-Aug-23 A Vaithee BE-3 FVMI-3 (AIRTEL)
194 11-Aug-23 A Divya BE01 All stage
195 11-Aug-23 A Divya BE01 All stage
196 11-Aug-23 A Divya CFC-01 FSR stage
197 11-Aug-23 B Divya BE01 Voltage parameter
198 11-Aug-23 B Divya BE01 EPG stage
199 11-Aug-23 B Navaneethan BE-1 Voltage perameter
200 11-Aug-23 B Navaneethan BE-1 PCBA top housing
201 11-Aug-23 B Navaneethan BE-3 Bottom cover assembly
202 11-Aug-23 B Navaneethan BE-3 Interface test
203 11-Aug-23 B Navaneethan BE-3 WIFI throughput
204 11-Aug-23 B Navaneethan BE-1 Information compare
205 11-Aug-23 B Vaithee BE-1 check information

206 11-Aug-23 C Vaithee BE-1 Voltage perameter


207 11-Aug-23 C Vaithee BE-1 PCBA Screwing stage
208 11-Aug-23 C Vaithee BE-3 FVMI-3 (AIRTEL)
209 11-Aug-23 C Vaithee BE-3 FVMI-3 (AIRTEL)
210 11-Aug-23 C Divya BE01 All stage
211 12-Aug-23 A Divya BE01 All stage
212 12-Aug-23 A Divya CFC-01 FSR stage
213 12-Aug-23 A Divya BE01 Voltage parameter
214 12-Aug-23 A Divya BE01 EPG stage
215 12-Aug-23 A Navaneethan BE-1 Voltage perameter
216 12-Aug-23 A Navaneethan BE-1 PCBA top housing
217 12-Aug-23 A Navaneethan BE-3 Bottom cover assembly
218 12-Aug-23 B Navaneethan BE-3 Interface test
219 12-Aug-23 B Navaneethan BE-3 WIFI throughput
220 12-Aug-23 B Navaneethan BE-1 Information compare

221 12-Aug-23 B Vaithee BE-1 check information

222 12-Aug-23 B Vaithee BE-1 Voltage perameter


223 12-Aug-23 B Vaithee BE-1 PCBA Screwing stage
224 12-Aug-23 B Vaithee BE-3 FVMI-3 (AIRTEL)
225 12-Aug-23 B Vaithee BE-3 FVMI-3 (AIRTEL)
226 12-Aug-23 B Divya BE01 All stage
227 12-Aug-23 C Divya BE01 All stage
228 12-Aug-23 C Divya CFC-01 FSR stage
229 12-Aug-23 C Divya BE01 Voltage parameter
230 12-Aug-23 C Divya BE01 EPG stage
231 12-Aug-23 C Navaneethan BE-1 Voltage perameter
232 14-Aug-23 A Navaneethan BE-1 PCBA top housing
233 14-Aug-23 A Navaneethan BE-3 Bottom cover assembly
234 14-Aug-23 A Navaneethan BE-3 Interface test
235 14-Aug-23 A Navaneethan BE-3 WIFI throughput
236 14-Aug-23 A Navaneethan BE-1 Information compare

237 14-Aug-23 A Vaithee BE-1 check information

238 14-Aug-23 A Vaithee BE-1 Voltage perameter


239 14-Aug-23 B Vaithee BE-1 PCBA Screwing stage
240 14-Aug-23 B Vaithee BE-3 FVMI-3 (AIRTEL)
241 14-Aug-23 B Vaithee BE-3 FVMI-3 (AIRTEL)
242 14-Aug-23 B Divya BE01 All stage
243 14-Aug-23 B Divya BE01 All stage
244 14-Aug-23 B Divya CFC-01 FSR stage
245 14-Aug-23 B Divya BE01 Voltage parameter
246 14-Aug-23 B Divya BE01 EPG stage
247 14-Aug-23 B Navaneethan BE-1 Voltage perameter
248 14-Aug-23 C Navaneethan BE-1 PCBA top housing
249 14-Aug-23 C Navaneethan BE-3 Bottom cover assembly
250 14-Aug-23 C Navaneethan BE-3 Interface test
251 14-Aug-23 C Navaneethan BE-3 WIFI throughput
252 14-Aug-23 C Navaneethan BE-1 Information compare

253 15-Aug-23 A Vaithee BE-1 check information

254 15-Aug-23 A Vaithee BE-1 Voltage perameter


255 15-Aug-23 A Vaithee BE-1 PCBA Screwing stage
256 15-Aug-23 A Vaithee BE-3 FVMI-3 (AIRTEL)
257 15-Aug-23 A Vaithee BE-3 FVMI-3 (AIRTEL)
258 15-Aug-23 A Divya BE01 All stage
259 15-Aug-23 A Divya BE01 All stage
260 15-Aug-23 B Divya CFC-01 FSR stage
261 15-Aug-23 B Divya BE01 Voltage parameter
262 15-Aug-23 B Divya BE01 EPG stage
263 15-Aug-23 B Navaneethan BE-1 Voltage perameter
264 15-Aug-23 B Navaneethan BE-1 PCBA top housing
265 15-Aug-23 B Navaneethan BE-3 Bottom cover assembly
266 15-Aug-23 B Navaneethan BE-3 Interface test
267 15-Aug-23 B Navaneethan BE-3 WIFI throughput
268 15-Aug-23 B Navaneethan BE-1 Information compare

269 15-Aug-23 C Vaithee BE-1 check information

270 15-Aug-23 C Vaithee BE-1 Voltage perameter


271 15-Aug-23 C Vaithee BE-1 PCBA Screwing stage
272 15-Aug-23 C Vaithee BE-3 FVMI-3 (AIRTEL)
273 15-Aug-23 C Vaithee BE-3 FVMI-3 (AIRTEL)
274 16-Aug-23 A Divya BE01 All stage
275 16-Aug-23 A Divya BE01 All stage
276 16-Aug-23 A Divya CFC-01 FSR stage
277 16-Aug-23 A Divya BE01 Voltage parameter
278 16-Aug-23 A Divya BE01 EPG stage
279 16-Aug-23 A Vaithee BE-1 PCBA top housing
280 16-Aug-23 A Vaithee BE-3 Bottom cover assembly
281 16-Aug-23 B Vaithee BE-3 Interface test
282 16-Aug-23 B Vaithee BE-3 WIFI throughput
283 16-Aug-23 B Vaithee BE-1 Information compare
284 16-Aug-23 B Vaithee BE01 All stage
285 16-Aug-23 B Divya BE01 All stage
286 16-Aug-23 B Divya CFC-01 FSR stage
287 16-Aug-23 B Divya BE01 Voltage parameter
288 16-Aug-23 B Divya BE01 EPG stage
289 16-Aug-23 B Divya BE-1 Voltage perameter
290 16-Aug-23 C Navaneethan BE-1 PCBA Screwing stage
291 16-Aug-23 C Navaneethan BE-3 FVMI-3 (AIRTEL)
292 16-Aug-23 C Navaneethan BE-3 FVMI-3 (AIRTEL)
293 16-Aug-23 C Navaneethan BE01 All stage
294 16-Aug-23 C Navaneethan BE01 All stage
295 17-Aug-23 A Vaithee BE-1 PCBA top housing
296 17-Aug-23 A Vaithee BE-3 Bottom cover assembly
297 17-Aug-23 A Vaithee BE-3 Interface test
298 17-Aug-23 A Vaithee BE-3 WIFI throughput
299 17-Aug-23 A Vaithee BE-1 Information compare
300 17-Aug-23 A Vaithee BE01 All stage
301 17-Aug-23 A Divya BE01 All stage
302 17-Aug-23 B Divya CFC-01 FSR stage
303 17-Aug-23 B Divya BE01 Voltage parameter
304 17-Aug-23 B Divya BE01 EPG stage
305 17-Aug-23 B Divya BE-1 Voltage perameter
306 17-Aug-23 B Navaneethan BE-1 PCBA Screwing stage
307 17-Aug-23 B Navaneethan BE-3 FVMI-3 (AIRTEL)
308 17-Aug-23 B Navaneethan BE-3 FVMI-3 (AIRTEL)
309 17-Aug-23 B Navaneethan BE01 All stage
310 17-Aug-23 B Navaneethan BE01 All stage
311 17-Aug-23 C Vaithee BE-1 PCBA top housing
312 17-Aug-23 C Vaithee BE-3 Bottom cover assembly
313 17-Aug-23 C Vaithee BE-3 Interface test
314 17-Aug-23 C Vaithee BE-3 WIFI throughput
315 17-Aug-23 C Vaithee BE-1 Information compare
316 18-Aug-23 A Vaithee BE01 All stage
317 18-Aug-23 A Divya BE01 All stage
318 18-Aug-23 A Divya CFC-01 FSR stage
319 18-Aug-23 A Divya BE01 Voltage parameter
320 18-Aug-23 A Divya BE01 EPG stage
321 18-Aug-23 A Divya BE-1 Voltage perameter
322 18-Aug-23 A Navaneethan BE-1 PCBA Screwing stage
323 18-Aug-23 B Navaneethan BE-3 FVMI-3 (AIRTEL)
324 18-Aug-23 B Navaneethan BE-3 FVMI-3 (AIRTEL)
325 18-Aug-23 B Navaneethan BE01 All stage
326 18-Aug-23 B Navaneethan BE01 All stage
327 18-Aug-23 B Vaithee BE-1 PCBA top housing
328 18-Aug-23 B Vaithee BE-3 Bottom cover assembly
329 18-Aug-23 B Vaithee BE-3 Interface test
330 18-Aug-23 B Vaithee BE-3 WIFI throughput
331 18-Aug-23 B Vaithee BE-1 Information compare
332 18-Aug-23 C Vaithee BE01 All stage
333 18-Aug-23 C Divya BE01 All stage
334 18-Aug-23 C Divya CFC-01 FSR stage
335 18-Aug-23 C Divya BE01 Voltage parameter
336 18-Aug-23 C Divya BE01 EPG stage
337 19-Aug-23 A Divya BE-1 Voltage perameter
338 19-Aug-23 A Navaneethan BE-1 PCBA Screwing stage
339 19-Aug-23 A Navaneethan BE-3 FVMI-3 (AIRTEL)
340 19-Aug-23 A Navaneethan BE-3 FVMI-3 (AIRTEL)
341 19-Aug-23 A Navaneethan BE01 All stage
342 19-Aug-23 A Navaneethan BE01 All stage
343 19-Aug-23 A Vaithee BE-1 PCBA top housing
344 19-Aug-23 B Vaithee BE-3 Bottom cover assembly
345 19-Aug-23 B Vaithee BE-3 Interface test
346 19-Aug-23 B Vaithee BE-3 WIFI throughput
347 19-Aug-23 B Vaithee BE-1 Information compare
348 19-Aug-23 B Vaithee BE01 All stage
349 19-Aug-23 B Divya BE01 All stage
350 19-Aug-23 B Divya CFC-01 FSR stage
351 19-Aug-23 B Divya BE01 Voltage parameter
352 19-Aug-23 B Divya BE01 EPG stage
353 19-Aug-23 C Divya BE-1 Voltage perameter
354 19-Aug-23 C Navaneethan BE-1 PCBA Screwing stage
355 19-Aug-23 C Navaneethan BE-3 FVMI-3 (AIRTEL)
356 19-Aug-23 C Navaneethan BE-3 FVMI-3 (AIRTEL)
357 19-Aug-23 C Navaneethan BE01 All stage
358 21-Aug-23 A Navaneethan BE01 All stage
359 21-Aug-23 A Vaithee BE-1 PCBA top housing
360 21-Aug-23 A Vaithee BE-3 Bottom cover assembly
361 21-Aug-23 A Vaithee BE-3 Interface test
362 21-Aug-23 A Vaithee BE-3 WIFI throughput
363 21-Aug-23 A Vaithee BE-1 Information compare
364 21-Aug-23 A Vaithee BE01 All stage
365 21-Aug-23 B Divya BE01 All stage
366 21-Aug-23 B Divya CFC-01 FSR stage
367 21-Aug-23 B Divya BE01 Voltage parameter
368 21-Aug-23 B Divya BE01 EPG stage
369 21-Aug-23 B Divya BE-1 Voltage perameter
370 21-Aug-23 B Navaneethan BE-1 PCBA Screwing stage
371 21-Aug-23 B Navaneethan BE-3 FVMI-3 (AIRTEL)
372 21-Aug-23 B Navaneethan BE-3 FVMI-3 (AIRTEL)
373 21-Aug-23 B Navaneethan BE01 All stage
374 21-Aug-23 C Navaneethan BE01 All stage
375 21-Aug-23 C Divya BE-1 check information

376 21-Aug-23 C Divya BE-1 Voltage perameter


377 21-Aug-23 C Divya BE-1 PCBA Screwing stage
378 21-Aug-23 C Divya BE-3 FVMI-3 (AIRTEL)
379 22-Aug-23 A Divya BE-3 FVMI-3 (AIRTEL)
380 22-Aug-23 A Divya BE-1 Voltage perameter
381 22-Aug-23 A Navaneethan BE-1 PCBA top housing
382 22-Aug-23 A Navaneethan BE-3 Bottom cover assembly
383 22-Aug-23 A Navaneethan BE-3 Interface test
384 22-Aug-23 A Navaneethan BE-3 WIFI throughput
385 22-Aug-23 A Navaneethan BE-1 Voltage perameter
386 22-Aug-23 B Vaithee BE-1 PCBA top housing
387 22-Aug-23 B Vaithee BE-3 Bottom cover assembly
388 22-Aug-23 B Vaithee BE-3 Interface test
389 22-Aug-23 B Vaithee BE-3 WIFI throughput
390 22-Aug-23 B Vaithee BE-1 Information compare

391 22-Aug-23 B Divya BE-1 check information

392 22-Aug-23 B Divya BE-1 Voltage perameter


393 22-Aug-23 B Divya BE-1 PCBA Screwing stage
394 22-Aug-23 B Divya BE-3 FVMI-3 (AIRTEL)
395 22-Aug-23 C Divya BE-3 FVMI-3 (AIRTEL)
396 22-Aug-23 C Divya BE01 All stage
397 22-Aug-23 C Navaneethan BE01 All stage
398 22-Aug-23 C Navaneethan CFC-01 FSR stage
399 22-Aug-23 C Navaneethan BE01 Voltage parameter
400 23-Aug-23 A Navaneethan BE01 EPG stage
401 23-Aug-23 A Navaneethan BE-1 Voltage perameter
402 23-Aug-23 A Vaithee BE-1 PCBA top housing
403 23-Aug-23 A Vaithee BE-3 Bottom cover assembly
404 23-Aug-23 A Vaithee BE-3 Interface test
405 23-Aug-23 A Vaithee BE-3 WIFI throughput
406 23-Aug-23 A Vaithee BE-1 Information compare

407 23-Aug-23 B Divya BE-1 check information

408 23-Aug-23 B Divya BE-1 Voltage perameter


409 23-Aug-23 B Divya BE-1 PCBA Screwing stage
410 23-Aug-23 B Divya BE-3 FVMI-3 (AIRTEL)
411 23-Aug-23 B Divya BE-3 FVMI-3 (AIRTEL)
412 23-Aug-23 B Divya BE01 All stage
413 23-Aug-23 B Navaneethan BE01 All stage
414 23-Aug-23 B Navaneethan CFC-01 FSR stage
415 23-Aug-23 B Navaneethan BE01 Voltage parameter
416 23-Aug-23 C Navaneethan BE01 EPG stage
417 23-Aug-23 C Navaneethan BE-1 Voltage perameter
418 23-Aug-23 C Vaithee BE-1 PCBA top housing
419 23-Aug-23 C Vaithee BE-3 Bottom cover assembly
420 23-Aug-23 C Vaithee BE-3 Interface test
421 24-Aug-23 A Vaithee BE-3 WIFI throughput
422 24-Aug-23 A Vaithee BE-1 Information compare

423 24-Aug-23 A Divya BE-1 check information

424 24-Aug-23 A Divya BE-1 Voltage perameter


425 24-Aug-23 A Divya BE-1 PCBA Screwing stage
426 24-Aug-23 A Divya BE-3 FVMI-3 (AIRTEL)
427 24-Aug-23 A Divya BE-3 FVMI-3 (AIRTEL)
428 24-Aug-23 B Divya BE01 All stage
429 24-Aug-23 B Navaneethan BE01 All stage
430 24-Aug-23 B Navaneethan CFC-01 FSR stage
431 24-Aug-23 B Navaneethan BE01 Voltage parameter
432 24-Aug-23 B Navaneethan BE01 EPG stage
433 24-Aug-23 B Navaneethan BE-1 Voltage perameter
434 24-Aug-23 B Vaithee BE-1 PCBA top housing
435 24-Aug-23 B Vaithee BE-3 Bottom cover assembly
436 24-Aug-23 B Vaithee BE-3 Interface test
437 24-Aug-23 C Vaithee BE-3 WIFI throughput
438 24-Aug-23 C Vaithee BE-1 Information compare
439 24-Aug-23 C Divya BE01 All stage
440 24-Aug-23 C Divya BE01 All stage
441 24-Aug-23 C Divya CFC-01 FSR stage
442 25-Aug-23 A Divya BE01 Voltage parameter
443 25-Aug-23 A Divya BE01 EPG stage
444 25-Aug-23 A Divya BE-1 Voltage perameter
445 25-Aug-23 A Navaneethan BE-1 PCBA top housing
446 25-Aug-23 A Navaneethan BE-3 Bottom cover assembly
447 25-Aug-23 A Navaneethan BE-3 Interface test
448 25-Aug-23 A Navaneethan BE-3 WIFI throughput
449 25-Aug-23 B Navaneethan BE-1 Information compare

450 25-Aug-23 B Vaithee BE-1 check information

451 25-Aug-23 B Vaithee BE-1 Voltage perameter


452 25-Aug-23 B Vaithee BE-1 PCBA Screwing stage
453 25-Aug-23 B Vaithee BE-3 FVMI-3 (AIRTEL)
454 25-Aug-23 B Vaithee BE-3 FVMI-3 (AIRTEL)
455 25-Aug-23 B Divya BE01 All stage
456 25-Aug-23 B Divya BE01 All stage
457 25-Aug-23 B Divya BE-1 check information

458 25-Aug-23 C Divya BE-1 Voltage perameter


459 25-Aug-23 C Divya BE-1 PCBA Screwing stage
460 25-Aug-23 C Divya BE-1 Voltage perameter
461 25-Aug-23 C Navaneethan BE-1 PCBA top housing
462 25-Aug-23 C Navaneethan BE-3 Bottom cover assembly
463 26-Aug-23 A Navaneethan BE-3 Interface test
464 26-Aug-23 A Navaneethan BE-3 WIFI throughput
465 26-Aug-23 A Navaneethan BE-1 Information compare

466 26-Aug-23 A Vaithee BE-1 Voltage perameter


467 26-Aug-23 A Vaithee BE-1 PCBA Screwing stage
468 26-Aug-23 A Vaithee BE-3 FVMI-3 (AIRTEL)
469 26-Aug-23 A Vaithee BE-3 FVMI-3 (AIRTEL)
470 26-Aug-23 B Vaithee BE01 All stage
471 26-Aug-23 B Navaneethan BE-1 Voltage perameter
472 26-Aug-23 B Navaneethan BE-1 PCBA Screwing stage
473 26-Aug-23 B Navaneethan BE-1 Voltage perameter
474 26-Aug-23 B Navaneethan BE-1 PCBA top housing
475 26-Aug-23 B Navaneethan BE-3 Bottom cover assembly
476 26-Aug-23 B Navaneethan BE-3 Interface test
477 26-Aug-23 B Vaithee BE-3 WIFI throughput
478 26-Aug-23 B Vaithee BE-1 Information compare
479 26-Aug-23 C Vaithee BE-3 interface test
480 26-Aug-23 C Vaithee BE-3 interface test
481 26-Aug-23 C Vaithee BE-3 Unit label pasting
482 26-Aug-23 C Divya BE-3 Unit label pasting
483 26-Aug-23 C Divya BE-1 Voltage perameter
484 28-Aug-23 A Divya BE-1 PCBA top housing
485 28-Aug-23 A Divya BE-3 Bottom cover assembly
486 28-Aug-23 A Divya BE-3 Interface test
487 28-Aug-23 A Navaneethan BE-3 WIFI throughput
488 28-Aug-23 A Navaneethan BE-1 Information compare
489 28-Aug-23 A Navaneethan BE01 All stage
490 28-Aug-23 A Navaneethan BE01 All stage
491 28-Aug-23 B Navaneethan CFC-01 FSR stage
492 28-Aug-23 B Navaneethan BE01 Voltage parameter
493 28-Aug-23 B Vaithee BE01 EPG stage
494 28-Aug-23 B Vaithee BE-1 Voltage perameter
495 28-Aug-23 B Vaithee BE-1 PCBA top housing
496 28-Aug-23 B Vaithee BE-3 Bottom cover assembly
497 28-Aug-23 B Vaithee BE-3 Interface test
498 28-Aug-23 B Divya BE-3 WIFI throughput
499 28-Aug-23 B Divya BE-1 Information compare

500 28-Aug-23 C Divya BE-1 check information

501 28-Aug-23 C Divya BE-1 Voltage perameter


502 28-Aug-23 C Divya BE-1 PCBA Screwing stage
503 28-Aug-23 C Navaneethan BE-3 FVMI-3 (AIRTEL)
504 28-Aug-23 C Navaneethan BE-3 FVMI-3 (AIRTEL)
505 29-Aug-23 A Navaneethan BE01 All stage
506 29-Aug-23 A Navaneethan BE01 All stage
507 29-Aug-23 A Navaneethan BE-1 check information

508 29-Aug-23 A Navaneethan BE-1 Voltage perameter


509 29-Aug-23 A Vaithee BE-1 PCBA Screwing stage
510 29-Aug-23 A Vaithee BE-3 FVMI-3 (AIRTEL)
511 29-Aug-23 A Vaithee BE-3 FVMI-3 (AIRTEL)
512 29-Aug-23 B Vaithee BE01 All stage
513 29-Aug-23 B Vaithee BE-1 Voltage perameter
514 29-Aug-23 B Divya BE-1 PCBA Screwing stage
515 29-Aug-23 B Divya BE-1 Voltage perameter
516 29-Aug-23 B Divya BE-1 PCBA top housing
517 29-Aug-23 B Divya BE-3 Bottom cover assembly
518 29-Aug-23 B Divya BE-3 Interface test
519 29-Aug-23 B Navaneethan BE-3 WIFI throughput
520 29-Aug-23 B Navaneethan BE-1 Information compare
521 29-Aug-23 C Navaneethan BE-3 interface test
522 29-Aug-23 C Navaneethan BE-3 interface test
523 29-Aug-23 C Navaneethan BE-3 Unit label pasting
524 29-Aug-23 C Navaneethan BE-3 Unit label pasting
525 29-Aug-23 C Vaithee BE-1 Voltage perameter
526 30-Aug-23 A Vaithee BE-1 PCBA top housing
527 30-Aug-23 A Vaithee BE-3 Bottom cover assembly
528 30-Aug-23 A Vaithee BE-3 Interface test
529 30-Aug-23 A Vaithee BE-3 WIFI throughput
530 30-Aug-23 A Divya BE-1 Information compare
531 30-Aug-23 A Divya BE01 All stage
532 30-Aug-23 A Divya BE01 All stage
533 30-Aug-23 B Divya CFC-01 FSR stage
534 30-Aug-23 B Divya BE01 Voltage parameter
535 30-Aug-23 B Navaneethan BE01 EPG stage
536 30-Aug-23 B Navaneethan BE-1 Voltage perameter
537 30-Aug-23 B Navaneethan BE-1 PCBA top housing
538 30-Aug-23 B Navaneethan BE-3 Bottom cover assembly
539 30-Aug-23 B Navaneethan BE-3 Interface test
540 30-Aug-23 B Navaneethan BE-3 WIFI throughput
541 30-Aug-23 B Vaithee BE-1 Information compare

542 30-Aug-23 C Vaithee BE-1 check information


543 30-Aug-23 C Vaithee BE-1 Voltage perameter
544 30-Aug-23 C Vaithee BE-1 PCBA top housing
545 30-Aug-23 C Vaithee BE-3 Bottom cover assembly
546 30-Aug-23 C Divya BE-3 Interface test
547 31-Aug-23 A Divya BE-1 PCBA top housing
548 31-Aug-23 A Divya BE-3 Bottom cover assembly
549 31-Aug-23 A Divya BE-3 Interface test
550 31-Aug-23 A Navaneethan BE-3 WIFI throughput
551 31-Aug-23 A Navaneethan BE-1 Information compare
552 31-Aug-23 A Navaneethan BE01 All stage
553 31-Aug-23 A Navaneethan BE01 All stage
554 31-Aug-23 B Navaneethan CFC-01 FSR stage
555 31-Aug-23 B Navaneethan BE01 Voltage parameter
556 31-Aug-23 B Vaithee BE01 EPG stage
557 31-Aug-23 B Vaithee BE-1 Voltage perameter
558 31-Aug-23 B Vaithee BE-1 PCBA top housing
559 31-Aug-23 B Vaithee BE-3 Bottom cover assembly
560 31-Aug-23 B Vaithee BE-3 Interface test
561 31-Aug-23 B Divya BE-3 WIFI throughput
562 31-Aug-23 B Divya BE-1 Information compare

563 31-Aug-23 C Divya BE-1 check information

564 31-Aug-23 C Divya BE-1 Voltage perameter


565 31-Aug-23 C Divya BE-1 PCBA Screwing stage
566 31-Aug-23 C Navaneethan BE-3 FVMI-3 (AIRTEL)
567 31-Aug-23 C Navaneethan BE-3 FVMI-3 (AIRTEL)
Audit points
5S Need to improve
Need to Correct In WI ( Display position)

Need to Display the check sheet & update .


Jig Sharp Edge coverege Need to improve
PCBA Trolly Missing
Scanner Not available

CGM Working on abnormal condition

Ionizer Fan ground connection Missing


Jig Top Side foam Sheet damage
scanner stand Not available
CGM Working on abnormal condition
Mouse pad damage
CPU Door open ( Fixture Number 1A)
CGM Working on abnormal condition

Mouse pad damage

Stage identification wrong


scanner stand Not available
Unit LED Fixture slot more play & Need to Cover the ESD Sheet
CGM Working on abnormal condition
screwing JIG Not fixed due to Having Movable condition
screw Part Number identification Missing
CPU More sticker pasted
JIG (fixture ) 1B Supporting pin screw Missing
Mouse pad damage
JIG ( Fixture -1D ) 1) AV Port spring Missing
2) RF Port screw & spring Missing
JIG ( Fixture -3 (1B ) screw & spring Missing
JIG ( Fixture -5 (2D ) PM Date Over Writing
Fixture -08 CGM Not Working
scanner stand Not available

Part Number Identification Not available


ESD Mat Damage
NCMR Identification damage
CGM Not available
Part Number Identification Not available
Part Number Identification Not available
Part Number Identification Not available
sharp edge conveyor not closed
Mouse pad damage
5S not done
Unwanted material kept in line and also HSM15 model units stored in this line
CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Jig 2C, 2A – Grounding not done
Jig 6&7 -Grounding not done
Mouse not available
Mouse not available
CGM mal function error
5S not done
Fixture -04 CGM Not Working
Improper routing
big size bin used instead of small size bin
Daily maintaince check sheet not followed properly
more no of bins are kept in assign po stage
Updated WI not displayed
Bins are not properly closed
More dust accumulated in PCBA storage bin
Identification not available for PCBA movement trolley
Extra adaptor stored in EPG stage

Un wanted empty bins stored in Voltage perameter test stage

other model(HY00A)unit storage in below location


Rejection units not kept in rejection rack
5S not done.Dust accumuated
PM due date sticker not available in EPG station 1,2,3
ESD mat not available in EPG station (1& 5)
ESD foam not pasted on EPG station 1 test fixture
Tester grounding not available in EPG 5 station
Tester grounding not available
PC not available
Power cable not given for checking LED alignment
Printer PM due date expired
Tester grounding not available
5S check check,Daily PM check sheet need to display
Updated WI need to display
Magnifier in damage condition
Station 3,4 CGM not working
Station 1,2 CGM not working
CGM not working
Station 1,2 CGM not working
Station 1,2 ,3,5 CGM not working
CGM not working
CGM not working
Improper routing
Inproper cable routing
Inproper cable routing
Testing fixture equpiments connection open condition
Rejection units not kept in rejection rack
CI card spare storage tray unwanted materials stored
CI card spare storage tray unwanted materials stored
Testing fixture equpiments connection open condition
Extra adaptor stored in EPG stage

Extra adaptor stored in CT stage

Un wanted empty bins stored in Voltage perameter test stage

other model(HY00A)unit storage in below location


Inproper cable routing (open condition )
thermal pad material not stored in allocated location

5S not done
PM due date expired
PM due date expired
Grounding not available for Fixture 03
Failure unit not move to debug in ontime
Testing fixture equpiments connection open condition
CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Jig 2C, 2A – Grounding not done
Extra adaptor stored in CT stage

Un wanted empty bins stored in Voltage perameter test stage

other model(HY00A)unit storage in below location


Inproper cable routing (open condition )
thermal pad material not stored in allocated location

5S check check,Daily PM check sheet need to display


Updated WI need to display
Magnifier in damage condition
Station 3,4 CGM not working
Failure unit not move to debug in ontime
Testing fixture equpiments connection open condition
CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Jig 2C, 2A – Grounding not done
Extra adaptor stored in CT stage

Un wanted empty bins stored in Voltage perameter test stage

other model(HY00A)unit storage in below location


Inproper cable routing (open condition )
thermal pad material not stored in allocated location

Testing fixture equpiments connection open condition


CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Testing fixture equpiments connection open condition
CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Jig 2C, 2A – Grounding not done
Extra adaptor stored in CT stage

Un wanted empty bins stored in Voltage perameter test stage

other model(HY00A)unit storage in below location


Inproper cable routing (open condition )
thermal pad material not stored in allocated location

5S check check,Daily PM check sheet need to display


Updated WI need to display
Magnifier in damage condition
Station 3,4 CGM not working
Failure unit not move to debug in ontime
Testing fixture equpiments connection open condition
CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Jig 2C, 2A – Grounding not done
Extra adaptor stored in CT stage

Un wanted empty bins stored in Voltage perameter test stage

other model(HY00A)unit storage in below location


Inproper cable routing (open condition )
thermal pad material not stored in allocated location

5S check check,Daily PM check sheet need to display


Updated WI need to display
Magnifier in damage condition
Station 3,4 CGM not working
Failure unit not move to debug in ontime
Testing fixture equpiments connection open condition
CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Jig 2C, 2A – Grounding not done
Extra adaptor stored in CT stage

Un wanted empty bins stored in Voltage perameter test stage

other model(HY00A)unit storage in below location


Inproper cable routing (open condition )
thermal pad material not stored in allocated location

5S check check,Daily PM check sheet need to display


Updated WI need to display
Magnifier in damage condition
Station 3,4 CGM not working
Failure unit not move to debug in ontime
Testing fixture equpiments connection open condition
CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Jig 2C, 2A – Grounding not done
Extra adaptor stored in CT stage

Un wanted empty bins stored in Voltage perameter test stage

other model(HY00A)unit storage in below location


Inproper cable routing (open condition )
thermal pad material not stored in allocated location

5S check check,Daily PM check sheet need to display


Updated WI need to display
Magnifier in damage condition
Station 3,4 CGM not working
Failure unit not move to debug in ontime
Testing fixture equpiments connection open condition
CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Jig 2C, 2A – Grounding not done
Extra adaptor stored in CT stage

Un wanted empty bins stored in Voltage perameter test stage

other model(HY00A)unit storage in below location


Inproper cable routing (open condition )
thermal pad material not stored in allocated location

5S check check,Daily PM check sheet need to display


Updated WI need to display
Magnifier in damage condition
Station 3,4 CGM not working
Failure unit not move to debug in ontime
Testing fixture equpiments connection open condition
CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Jig 2C, 2A – Grounding not done
Extra adaptor stored in CT stage

Un wanted empty bins stored in Voltage perameter test stage

other model(HY00A)unit storage in below location


Inproper cable routing (open condition )
thermal pad material not stored in allocated location

5S check check,Daily PM check sheet need to display


Updated WI need to display
Magnifier in damage condition
Station 3,4 CGM not working
Failure unit not move to debug in ontime
Testing fixture equpiments connection open condition
CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Jig 2C, 2A – Grounding not done
Extra adaptor stored in CT stage

Un wanted empty bins stored in Voltage perameter test stage

other model(HY00A)unit storage in below location


Inproper cable routing (open condition )
thermal pad material not stored in allocated location

5S check check,Daily PM check sheet need to display


Updated WI need to display
Magnifier in damage condition
Station 3,4 CGM not working
Failure unit not move to debug in ontime
Testing fixture equpiments connection open condition
CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Jig 2C, 2A – Grounding not done
Extra adaptor stored in CT stage

Un wanted empty bins stored in Voltage perameter test stage

other model(HY00A)unit storage in below location


Inproper cable routing (open condition )
thermal pad material not stored in allocated location

5S check check,Daily PM check sheet need to display


Updated WI need to display
Magnifier in damage condition
Station 3,4 CGM not working
Failure unit not move to debug in ontime
Testing fixture equpiments connection open condition
CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Jig 2C, 2A – Grounding not done
Extra adaptor stored in CT stage

Un wanted empty bins stored in Voltage perameter test stage

other model(HY00A)unit storage in below location


Inproper cable routing (open condition )
thermal pad material not stored in allocated location

5S check check,Daily PM check sheet need to display


Updated WI need to display
Magnifier in damage condition
Station 3,4 CGM not working
Failure unit not move to debug in ontime
CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Jig 2C, 2A – Grounding not done
5S check check,Daily PM check sheet need to display
Updated WI need to display
Magnifier in damage condition
Station 3,4 CGM not working
Failure unit not move to debug in ontime
Un wanted empty bins stored in Voltage perameter test stage

other model(HY00A)unit storage in below location


Inproper cable routing (open condition )
thermal pad material not stored in allocated location

5S check check,Daily PM check sheet need to display


5S check check,Daily PM check sheet need to display
CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Jig 2C, 2A – Grounding not done
5S check check,Daily PM check sheet need to display
Updated WI need to display
Magnifier in damage condition
Station 3,4 CGM not working
Failure unit not move to debug in ontime
Un wanted empty bins stored in Voltage perameter test stage

other model(HY00A)unit storage in below location


Inproper cable routing (open condition )
thermal pad material not stored in allocated location

5S check check,Daily PM check sheet need to display


5S check check,Daily PM check sheet need to display
CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Jig 2C, 2A – Grounding not done
5S check check,Daily PM check sheet need to display
Updated WI need to display
Magnifier in damage condition
Station 3,4 CGM not working
Failure unit not move to debug in ontime
Un wanted empty bins stored in Voltage perameter test stage

other model(HY00A)unit storage in below location


Inproper cable routing (open condition )
thermal pad material not stored in allocated location

5S check check,Daily PM check sheet need to display


5S check check,Daily PM check sheet need to display
CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Jig 2C, 2A – Grounding not done
5S check check,Daily PM check sheet need to display
Updated WI need to display
Magnifier in damage condition
Station 3,4 CGM not working
Failure unit not move to debug in ontime
Un wanted empty bins stored in Voltage perameter test stage

other model(HY00A)unit storage in below location


Inproper cable routing (open condition )
thermal pad material not stored in allocated location

5S check check,Daily PM check sheet need to display


5S check check,Daily PM check sheet need to display
CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Jig 2C, 2A – Grounding not done
5S check check,Daily PM check sheet need to display
Updated WI need to display
Magnifier in damage condition
Station 3,4 CGM not working
Failure unit not move to debug in ontime
Un wanted empty bins stored in Voltage perameter test stage

other model(HY00A)unit storage in below location


Inproper cable routing (open condition )
thermal pad material not stored in allocated location

5S check check,Daily PM check sheet need to display


5S check check,Daily PM check sheet need to display
CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Jig 2C, 2A – Grounding not done
5S check check,Daily PM check sheet need to display
Updated WI need to display
Magnifier in damage condition
Station 3,4 CGM not working
Failure unit not move to debug in ontime
Un wanted empty bins stored in Voltage perameter test stage

other model(HY00A)unit storage in below location


Inproper cable routing (open condition )
thermal pad material not stored in allocated location

5S check check,Daily PM check sheet need to display


5S check check,Daily PM check sheet need to display
Extra adaptor stored in CT stage

Un wanted empty bins stored in Voltage perameter test stage

other model(HY00A)unit storage in below location


Inproper cable routing (open condition )
thermal pad material not stored in allocated location

Testing fixture equpiments connection open condition


CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Testing fixture equpiments connection open condition
CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Jig 2C, 2A – Grounding not done
Extra adaptor stored in CT stage

Un wanted empty bins stored in Voltage perameter test stage

other model(HY00A)unit storage in below location


Inproper cable routing (open condition )
thermal pad material not stored in allocated location

5S check check,Daily PM check sheet need to display


Updated WI need to display
Magnifier in damage condition
Station 3,4 CGM not working
Failure unit not move to debug in ontime
Testing fixture equpiments connection open condition
CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Jig 2C, 2A – Grounding not done
Extra adaptor stored in CT stage

Un wanted empty bins stored in Voltage perameter test stage

other model(HY00A)unit storage in below location


Inproper cable routing (open condition )
thermal pad material not stored in allocated location

5S check check,Daily PM check sheet need to display


Updated WI need to display
Magnifier in damage condition
Station 3,4 CGM not working
Failure unit not move to debug in ontime
Testing fixture equpiments connection open condition
CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Jig 2C, 2A – Grounding not done
Extra adaptor stored in CT stage

Un wanted empty bins stored in Voltage perameter test stage

other model(HY00A)unit storage in below location


Inproper cable routing (open condition )
thermal pad material not stored in allocated location

5S check check,Daily PM check sheet need to display


Updated WI need to display
Magnifier in damage condition
Station 3,4 CGM not working
Failure unit not move to debug in ontime
Testing fixture equpiments connection open condition
CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Jig 2C, 2A – Grounding not done
5S check check,Daily PM check sheet need to display
Updated WI need to display
Magnifier in damage condition
Station 3,4 CGM not working
Failure unit not move to debug in ontime
Testing fixture equpiments connection open condition
CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Jig 2C, 2A – Grounding not done
Extra adaptor stored in CT stage

Un wanted empty bins stored in Voltage perameter test stage


other model(HY00A)unit storage in below location
Inproper cable routing (open condition )
thermal pad material not stored in allocated location

5S check check,Daily PM check sheet need to display


5S check check,Daily PM check sheet need to display
Extra adaptor stored in CT stage

Un wanted empty bins stored in Voltage perameter test stage

other model(HY00A)unit storage in below location


Testing fixture equpiments connection open condition
CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Jig 2C, 2A – Grounding not done
Un wanted empty bins stored in Voltage perameter test stage

other model(HY00A)unit storage in below location


Inproper cable routing (open condition )
thermal pad material not stored in allocated location

5S check check,Daily PM check sheet need to display


Un wanted empty bins stored in Voltage perameter test stage

other model(HY00A)unit storage in below location


Testing fixture equpiments connection open condition
CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Jig 2C, 2A – Grounding not done
NCMR bin not available
Unit accumulated
Unit accumulated
Printing PM Date expired
Testing fixture equpiments connection open condition
CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Jig 2C, 2A – Grounding not done
5S check check,Daily PM check sheet need to display
Updated WI need to display
Magnifier in damage condition
Station 3,4 CGM not working
Failure unit not move to debug in ontime
Testing fixture equpiments connection open condition
CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Jig 2C, 2A – Grounding not done
Extra adaptor stored in CT stage

Un wanted empty bins stored in Voltage perameter test stage

other model(HY00A)unit storage in below location


Inproper cable routing (open condition )
thermal pad material not stored in allocated location

5S check check,Daily PM check sheet need to display


5S check check,Daily PM check sheet need to display
Extra adaptor stored in CT stage

Un wanted empty bins stored in Voltage perameter test stage

other model(HY00A)unit storage in below location


Inproper cable routing (open condition )
thermal pad material not stored in allocated location

5S check check,Daily PM check sheet need to display


Un wanted empty bins stored in Voltage perameter test stage

other model(HY00A)unit storage in below location


Testing fixture equpiments connection open condition
CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Jig 2C, 2A – Grounding not done
NCMR bin not available
Unit accumulated
Unit accumulated
Printing PM Date expired
Testing fixture equpiments connection open condition
CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Jig 2C, 2A – Grounding not done
5S check check,Daily PM check sheet need to display
Updated WI need to display
Magnifier in damage condition
Station 3,4 CGM not working
Failure unit not move to debug in ontime
Testing fixture equpiments connection open condition
CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Jig 2C, 2A – Grounding not done
Extra adaptor stored in CT stage

Testing fixture equpiments connection open condition


CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Jig 2C, 2A – Grounding not done
5S check check,Daily PM check sheet need to display
Updated WI need to display
Magnifier in damage condition
Station 3,4 CGM not working
Failure unit not move to debug in ontime
Testing fixture equpiments connection open condition
CGM mal function error
CGM mal function error
Jig 4A – CGM mal function error
CGM not working
Jig 2C, 2A – Grounding not done
Extra adaptor stored in CT stage

Un wanted empty bins stored in Voltage perameter test stage

other model(HY00A)unit storage in below location


Inproper cable routing (open condition )
thermal pad material not stored in allocated location
Responsible Target Date Status
Production 1-Aug-23 Closed
Production 1-Aug-23 Closed
Production 1-Aug-23 Closed
Testing 1-Aug-23 Closed
Production 1-Aug-23 Closed
Production 1-Aug-23 Closed

IE 1-Aug-23 Closed

Facility 1-Aug-23 Closed


process 1-Aug-23 Closed
Production 1-Aug-23 Closed
IE 1-Aug-23 Closed
IE 1-Aug-23 Closed
Testing 1-Aug-23 Closed
IE 1-Aug-23 Closed

IE 1-Aug-23 Closed

IE 1-Aug-23 Closed
Production 1-Aug-23 Closed
process 1-Aug-23 Closed
IE 1-Aug-23 Closed
process 1-Aug-23 Closed
Production 1-Aug-23 Closed
Testing 2-Aug-23 Closed
Testing 2-Aug-23 Closed
IE 2-Aug-23 Closed
Testing 2-Aug-23 Closed
Testing 2-Aug-23 Closed
Testing 2-Aug-23 Closed
IE 2-Aug-23 Closed
Production 2-Aug-23 Closed

Production 2-Aug-23 Closed


IE 2-Aug-23 Closed
Production 2-Aug-23 Closed
IE 2-Aug-23 Closed
Production 2-Aug-23 Closed
Production 2-Aug-23 Closed
Production 2-Aug-23 Closed
IE 2-Aug-23 Closed
IE 2-Aug-23 Closed
Production 2-Aug-23 Closed
Production 2-Aug-23 Closed
Production 2-Aug-23 Closed
Production 2-Aug-23 Closed
Production 3-Aug-23 Closed
Facility 3-Aug-23 Closed
Testing 3-Aug-23 Closed
Testing 3-Aug-23 Closed
Testing 3-Aug-23 Closed
Testing 3-Aug-23 Closed
Production 3-Aug-23 Closed
Production 3-Aug-23 Closed
Production 3-Aug-23 Closed
Facility 3-Aug-23 Closed
Production 3-Aug-23 Closed
Production 3-Aug-23 Closed
Production 3-Aug-23 Closed
Testing 3-Aug-23 Closed
Production 3-Aug-23 Closed
Production 3-Aug-23 Closed
Production 3-Aug-23 Closed
Testing 3-Aug-23 Closed

Production 3-Aug-23 Closed


Testing 3-Aug-23 Closed
Production 3-Aug-23 Closed
Production 4-Aug-23 Closed
Testing 4-Aug-23 Closed
IE 4-Aug-23 Closed
Testing 4-Aug-23 Closed
Facility 4-Aug-23 Closed
Facility 4-Aug-23 Closed
IT 4-Aug-23 Closed
Process 4-Aug-23 Closed
Testing 4-Aug-23 Closed
Facility 4-Aug-23 Closed
Production 4-Aug-23 Closed
Process 4-Aug-23 Closed
Process 4-Aug-23 Closed
Facility 4-Aug-23 Closed
Facility 4-Aug-23 Closed
Facility 4-Aug-23 Closed
Facility 4-Aug-23 Closed
Facility 4-Aug-23 Closed
Facility 4-Aug-23 Closed
Facility 4-Aug-23 Closed
Facility 4-Aug-23 Closed
Testing 5-Aug-23 Closed
Testing 5-Aug-23 Closed
Testing 5-Aug-23 Closed
Production 5-Aug-23 Closed
Production 5-Aug-23 Closed
Facility 5-Aug-23 Closed
Testing 5-Aug-23 Closed
Testing 5-Aug-23 Closed

Testing 5-Aug-23 Closed

Production 5-Aug-23 Closed


Testing 5-Aug-23 Closed
Facility 5-Aug-23 Closed
Production 5-Aug-23 Closed
Production 5-Aug-23 Closed
Testing 5-Aug-23 Closed
Testing 5-Aug-23 Closed
Testing 5-Aug-23 Closed
Production 5-Aug-23 Closed
Testing 5-Aug-23 Closed
Production 5-Aug-23 Closed
Production 5-Aug-23 Closed
Production 7-Aug-23 Closed
Facility 7-Aug-23 Closed
Testing 7-Aug-23 Closed
Testing 7-Aug-23 Closed

Production 7-Aug-23 Closed


Testing 7-Aug-23 Closed
Facility 7-Aug-23 Closed
Production 7-Aug-23 Closed
Production 7-Aug-23 Closed
Process 7-Aug-23 Closed
Process 7-Aug-23 Closed
Facility 7-Aug-23 Closed
Production 7-Aug-23 Closed
Testing 7-Aug-23 Closed
Production 7-Aug-23 Closed
Production 7-Aug-23 Closed
Production 7-Aug-23 Closed
Facility 7-Aug-23 Closed
Testing 7-Aug-23 Closed
Testing 7-Aug-23 Closed

Production 7-Aug-23 Closed


Testing 8-Aug-23 Closed
Facility 8-Aug-23 Closed
Production 8-Aug-23 Closed
Testing 8-Aug-23 Closed
Production 8-Aug-23 Closed
Production 8-Aug-23 Closed
Production 8-Aug-23 Closed
Facility 8-Aug-23 Closed
Testing 8-Aug-23 Closed
Production 8-Aug-23 Closed
Production 8-Aug-23 Closed
Production 8-Aug-23 Closed
Facility 8-Aug-23 Closed
Testing 8-Aug-23 Closed
Testing 8-Aug-23 Closed

Production 8-Aug-23 Closed


Testing 8-Aug-23 Closed
Facility 8-Aug-23 Closed
Production 8-Aug-23 Closed
Production 8-Aug-23 Closed
Process 8-Aug-23 Closed
Process 9-Aug-23 Closed
Facility 9-Aug-23 Closed
Production 9-Aug-23 Closed
Testing 9-Aug-23 Closed
Production 9-Aug-23 Closed
Production 9-Aug-23 Closed
Production 9-Aug-23 Closed
Facility 9-Aug-23 Closed
Testing 9-Aug-23 Closed
Testing 9-Aug-23 Closed

Production 9-Aug-23 Closed


Testing 9-Aug-23 Closed
Facility 9-Aug-23 Closed
Production 9-Aug-23 Closed
Production 9-Aug-23 Closed
Process 9-Aug-23 Closed
Process 9-Aug-23 Closed
Facility 9-Aug-23 Closed
Production 9-Aug-23 Closed
Testing 9-Aug-23 Closed
Production 9-Aug-23 Closed
Production 10-Aug-23 Closed
Production 10-Aug-23 Closed
Facility 10-Aug-23 Closed
Testing 10-Aug-23 Closed
Testing 10-Aug-23 Closed

Production 10-Aug-23 Closed


Testing 10-Aug-23 Closed
Facility 10-Aug-23 Closed
Production 10-Aug-23 Closed
Production 10-Aug-23 Closed
Process 10-Aug-23 Closed
Process 10-Aug-23 Closed
Facility 10-Aug-23 Closed
Production 10-Aug-23 Closed
Testing 10-Aug-23 Closed
Production 10-Aug-23 Closed
Production 10-Aug-23 Closed
Production 10-Aug-23 Closed
Facility 10-Aug-23 Closed
Testing 10-Aug-23 Closed
Testing 10-Aug-23 Closed

Production 11-Aug-23 Closed


Testing 11-Aug-23 Closed
Facility 11-Aug-23 Closed
Production 11-Aug-23 Closed
Production 11-Aug-23 Closed
Process 11-Aug-23 Closed
Process 11-Aug-23 Closed
Facility 11-Aug-23 Closed
Production 11-Aug-23 Closed
Testing 11-Aug-23 Closed
Production 11-Aug-23 Closed
Production 11-Aug-23 Closed
Production 11-Aug-23 Closed
Facility 11-Aug-23 Closed
Testing 11-Aug-23 Closed
Testing 11-Aug-23 Closed

Production 11-Aug-23 Closed


Testing 11-Aug-23 Closed
Facility 11-Aug-23 Closed
Production 11-Aug-23 Closed
Production 11-Aug-23 Closed
Process 12-Aug-23 Closed
Process 12-Aug-23 Closed
Facility 12-Aug-23 Closed
Production 12-Aug-23 Closed
Testing 12-Aug-23 Closed
Production 12-Aug-23 Closed
Production 12-Aug-23 Closed
Production 12-Aug-23 Closed
Facility 12-Aug-23 Closed
Testing 12-Aug-23 Closed
Testing 12-Aug-23 Closed

Production 12-Aug-23 Closed


Testing 12-Aug-23 Closed
Facility 12-Aug-23 Closed
Production 12-Aug-23 Closed
Production 12-Aug-23 Closed
Process 12-Aug-23 Closed
Process 12-Aug-23 Closed
Facility 12-Aug-23 Closed
Production 12-Aug-23 Closed
Testing 12-Aug-23 Closed
Production 14-Aug-23 Closed
Production 14-Aug-23 Closed
Production 14-Aug-23 Closed
Facility 14-Aug-23 Closed
Testing 14-Aug-23 Closed
Testing 14-Aug-23 Closed

Production 14-Aug-23 Closed


Testing 14-Aug-23 Closed
Facility 14-Aug-23 Closed
Production 14-Aug-23 Closed
Production 14-Aug-23 Closed
Process 14-Aug-23 Closed
Process 14-Aug-23 Closed
Facility 14-Aug-23 Closed
Production 14-Aug-23 Closed
Testing 14-Aug-23 Closed
Production 14-Aug-23 Closed
Production 14-Aug-23 Closed
Production 14-Aug-23 Closed
Facility 14-Aug-23 Closed
Testing 14-Aug-23 Closed
Testing 15-Aug-23 Closed

Production 15-Aug-23 Closed


Testing 15-Aug-23 Closed
Facility 15-Aug-23 Closed
Production 15-Aug-23 Closed
Production 15-Aug-23 Closed
Process 15-Aug-23 Closed
Process 15-Aug-23 Closed
Facility 15-Aug-23 Closed
Production 15-Aug-23 Closed
Testing 15-Aug-23 Closed
Production 15-Aug-23 Closed
Production 15-Aug-23 Closed
Production 15-Aug-23 Closed
Facility 15-Aug-23 Closed
Testing 15-Aug-23 Closed
Testing 15-Aug-23 Closed

Production 15-Aug-23 Closed


Testing 15-Aug-23 Closed
Facility 15-Aug-23 Closed
Production 15-Aug-23 Closed
Production 16-Aug-23 Closed
Process 16-Aug-23 Closed
Process 16-Aug-23 Closed
Facility 16-Aug-23 Closed
Production 16-Aug-23 Closed
Production 16-Aug-23 Closed
Production 16-Aug-23 Closed
Production 16-Aug-23 Closed
Facility 16-Aug-23 Closed
Testing 16-Aug-23 Closed
Production 16-Aug-23 Closed
Process 16-Aug-23 Closed
Process 16-Aug-23 Closed
Facility 16-Aug-23 Closed
Production 16-Aug-23 Closed
Production 16-Aug-23 Closed
Testing 16-Aug-23 Closed
Facility 16-Aug-23 Closed
Production 16-Aug-23 Closed
Production 16-Aug-23 Closed
Production 16-Aug-23 Closed
Production 17-Aug-23 Closed
Production 17-Aug-23 Closed
Production 17-Aug-23 Closed
Facility 17-Aug-23 Closed
Testing 17-Aug-23 Closed
Production 17-Aug-23 Closed
Process 17-Aug-23 Closed
Process 17-Aug-23 Closed
Facility 17-Aug-23 Closed
Production 17-Aug-23 Closed
Production 17-Aug-23 Closed
Testing 17-Aug-23 Closed
Facility 17-Aug-23 Closed
Production 17-Aug-23 Closed
Production 17-Aug-23 Closed
Production 17-Aug-23 Closed
Production 17-Aug-23 Closed
Production 17-Aug-23 Closed
Production 17-Aug-23 Closed
Facility 17-Aug-23 Closed
Testing 17-Aug-23 Closed
Production 18-Aug-23 Closed
Process 18-Aug-23 Closed
Process 18-Aug-23 Closed
Facility 18-Aug-23 Closed
Production 18-Aug-23 Closed
Production 18-Aug-23 Closed
Testing 18-Aug-23 Closed
Facility 18-Aug-23 Closed
Production 18-Aug-23 Closed
Production 18-Aug-23 Closed
Production 18-Aug-23 Closed
Production 18-Aug-23 Closed
Production 18-Aug-23 Closed
Production 18-Aug-23 Closed
Facility 18-Aug-23 Closed
Testing 18-Aug-23 Closed
Production 18-Aug-23 Closed
Process 18-Aug-23 Closed
Process 18-Aug-23 Closed
Facility 18-Aug-23 Closed
Production 18-Aug-23 Closed
Production 19-Aug-23 Closed
Testing 19-Aug-23 Closed
Facility 19-Aug-23 Closed
Production 19-Aug-23 Closed
Production 19-Aug-23 Closed
Production 19-Aug-23 Closed
Production 19-Aug-23 Closed
Production 19-Aug-23 Closed
Production 19-Aug-23 Closed
Facility 19-Aug-23 Closed
Testing 19-Aug-23 Closed
Production 19-Aug-23 Closed
Process 19-Aug-23 Closed
Process 19-Aug-23 Closed
Facility 19-Aug-23 Closed
Production 19-Aug-23 Closed
Production 19-Aug-23 Closed
Testing 19-Aug-23 Closed
Facility 19-Aug-23 Closed
Production 19-Aug-23 Closed
Production 19-Aug-23 Closed
Production 21-Aug-23 Closed
Production 21-Aug-23 Closed
Production 21-Aug-23 Closed
Production 21-Aug-23 Closed
Facility 21-Aug-23 Closed
Testing 21-Aug-23 Closed
Production 21-Aug-23 Closed
Process 21-Aug-23 Closed
Process 21-Aug-23 Closed
Facility 21-Aug-23 Closed
Production 21-Aug-23 Closed
Production 21-Aug-23 Closed
Testing 21-Aug-23 Closed
Facility 21-Aug-23 Closed
Production 21-Aug-23 Closed
Production 21-Aug-23 Closed
Production 21-Aug-23 Closed
Testing 21-Aug-23 Closed

Production 21-Aug-23 Closed


Testing 21-Aug-23 Closed
Facility 21-Aug-23 Closed
Production 22-Aug-23 Closed
Testing 22-Aug-23 Closed
Production 22-Aug-23 Closed
Production 22-Aug-23 Closed
Production 22-Aug-23 Closed
Facility 22-Aug-23 Closed
Testing 22-Aug-23 Closed
Production 22-Aug-23 Closed
Production 22-Aug-23 Closed
Production 22-Aug-23 Closed
Facility 22-Aug-23 Closed
Testing 22-Aug-23 Closed
Testing 22-Aug-23 Closed

Production 22-Aug-23 Closed


Testing 22-Aug-23 Closed
Facility 22-Aug-23 Closed
Production 22-Aug-23 Closed
Production 22-Aug-23 Closed
Process 22-Aug-23 Closed
Process 22-Aug-23 Closed
Facility 22-Aug-23 Closed
Production 23-Aug-23 Closed
Testing 23-Aug-23 Closed
Production 23-Aug-23 Closed
Production 23-Aug-23 Closed
Production 23-Aug-23 Closed
Facility 23-Aug-23 Closed
Testing 23-Aug-23 Closed
Testing 23-Aug-23 Closed

Production 23-Aug-23 Closed


Testing 23-Aug-23 Closed
Facility 23-Aug-23 Closed
Production 23-Aug-23 Closed
Production 23-Aug-23 Closed
Process 23-Aug-23 Closed
Process 23-Aug-23 Closed
Facility 23-Aug-23 Closed
Production 23-Aug-23 Closed
Testing 23-Aug-23 Closed
Production 23-Aug-23 Closed
Production 23-Aug-23 Closed
Production 23-Aug-23 Closed
Facility 24-Aug-23 Closed
Testing 24-Aug-23 Closed
Testing 24-Aug-23 Closed

Production 24-Aug-23 Closed


Testing 24-Aug-23 Closed
Facility 24-Aug-23 Closed
Production 24-Aug-23 Closed
Production 24-Aug-23 Closed
Process 24-Aug-23 Closed
Process 24-Aug-23 Closed
Facility 24-Aug-23 Closed
Production 24-Aug-23 Closed
Testing 24-Aug-23 Closed
Production 24-Aug-23 Closed
Production 24-Aug-23 Closed
Production 24-Aug-23 Closed
Facility 24-Aug-23 Closed
Testing 24-Aug-23 Closed
Production 24-Aug-23 Closed
Process 24-Aug-23 Closed
Process 24-Aug-23 Closed
Facility 25-Aug-23 Closed
Production 25-Aug-23 Closed
Testing 25-Aug-23 Closed
Production 25-Aug-23 Closed
Production 25-Aug-23 Closed
Production 25-Aug-23 Closed
Facility 25-Aug-23 Closed
Testing 25-Aug-23 Closed
Testing 25-Aug-23 Closed

Production 25-Aug-23 Closed


Testing 25-Aug-23 Closed
Facility 25-Aug-23 Closed
Production 25-Aug-23 Closed
Production 25-Aug-23 Closed
Production 25-Aug-23 Closed
Testing 25-Aug-23 Closed

Production 25-Aug-23 Closed


Testing 25-Aug-23 Closed
Testing 25-Aug-23 Closed
Production 25-Aug-23 Closed
Production 25-Aug-23 Closed
Production 26-Aug-23 Closed
Facility 26-Aug-23 Closed
Testing 26-Aug-23 Closed
Production 26-Aug-23 Closed
Testing 26-Aug-23 Closed
Facility 26-Aug-23 Closed
Production 26-Aug-23 Closed
Production 26-Aug-23 Closed
Production 26-Aug-23 Closed
Testing 26-Aug-23 Closed
Testing 26-Aug-23 Closed
Production 26-Aug-23 Closed
Production 26-Aug-23 Closed
Production 26-Aug-23 Closed
Facility 26-Aug-23 Closed
Testing 26-Aug-23 Closed
Production 26-Aug-23 Closed
Production 26-Aug-23 Closed
Production 26-Aug-23 Closed
Production 26-Aug-23 Closed
Testing 26-Aug-23 Closed
Production 28-Aug-23 Closed
Production 28-Aug-23 Closed
Production 28-Aug-23 Closed
Facility 28-Aug-23 Closed
Testing 28-Aug-23 Closed
Production 28-Aug-23 Closed
Process 28-Aug-23 Closed
Process 28-Aug-23 Closed
Facility 28-Aug-23 Closed
Production 28-Aug-23 Closed
Testing 28-Aug-23 Closed
Production 28-Aug-23 Closed
Production 28-Aug-23 Closed
Production 28-Aug-23 Closed
Facility 28-Aug-23 Closed
Testing 28-Aug-23 Closed
Testing 28-Aug-23 Closed

Production 28-Aug-23 Closed


Testing 28-Aug-23 Closed
Facility 28-Aug-23 Closed
Production 28-Aug-23 Closed
Production 29-Aug-23 Closed
Production 29-Aug-23 Closed
Testing 29-Aug-23 Closed

Production 29-Aug-23 Closed


Testing 29-Aug-23 Closed
Facility 29-Aug-23 Closed
Production 29-Aug-23 Closed
Production 29-Aug-23 Closed
Production 29-Aug-23 Closed
Testing 29-Aug-23 Closed
Testing 29-Aug-23 Closed
Production 29-Aug-23 Closed
Production 29-Aug-23 Closed
Production 29-Aug-23 Closed
Facility 29-Aug-23 Closed
Testing 29-Aug-23 Closed
Production 29-Aug-23 Closed
Production 29-Aug-23 Closed
Production 29-Aug-23 Closed
Production 29-Aug-23 Closed
Testing 29-Aug-23 Closed
Production 30-Aug-23 Closed
Production 30-Aug-23 Closed
Production 30-Aug-23 Closed
Facility 30-Aug-23 Closed
Testing 30-Aug-23 Closed
Production 30-Aug-23 Closed
Process 30-Aug-23 Closed
Process 30-Aug-23 Closed
Facility 30-Aug-23 Closed
Production 30-Aug-23 Closed
Testing 30-Aug-23 Closed
Production 30-Aug-23 Closed
Production 30-Aug-23 Closed
Production 30-Aug-23 Closed
Facility 30-Aug-23 Closed
Testing 30-Aug-23 Closed
Testing 30-Aug-23 Closed
Testing 30-Aug-23 Closed
Production 30-Aug-23 Closed
Production 30-Aug-23 Closed
Production 30-Aug-23 Closed
Production 31-Aug-23 Closed
Production 31-Aug-23 Closed
Production 31-Aug-23 Closed
Facility 31-Aug-23 Closed
Testing 31-Aug-23 Closed
Production 31-Aug-23 Closed
Process 31-Aug-23 Closed
Process 31-Aug-23 Closed
Facility 31-Aug-23 Closed
Production 31-Aug-23 Closed
Testing 31-Aug-23 Closed
Production 31-Aug-23 Closed
Production 31-Aug-23 Closed
Production 31-Aug-23 Closed
Facility 31-Aug-23 Closed
Testing 31-Aug-23 Closed
Testing 31-Aug-23 Closed

Production 31-Aug-23 Closed


Testing 31-Aug-23 Closed
Facility 31-Aug-23 Closed
Production 31-Aug-23 Closed